Lovasoa Christine Razanamahan |
September 7, 2020 |
Lovasoa Christine Razanamahan (September 7, 2020 – September 11, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I . Attended online meetings: a-EI regular team; b- brainstorming on COVID response and GIZ support; c-Prefabricated (energy & ICT) solution for OSBPs, d-Brainstorm: Promotional video’s, e-EABF-Concept Note WG05 Infra&Log Draft 20 08 20, f-NSC Rail Corridor Technical assistance meeting, g-Meeting with Ghanaian Nominee and the PIDA Team, h-CBN brief, i-CBN Market packaging weekly call, j-Internally meeting ahead of the meeting with NBF on NSC project
II-Reviewed: a- SDM Transactional working group minutes 02-09-2020
III. Drafted: a-CBN brief minutes, b-Agenda items SDM-NBF call on NSC, c- brainstorming on COVID response and GIZ support minutes, d- Minutes of meeting with Ghanaian Nominee and the PIDA Team, e-Resource mobilisation of water projects draft 1
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI: updated SDM Dashboard
VII: Organised: meeting between SDM team and NBF on NSC projects
Activity plan for Next Week:
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c-SDM Technical meeting, d- AUDA-NEPAD-GWP regular meeting, e-Kick off meeting with GIZ, f-CBN market packaging weekly call, g-PIDA PAP 2 Task Force meeting, h-PIDA PAP 2 implementation strategy, i-Meeting to discuss EI News Articles, j-Division update-Human Capital Institutions Development (HCID), k-WG Infrastructure and Connectivity
II. Draft: a- resource mobilisation strategies for water projects draft 1, b- Meeting between SDM and NBF on NSC project,
III-Review: a-report 1 Financing analysis PIDA PAP 2, b-SDM questionnaire, c-SDM Commitment letter French version, d-Update on Commitment letter to VBA, e-20200901 outlines PIDA PAP 2 Implementation Guidelines
IV Amend: a-draft minutes of meeting with Ghanaian Nominee and the PIDA Team
V-Search online: a-Water and Africa infrastructure news, b-LHWT research, c-Energy in Africa documents
|
I . Attended online meetings: a-EI regular team; b- brainstorming on COVID response and GIZ support; c-Prefabricated (energy & ICT) solution for OSBPs, d-Brainstorm: Promotional video’s, e-EABF-Concept Note WG05 Infra&Log Draft 20 08 20, f-NSC Rail Corridor Technical assistance meeting, g-Meeting with Ghanaian Nominee and the PIDA Team, h-CBN brief, i-CBN Market packaging weekly call, j-Internally meeting ahead of the meeting with NBF on NSC project
II-Reviewed: a- SDM Transactional working group minutes 02-09-2020
III. Drafted: a-CBN brief minutes, b-Agenda items SDM-NBF call on NSC, c- brainstorming on COVID response and GIZ support minutes, d- Minutes of meeting with Ghanaian Nominee and the PIDA Team, e-Resource mobilisation of water projects draft 1
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI: updated SDM Dashboard
VII: Organised: meeting between SDM team and NBF on NSC projects
|
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c-SDM Technical meeting, d- AUDA-NEPAD-GWP regular meeting, e-Kick off meeting with GIZ, f-CBN market packaging weekly call, g-PIDA PAP 2 Task Force meeting, h-PIDA PAP 2 implementation strategy, i-Meeting to discuss EI News Articles, j-Division update-Human Capital Institutions Development (HCID), k-WG Infrastructure and Connectivity
II. Draft: a- resource mobilisation strategies for water projects draft 1, b- Meeting between SDM and NBF on NSC project,
III-Review: a-report 1 Financing analysis PIDA PAP 2, b-SDM questionnaire, c-SDM Commitment letter French version, d-Update on Commitment letter to VBA, e-20200901 outlines PIDA PAP 2 Implementation Guidelines
IV Amend: a-draft minutes of meeting with Ghanaian Nominee and the PIDA Team
V-Search online: a-Water and Africa infrastructure news, b-LHWT research, c-Energy in Africa documents
|
|
|
|
Raymonde Nguena |
September 7, 2020 |
Raymonde Nguena (September 7, 2020 – September 11, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- Meeting to discuss EI news and articles
2-EI Team Regular meeting (online) and minutes taking
3- Weekly check-in with Dr. Towela
4- Prefabricated (energy & ICT) solution for OSBPs
Webinar attended:
1-online Liquid Telecom Cyber Security Services Launch
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
3- Draft the minutes for the last SDM technical Working Group meeting
Activity plan for Next Week:
Meeting to attend:
1- Meeting to discuss EI news and articles
2- Meeting with EndCode
3- SDM Transaction Working Group
4- EI Team Regular meeting (online)
5-Africa Public Procurement Platform Project – specifications/requirements and implementation model of the platform
6- SDM Expert Service Pool Technical Working Group
7- Weekly check-in with Dr. Towela
8- Meeting to discuss on how to channel EI Infrastructure News/Articles on KLM & VPIC Website
Webinar to attend
1- UNICEF Webinar: Launch of Draft Policy Guidance on AI for Children
Other tasks
1-Drafted: Minutes from the Transaction Working Group meeting; Minutes from the Technical Working Group meeting; EI minutes
2-Submission of a weekly report of news and articles on ICT in Africa
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
|
Meetings attended:
1- Meeting to discuss EI news and articles
2-EI Team Regular meeting (online) and minutes taking
3- Weekly check-in with Dr. Towela
4- Prefabricated (energy & ICT) solution for OSBPs
Webinar attended:
1-online Liquid Telecom Cyber Security Services Launch
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
3- Draft the minutes for the last SDM technical Working Group meeting
|
Meeting to attend:
1- Meeting to discuss EI news and articles
2- Meeting with EndCode
3- SDM Transaction Working Group
4- EI Team Regular meeting (online)
5-Africa Public Procurement Platform Project – specifications/requirements and implementation model of the platform
6- SDM Expert Service Pool Technical Working Group
7- Weekly check-in with Dr. Towela
8- Meeting to discuss on how to channel EI Infrastructure News/Articles on KLM & VPIC Website
Webinar to attend
1- UNICEF Webinar: Launch of Draft Policy Guidance on AI for Children
Other tasks
1-Drafted: Minutes from the Transaction Working Group meeting; Minutes from the Technical Working Group meeting; EI minutes
2-Submission of a weekly report of news and articles on ICT in Africa
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
|
|
|
|
Jose Luis Bobes |
August 31, 2020 |
Jose Luis Bobes (August 31, 2020 – September 4, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
Participating in webinars and virtual conferences
1. CBN Market Packaging regular weekly meeting
2. Implementation Guidelines
3. ISM Stakeholders meeting
4. New AUDA-NEPAD projects
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. VPIC Enhanced Usability ToR update
Progress per task
1. PPP Training Needs Assessment conclusions shared. Preparation of two different curricula in progress
2. Agreed on new TOR to enhance the usability of VPIP
3. Coordination of Energy NKE work:
4. Coordination of ICT NKE work:
5. Implementation Guidelines Table of Contents first draft
6. TOR for Pipeline Management tool pending feedback from Ibrah
7. EU Blending mechanisms for AUDA-NEPAD in preparation
Activity plan for Next Week:
Planned meetings
1. CBN Market Packaging regular weekly meeting
2. ISM Stakeholders meeting
3. EU ISM support to SDM and CBN 5% agenda:EU blending mechanism
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. EI weekly meeting
8. Implementation Guidelines planning
Planned activities per task
1. Progress on PIDA-PAP 2 Implementation Guidelines
2. Check EU blending mechanism for Projet de la route Ouesso-Bangui-N’Djamena et la navigation sur le fleuve Congo et ses affluents l’Oubangui et la Sangha and Ethiopia – Sudan interconnection
3. PPP Training Needs Assessment curriculum design
4. Update TOR to enhance the usability of VPIP: Present new candidates
5. Coordination of Energy NKE work:
6. Coordination of ICT NKE work:
7. Advance Pipeline Management tool definition
8. CBN 5% admin work support tbd with Ibrahim and Towela
Challenges requiring attention:
1. TOR for Transaction Pipeline tool
2. TOR admin support for SDM and CBN
3. Progress on VPIC TOR and candidates
4. Agreement on Implementation Guidelines Table of Contents
5. Define communications support needed by SDM
6. Clarification EI Team participation Africa-EU Business Forum
File attachments:
|
Participating in webinars and virtual conferences
1. CBN Market Packaging regular weekly meeting
2. Implementation Guidelines
3. ISM Stakeholders meeting
4. New AUDA-NEPAD projects
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. VPIC Enhanced Usability ToR update
Progress per task
1. PPP Training Needs Assessment conclusions shared. Preparation of two different curricula in progress
2. Agreed on new TOR to enhance the usability of VPIP
3. Coordination of Energy NKE work:
4. Coordination of ICT NKE work:
5. Implementation Guidelines Table of Contents first draft
6. TOR for Pipeline Management tool pending feedback from Ibrah
7. EU Blending mechanisms for AUDA-NEPAD in preparation
|
Planned meetings
1. CBN Market Packaging regular weekly meeting
2. ISM Stakeholders meeting
3. EU ISM support to SDM and CBN 5% agenda:EU blending mechanism
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. EI weekly meeting
8. Implementation Guidelines planning
Planned activities per task
1. Progress on PIDA-PAP 2 Implementation Guidelines
2. Check EU blending mechanism for Projet de la route Ouesso-Bangui-N’Djamena et la navigation sur le fleuve Congo et ses affluents l’Oubangui et la Sangha and Ethiopia – Sudan interconnection
3. PPP Training Needs Assessment curriculum design
4. Update TOR to enhance the usability of VPIP: Present new candidates
5. Coordination of Energy NKE work:
6. Coordination of ICT NKE work:
7. Advance Pipeline Management tool definition
8. CBN 5% admin work support tbd with Ibrahim and Towela
|
1. TOR for Transaction Pipeline tool
2. TOR admin support for SDM and CBN
3. Progress on VPIC TOR and candidates
4. Agreement on Implementation Guidelines Table of Contents
5. Define communications support needed by SDM
6. Clarification EI Team participation Africa-EU Business Forum
|
|
20200812-PPP-French-survey-results-and-comparison.pptx |
Lovasoa Christine Razanamahan |
August 31, 2020 |
Lovasoa Christine Razanamahan (August 31, 2020 – September 4, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I . Attended online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-internally preparatory meeting ahead the meeting with Lesotho Botswana Water Transfer (LBWT) project sponsor and ORASECOM, e-SDM Technical meeting, f- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM, g-SDM-IPPF on LBWT, h-Cybersecurity meeting
II-Reviewed: a- SDM Transactional working group minutes 26-08-2020
III. Drafted: a-water paper nexus approach draft 0, b-Energy outline paper draft 0
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI: updated SDM Dashboard
Activity plan for Next Week:
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c-SDM Technical meeting, d- AUDA-NEPAD-GWP regular meeting,
II. Draft: a- resource mobilisation strategies for water projects, b- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM,
|
I . Attended online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-internally preparatory meeting ahead the meeting with Lesotho Botswana Water Transfer (LBWT) project sponsor and ORASECOM, e-SDM Technical meeting, f- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM, g-SDM-IPPF on LBWT, h-Cybersecurity meeting
II-Reviewed: a- SDM Transactional working group minutes 26-08-2020
III. Drafted: a-water paper nexus approach draft 0, b-Energy outline paper draft 0
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI: updated SDM Dashboard
|
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c-SDM Technical meeting, d- AUDA-NEPAD-GWP regular meeting,
II. Draft: a- resource mobilisation strategies for water projects, b- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM,
|
|
|
|
Raymonde Nguena |
August 31, 2020 |
Raymonde Nguena (August 31, 2020 – September 4, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- Cybersecurity meting
2- JCT Benchmarks and Corridor debrief
3- SDM Transaction Working Group Meeting and minutes taking
4- EI Team Regular meeting (online) and minutes taking
5- Prefabricated (energy & ICT) solution for OSBPs and minutes taking
6- Weekly check-in with Dr. Towela
Webinar attended:
1-Africa #1: Effects of COVID-19 on the African Internet
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
Activity plan for Next Week:
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- Job Creation Toolkit meeting
3- EI Team Regular meeting (online) and minutes taking
4- SDM Technical Working Group
5- Weekly check-in with Dr. Towela
Webinar attended:
1-online Liquid Telecom Cyber Security Services Launch
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
3- Draft the minutes for the last SDM technical Working Group meeting
|
Meetings attended:
1- Cybersecurity meting
2- JCT Benchmarks and Corridor debrief
3- SDM Transaction Working Group Meeting and minutes taking
4- EI Team Regular meeting (online) and minutes taking
5- Prefabricated (energy & ICT) solution for OSBPs and minutes taking
6- Weekly check-in with Dr. Towela
Webinar attended:
1-Africa #1: Effects of COVID-19 on the African Internet
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
|
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- Job Creation Toolkit meeting
3- EI Team Regular meeting (online) and minutes taking
4- SDM Technical Working Group
5- Weekly check-in with Dr. Towela
Webinar attended:
1-online Liquid Telecom Cyber Security Services Launch
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
3- Draft the minutes for the last SDM technical Working Group meeting
|
|
|
|
Lovasoa Christine Razanamahan |
August 24, 2020 |
Lovasoa Christine Razanamahan (August 24, 2020 – August 28, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I . Attended online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-SDM Technical meeting, e- AUDA-NEPAD-GWP regular meeting, f-Directorate DPCD JICA collaboration, h-PIDA PAP 2 Job creation Toolkits 21-08-2020, i-PIDA PAP 2 Job creation Toolkits 24-08-2020, l- updates projects at EI division level
II-Reviewed: a- SDM Transactional working group minutes 19-08-2020, b-SDM projects folders
III. Drafted: a-minutes of AUDA-NEPAD-GWP regular meeting
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI. updated SDM Dashboard
Activity plan for Next Week:
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-internally preparatory meeting ahead the meeting with Lesotho Botswana Water Transfer (LBWT) project sponsor and ORASECOM, e-SDM Technical meeting, f- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM, g-SDM-IPPF on LBWT, h-Cybersecurity meeting
II-Review: a- SDM Transactional working group minutes 26-08-2020
III. Draft a-water paper nexus approach draft 0, b-Energy outline paper draft 0
IV. Search online: Water, Energy and Transport Africa infrastructure news,
V. Compile and circulate: Water, ICT, Energy and Transport Africa infrastructure news,
VI: Update SDM Dashboard
|
I . Attended online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-SDM Technical meeting, e- AUDA-NEPAD-GWP regular meeting, f-Directorate DPCD JICA collaboration, h-PIDA PAP 2 Job creation Toolkits 21-08-2020, i-PIDA PAP 2 Job creation Toolkits 24-08-2020, l- updates projects at EI division level
II-Reviewed: a- SDM Transactional working group minutes 19-08-2020, b-SDM projects folders
III. Drafted: a-minutes of AUDA-NEPAD-GWP regular meeting
IV. Searched online: Water, Energy and Transport Africa infrastructure news,
V. Compiled and circulated: Water, ICT, Energy and Transport Africa infrastructure news,
VI. updated SDM Dashboard
|
I . Attend online meetings: a-SDM Transactional Working Group; b-EI regular team; c- Internally SDM Dashboard meeting; d-internally preparatory meeting ahead the meeting with Lesotho Botswana Water Transfer (LBWT) project sponsor and ORASECOM, e-SDM Technical meeting, f- SDM meeting with Lesotho Botswana Water Transfer project sponsor and ORASECOM, g-SDM-IPPF on LBWT, h-Cybersecurity meeting
II-Review: a- SDM Transactional working group minutes 26-08-2020
III. Draft a-water paper nexus approach draft 0, b-Energy outline paper draft 0
IV. Search online: Water, Energy and Transport Africa infrastructure news,
V. Compile and circulate: Water, ICT, Energy and Transport Africa infrastructure news,
VI: Update SDM Dashboard
|
|
|
|
Raymonde Nguena |
August 24, 2020 |
Raymonde Nguena (August 24, 2020 – August 28, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3- Update on new projects meeting
4- JCT working group
5- Africa Public Procurement Platform Project
6- SDM Technical Working Group
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
Activity plan for Next Week:
Meetings to attend:
1- Cybersecurity meting
2- JCT Benchmarks and Corridor debrief
3- SDM Transaction Working Group Meeting and minutes taking
4- EI Team Regular meeting (online) and minutes taking
5- Prefabricated (energy & ICT) solution for OSBPs and minutes taking
6- Weekly check-in with Dr. Towela
Webinar to attend:
1-Africa #1: Effects of COVID-19 on the African Internet
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
|
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3- Update on new projects meeting
4- JCT working group
5- Africa Public Procurement Platform Project
6- SDM Technical Working Group
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
|
Meetings to attend:
1- Cybersecurity meting
2- JCT Benchmarks and Corridor debrief
3- SDM Transaction Working Group Meeting and minutes taking
4- EI Team Regular meeting (online) and minutes taking
5- Prefabricated (energy & ICT) solution for OSBPs and minutes taking
6- Weekly check-in with Dr. Towela
Webinar to attend:
1-Africa #1: Effects of COVID-19 on the African Internet
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Review of the talking point preparation for the IRENA Round table
3- Undertake research in order to profile a narrative for Inga 3 project for the JCT group
|
|
|
|
Lovasoa Christine Razanamahan |
August 17, 2020 |
Lovasoa Christine Razanamahan (August 17, 2020 – August 21, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings: a-EI regular meeting, b-SDM Call to project sponsors SADC and SARA internally meeting preparatory, c-SDM Call to project sponsors SADC and SARA, d-PIDA PAP 2 Task Force meeting, d-SDM Transactional Working Group, e-Internally meeting on PIDA PAP 2 implementation Strategy, f-Externally meeting on PIDA PAP 2 implementation Strategy, g-AUDA-NEPAD-GWP weekly meeting
II-Drafted and circulated: a-AUDA-NEPAD-GWP meeting minutes, b-Ad-Hoc Committee evaluation
III-reviewed and circulated documents: a-SDM transactional working group minutes, b-CEO Briefing note on PIDA PAP2 Egypt concerns, c-Working paper 5 on PIDA PAP 2, d-PIDA PAP 2 implementation strategy outline, e-PIDA Water resource mobilisation
IV-Researched online: a-Water, Energy and Transport weekly news, b-Secondary job generated by irrigation activities, c-Water papers
V-Compiled and circulated: a-Water, ICT, Energy and Transport weekly news
VI-Updated online SDM Monitoring Dashboard
Activity plan for Next Week:
I-To attend online meetings: a- EI regular meeting, b-AUDA-NEPAD-GWP weekly meeting, c-directorate meeting on JICA Collaboration, d-PIDA PAP 2 JOb creation toolkit meeting, e-PIDA PAP 2 Implementation strategy meeting,
II-To research online : a-Water, Energy and Transport weekly news, b-Secondary job generated by irrigation activities, c-Water papers
III-To compile and circulate: a-Water, ICT, Energy and Transport weekly news
IV-To review: a-SDM projects Folders, b-SDM Transactional working group minutes,
V-To update online SDM Monitoring Dashboard
|
I-Attended online meetings: a-EI regular meeting, b-SDM Call to project sponsors SADC and SARA internally meeting preparatory, c-SDM Call to project sponsors SADC and SARA, d-PIDA PAP 2 Task Force meeting, d-SDM Transactional Working Group, e-Internally meeting on PIDA PAP 2 implementation Strategy, f-Externally meeting on PIDA PAP 2 implementation Strategy, g-AUDA-NEPAD-GWP weekly meeting
II-Drafted and circulated: a-AUDA-NEPAD-GWP meeting minutes, b-Ad-Hoc Committee evaluation
III-reviewed and circulated documents: a-SDM transactional working group minutes, b-CEO Briefing note on PIDA PAP2 Egypt concerns, c-Working paper 5 on PIDA PAP 2, d-PIDA PAP 2 implementation strategy outline, e-PIDA Water resource mobilisation
IV-Researched online: a-Water, Energy and Transport weekly news, b-Secondary job generated by irrigation activities, c-Water papers
V-Compiled and circulated: a-Water, ICT, Energy and Transport weekly news
VI-Updated online SDM Monitoring Dashboard
|
I-To attend online meetings: a- EI regular meeting, b-AUDA-NEPAD-GWP weekly meeting, c-directorate meeting on JICA Collaboration, d-PIDA PAP 2 JOb creation toolkit meeting, e-PIDA PAP 2 Implementation strategy meeting,
II-To research online : a-Water, Energy and Transport weekly news, b-Secondary job generated by irrigation activities, c-Water papers
III-To compile and circulate: a-Water, ICT, Energy and Transport weekly news
IV-To review: a-SDM projects Folders, b-SDM Transactional working group minutes,
V-To update online SDM Monitoring Dashboard
|
|
|
|
Younes Touitha |
August 17, 2020 |
Younes Touitha (August 17, 2020 – August 21, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2 Job Creation Toolkit ;
– Remarks on : Animation_Storyboard / 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors;
– PIDA TASK force meeting PIDA PAP2;
– PIDA implementation strategy meeting.
Activity plan for Next Week:
– Join the DPDC meeting. AUDA-NEPAD, JICA collaboration, Home Grown Solution;
– Outline PIDA PAP2 Implementation Strategy;
– PIDA PAP2: Task force meeting Job creation estimates;
– Collaboration with members of the Task Force for monitoring missing information on projects in the North, in coordination with national focal points.
|
– PIDA PAP 2 Job Creation Toolkit ;
– Remarks on : Animation_Storyboard / 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors;
– PIDA TASK force meeting PIDA PAP2;
– PIDA implementation strategy meeting.
|
– Join the DPDC meeting. AUDA-NEPAD, JICA collaboration, Home Grown Solution;
– Outline PIDA PAP2 Implementation Strategy;
– PIDA PAP2: Task force meeting Job creation estimates;
– Collaboration with members of the Task Force for monitoring missing information on projects in the North, in coordination with national focal points.
|
|
|
|
Raymonde Nguena |
August 17, 2020 |
Raymonde Nguena (August 17, 2020 – August 21, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI weekly reporting introduction meeting
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Continue with research on ICT and renewable Energy
3- Writing and share the minutes from the technical working group
Activity plan for Next Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3- Update on new projects meeting
4- JCT working group
5- Africa Public Procurement Platform Project
6- SDM Technical Working Group
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Writing and share the minutes from the technical working group
|
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI weekly reporting introduction meeting
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Continue with research on ICT and renewable Energy
3- Writing and share the minutes from the technical working group
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3- Update on new projects meeting
4- JCT working group
5- Africa Public Procurement Platform Project
6- SDM Technical Working Group
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Writing and share the minutes from the technical working group
|
|
|
|
Younes Touitha |
August 10, 2020 |
Younes Touitha (August 10, 2020 – August 17, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2 Job Creation Toolkit Training;
– Webinar Division Update : Economic Integration;
– PIDA PAP2: Review Central region PIDA project (Transport);
– PIDA PAP2: Review across region projects;
– PIDA PAP2: Final review PIDA projects;
– PIDA implementation strategy meeting,
– Submitting remarks : WP5 / Continental Infrastructure Market and Demand Study for Africa;
– Submitting proposal letter for the workshop: Electricity market in North Africa.
Activity plan for Next Week:
– PIDA PAP 2 Job Creation Toolkit Training;
– Remarks on : Animation_Storyboard / 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors;
– PIDA TASK force meeting PIDA PAP2;
– PIDA implementation strategy meeting.
|
– PIDA PAP 2 Job Creation Toolkit Training;
– Webinar Division Update : Economic Integration;
– PIDA PAP2: Review Central region PIDA project (Transport);
– PIDA PAP2: Review across region projects;
– PIDA PAP2: Final review PIDA projects;
– PIDA implementation strategy meeting,
– Submitting remarks : WP5 / Continental Infrastructure Market and Demand Study for Africa;
– Submitting proposal letter for the workshop: Electricity market in North Africa.
|
– PIDA PAP 2 Job Creation Toolkit Training;
– Remarks on : Animation_Storyboard / 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors;
– PIDA TASK force meeting PIDA PAP2;
– PIDA implementation strategy meeting.
|
|
|
|
Raymonde Nguena |
August 10, 2020 |
Raymonde Nguena (August 10, 2020 – August 14, 2020) |
Other |
Update from Last Week:
Meeting attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3-SDM Technical Working Group Meeting and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertook on cybersecurity
3- Research undertook on ICT and renewable energy
Activity plan for Next Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI weekly reporting introduction meeting
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Continue with research on ICT and renewable Energy
3- Writting and share the minutes from the technical working group
|
Meeting attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
3-SDM Technical Working Group Meeting and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertook on cybersecurity
3- Research undertook on ICT and renewable energy
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- EI weekly reporting introduction meeting
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Continue with research on ICT and renewable Energy
3- Writting and share the minutes from the technical working group
|
|
|
|
Lovasoa Christine Razanamahan |
August 10, 2020 |
Lovasoa Christine Razanamahan (August 10, 2020 – August 14, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings: a-EI regular meeting, b-PIDA PAP 2 Validation of ECCAS projects, c- PIDA PAP 2 : Job creation Toolkit 6th August 2020, d-PIDA PAP 2 : Job creation Toolkit 7th August 2020, e-Internal meeting on PIDA PAP 2 Implementation Strategy, f-AUDA-NEPAD- GWP Weekly meeting, g-Mrs. Toussainte Memorial Service, h-PIDA PAP 2 : Job creation Toolkit 12nd August 2020, i-SDM Transactional group, j-External meeting on PIDA PAP 2 Implementation Strategy, l-PIDA PAP 2 screening meeting, m-monitoring Dashboard call
II-Drafted: a-Minutes of AUDA-NEPAD-GWP meeting, b-Response letter for Director, c-Resource mobilisation for water projects,
III- Researched online: a-water, Energy and transport weekly news, b-Secondary jobs generated by water projects on irrigation
IV-Compiled and circulated: a-Water, ICT, Energy and Transport weekly news,
V-Reviewed documents: a-performance reviewed mid-term
VI-Participated to Ad-Hoc Committe evaluation
Activity plan for Next Week:
I-To attend online meetings: a-EI regular meeting, b-PIDA PAP 2 job creation Toolkit 25th August 2020 , c-AUDA-NEPAD- GWP Weekly meeting, d-SDM Transactional working group, e-SDM Technical Working Group, f-PIDA PAP 2 Task Force meeting, g-SDM Call with project sponsors SADC-SARA, h-Internal meeting on PIDA PAP 2 Implementation Strategy, i-External meeting on PIDA PAP 2 Implementation Strategy
II-Draft: a-AUDA-NEPAD-GWP meeting minutes, b-
III-Research online: a-water, Energy and transport weekly news, b-Secondary jobs generated by water projects on irrigation (To be improved), c-water papers
IV-Compile and circulate: a-Water, ICT, Energy and Transport weekly news,
V-Review: a-minutes of EI regular team meeting, b-minutes of SDM transactional working group, c-minutes of SDM Technical working group
|
I-Attended online meetings: a-EI regular meeting, b-PIDA PAP 2 Validation of ECCAS projects, c- PIDA PAP 2 : Job creation Toolkit 6th August 2020, d-PIDA PAP 2 : Job creation Toolkit 7th August 2020, e-Internal meeting on PIDA PAP 2 Implementation Strategy, f-AUDA-NEPAD- GWP Weekly meeting, g-Mrs. Toussainte Memorial Service, h-PIDA PAP 2 : Job creation Toolkit 12nd August 2020, i-SDM Transactional group, j-External meeting on PIDA PAP 2 Implementation Strategy, l-PIDA PAP 2 screening meeting, m-monitoring Dashboard call
II-Drafted: a-Minutes of AUDA-NEPAD-GWP meeting, b-Response letter for Director, c-Resource mobilisation for water projects,
III- Researched online: a-water, Energy and transport weekly news, b-Secondary jobs generated by water projects on irrigation
IV-Compiled and circulated: a-Water, ICT, Energy and Transport weekly news,
V-Reviewed documents: a-performance reviewed mid-term
VI-Participated to Ad-Hoc Committe evaluation
|
I-To attend online meetings: a-EI regular meeting, b-PIDA PAP 2 job creation Toolkit 25th August 2020 , c-AUDA-NEPAD- GWP Weekly meeting, d-SDM Transactional working group, e-SDM Technical Working Group, f-PIDA PAP 2 Task Force meeting, g-SDM Call with project sponsors SADC-SARA, h-Internal meeting on PIDA PAP 2 Implementation Strategy, i-External meeting on PIDA PAP 2 Implementation Strategy
II-Draft: a-AUDA-NEPAD-GWP meeting minutes, b-
III-Research online: a-water, Energy and transport weekly news, b-Secondary jobs generated by water projects on irrigation (To be improved), c-water papers
IV-Compile and circulate: a-Water, ICT, Energy and Transport weekly news,
V-Review: a-minutes of EI regular team meeting, b-minutes of SDM transactional working group, c-minutes of SDM Technical working group
|
|
|
|
Lovasoa Christine Razanamahan |
August 3, 2020 |
Lovasoa Christine Razanamahan (August 3, 2020 – August 7, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meeting: a-EI regular meeting, b-Environment Sustainability collaboration , c-Greet and meet positive culture, d-General Sectoral PIDA PAP 2 Task Force meeting, e-PIDA Job creation toolkit, f-Review PIDA PAP 2 project , g-SDM Transactional group, h-EI Team: division update, i-PIDA PAP 2 Implementation strategy.
II-drafted: a-SDM water project list to UNCCD, b-Excel sheet on the Water job estimation toolkit with the EU-ISM consultant, c-minutes of PIDA PAP 2 implementation strategy meeting, b-EI weekly progress report
III-Researched online: a-water weekly news, b-Energy weekly news and c-Transport weekly news.
IV-Compiled Water, ICT, energy and Transport weekly news
V-Reviewed: minutes EI regular team meeting 30 July 2020
VI-Participated to AUDA-NEPAD Ad-Hoc Committee evaluation
VII-Circulated: a-review on minutes EI regular team meeting 30 July 2020 (MS teams), b-compiled Water, ICT, energy and Transport weekly news (email), c-ad-hoc evaluation sheet (email), d-minutes of PIDA PAP 2 implementation strategy meeting (Email)
Activity plan for Next Week:
I-attend online meeting: a-EI regular meeting, b-PIDA PAP 2 validation of ECCAS project, c-PIDA PAP 2 final validation meeting, d-PIDA PAP 2 job creation toolkit, e-SDM Transactional group, f-AUDA-NEPAD -GWP weekly meeting,
II-Research online on water weekly news
III-Review the working paper 5 on PIDA PAP 2 market and demand study
|
I-Attended online meeting: a-EI regular meeting, b-Environment Sustainability collaboration , c-Greet and meet positive culture, d-General Sectoral PIDA PAP 2 Task Force meeting, e-PIDA Job creation toolkit, f-Review PIDA PAP 2 project , g-SDM Transactional group, h-EI Team: division update, i-PIDA PAP 2 Implementation strategy.
II-drafted: a-SDM water project list to UNCCD, b-Excel sheet on the Water job estimation toolkit with the EU-ISM consultant, c-minutes of PIDA PAP 2 implementation strategy meeting, b-EI weekly progress report
III-Researched online: a-water weekly news, b-Energy weekly news and c-Transport weekly news.
IV-Compiled Water, ICT, energy and Transport weekly news
V-Reviewed: minutes EI regular team meeting 30 July 2020
VI-Participated to AUDA-NEPAD Ad-Hoc Committee evaluation
VII-Circulated: a-review on minutes EI regular team meeting 30 July 2020 (MS teams), b-compiled Water, ICT, energy and Transport weekly news (email), c-ad-hoc evaluation sheet (email), d-minutes of PIDA PAP 2 implementation strategy meeting (Email)
|
I-attend online meeting: a-EI regular meeting, b-PIDA PAP 2 validation of ECCAS project, c-PIDA PAP 2 final validation meeting, d-PIDA PAP 2 job creation toolkit, e-SDM Transactional group, f-AUDA-NEPAD -GWP weekly meeting,
II-Research online on water weekly news
III-Review the working paper 5 on PIDA PAP 2 market and demand study
|
|
|
|
Younes Touitha |
August 3, 2020 |
Younes Touitha (August 3, 2020 – August 7, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2 Job Creation Toolkit Training;
– PIDA PAP 2: ECCAS Projetcs and General Update;
– Programming (With Tich) of the webinar on the electricity market in North Africa (Program and invitation letter projects done);
– Sent comments of Working Paper 5: Implementation Risks and Mitigation Strategy.
Activity plan for Next Week:
– PIDA PAP 2 Job Creation Toolkit Training;
– Webinar Division Update : Economic Integration;
– PIDA PAP2: Review Central region PIDA project (Transport);
– PIDA PAP2: Review across region projects;
– PIDA PAP2: Final review PIDA projects;
– PIDA implementation strategy meeting.
|
– PIDA PAP 2 Job Creation Toolkit Training;
– PIDA PAP 2: ECCAS Projetcs and General Update;
– Programming (With Tich) of the webinar on the electricity market in North Africa (Program and invitation letter projects done);
– Sent comments of Working Paper 5: Implementation Risks and Mitigation Strategy.
|
– PIDA PAP 2 Job Creation Toolkit Training;
– Webinar Division Update : Economic Integration;
– PIDA PAP2: Review Central region PIDA project (Transport);
– PIDA PAP2: Review across region projects;
– PIDA PAP2: Final review PIDA projects;
– PIDA implementation strategy meeting.
|
|
|
|
Raymonde Nguena |
August 3, 2020 |
Raymonde Nguena (August 3, 2020 – August 7, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-PIDA Implementation Strategy
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertook on cybersecurity
3- Research undertook on ICT and renewable energy
Activity plan for Next Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-SDM Technical Working Group Meeting and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research to undertake on cybersecurity
3- Undertake research on ICT and renewable energy
|
Meetings attended:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-PIDA Implementation Strategy
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertook on cybersecurity
3- Research undertook on ICT and renewable energy
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-SDM Technical Working Group Meeting and minutes taking
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research to undertake on cybersecurity
3- Undertake research on ICT and renewable energy
|
|
|
|
Younes Touitha |
July 27, 2020 |
Younes Touitha (July 27, 2020 – July 31, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– Transport Sectoral PIDA Task force meeting;
– Energy Sectoral PIDA Task force meeting;
– General Sectoral PIDA Task force meeting;
– First Webinar on the African High Speed Railway Project;
– PIDA PAP 2 Implementation Strategy meeting.
Activity plan for Next Week:
– PIDA PAP 2 Job Creation Toolkit Training;
– PIDA PAP 2: ECCAS Projetcs and General Update;
– Programming (With Tich) of the webinar on the electricity market in North Africa (Program and invitation letter projects);
– analysis of Working Paper 5: Implementation Risks and Mitigation Strategy.
|
– Transport Sectoral PIDA Task force meeting;
– Energy Sectoral PIDA Task force meeting;
– General Sectoral PIDA Task force meeting;
– First Webinar on the African High Speed Railway Project;
– PIDA PAP 2 Implementation Strategy meeting.
|
– PIDA PAP 2 Job Creation Toolkit Training;
– PIDA PAP 2: ECCAS Projetcs and General Update;
– Programming (With Tich) of the webinar on the electricity market in North Africa (Program and invitation letter projects);
– analysis of Working Paper 5: Implementation Risks and Mitigation Strategy.
|
|
|
|
Lovasoa Christine Razanamahan |
July 27, 2020 |
Lovasoa Christine Razanamahan (July 27, 2020 – July 31, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-attended online meetings: a- EI regular meeting, b-Job Creation toolkit , c-SDM Transactional Working Group, d-Virtual farewell for Madam Lo & Mr Deen , e-UNECE webinar on design legal framework on Transboundary water Cooperation, f-AUDA-NEPAD-GWP weekly call, g-Revalidation of water projects in PIDA PAP 2 process.
II-drafted: a- AUDA-NEPAD-GWP meeting minutes, b-water paper, c-water and Africa infrastructure weekly news
III-Compiled and circulated: a- Water-ICT-Energy and transport Africa news
IV-Reviewed: a-SDM transactional working group minutes on 22 July 2020,
Activity plan for Next Week:
I-To attend online meeting: a-EI regular team meeting, b-General Sectoral PIDA Task force meeting, c-SDM Transactional working group, d-Job creation toolkit, e-Environmental Sustainability call, f- Meet and greet session, g-call with the project sponsor Lesotho Botswana Water Transfer,
II-To review documents: a- Working paper 5 on PIDA PAP 2 process
III-To finalize draft papers on: a-Water sector, b-PIDA PAP 1 and 2 criteria
IV-To analyse the Lesotho Highland Water project case
|
I-attended online meetings: a- EI regular meeting, b-Job Creation toolkit , c-SDM Transactional Working Group, d-Virtual farewell for Madam Lo & Mr Deen , e-UNECE webinar on design legal framework on Transboundary water Cooperation, f-AUDA-NEPAD-GWP weekly call, g-Revalidation of water projects in PIDA PAP 2 process.
II-drafted: a- AUDA-NEPAD-GWP meeting minutes, b-water paper, c-water and Africa infrastructure weekly news
III-Compiled and circulated: a- Water-ICT-Energy and transport Africa news
IV-Reviewed: a-SDM transactional working group minutes on 22 July 2020,
|
I-To attend online meeting: a-EI regular team meeting, b-General Sectoral PIDA Task force meeting, c-SDM Transactional working group, d-Job creation toolkit, e-Environmental Sustainability call, f- Meet and greet session, g-call with the project sponsor Lesotho Botswana Water Transfer,
II-To review documents: a- Working paper 5 on PIDA PAP 2 process
III-To finalize draft papers on: a-Water sector, b-PIDA PAP 1 and 2 criteria
IV-To analyse the Lesotho Highland Water project case
|
|
|
|
Raymonde Nguena |
July 27, 2020 |
Raymonde Nguena (July 27, 2020 – July 31, 2020) |
Other |
Update from Last Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Submission of a weekly report of news and articles on ICT in Africa
3- Research undertaking on cybersecurity
Activity plan for Next Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-PIDA Implementation Strategy
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertaking on cybersecurity
3- Undertake research on ICT and renewable energy
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Submission of a weekly report of news and articles on ICT in Africa
3- Research undertaking on cybersecurity
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT Working Group meeting
3- EI Team Regular meeting (online) and minutes taking
4-PIDA Implementation Strategy
Other tasks
1- Submission of a weekly report of news and articles on ICT in Africa
2- Research undertaking on cybersecurity
3- Undertake research on ICT and renewable energy
|
|
|
|
Lovasoa Christine Razanamahan |
July 20, 2020 |
Lovasoa Christine Razanamahan (July 20, 2020 – July 24, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-attended online meetings: a-SDM Transactional Working group, b-SDM Technical Working Group, c-PIDA Job creation toolkit session 17th July 2020, d-AUDA-NEPAD GWP weekly meeting, e-Webinar series on Water and Climate Change (9th and 16th July 2020 sessions), f-Webinar on Water-Energy-Food nexus SADC region, g-PIDA Implementation strategy with CPCS and GIZ,
II-reviewed documents: a- PIDA-PAP 2 implementation Strategy, b-ToRs on PIDA-PAP 2 financing strategy, c-Concept note on PIDA-PAP 2 financing strategy, d-Project Concept Memorandum Noumbiel Multipurpose dam,
III-Drafted and circulated: a-AUDA-NEPAD-GWP weekly meeting minutes, b-bullets points on PIDA Implementation strategy with CPCS and GIZ, c-mid-term performance review
IV-Researched online: a-water and Africa infrastructure weekly news, b-documents on PIDA PAP 1and PIDA PAP 2, c-Water projects
V-Assisted EI new volunteer: a-on SDM Technical meeting work group minutes template,
VI-Organised with GWP online calls: a-with the project sponsor of Lesotho Botswana Water project, b-with the project sponsor of Noordewer/Vioolsdrift Dam.
Activity plan for Next Week:
i-to attend online meetings: a-EI regular meeting, b-AUDA-GWP weekly meeting, c-SDM Transactional group meeting, d-Webinar series on Water and Climate Change (23rd July 2020 session),
ii-to review documents: a-SDM Transactionnal working group work plan, b- final ToRs of PIDA Implementation strategy
iii-to search online: a-weekly news on water and Africa Infrastructure, b-documents on water sector in corridor approach aspects, d-documents on PIDA PAP 1 and PIDA PAP 2
iv-to draft: a-minutes of AUDA-NEPAD and GWP weekly meeting, b-paper on water sector in corridor approach aspects, d- paper on PIDA PAP 1 and PIDA PAP 2
v-to amend the mid-term performance review
|
I-attended online meetings: a-SDM Transactional Working group, b-SDM Technical Working Group, c-PIDA Job creation toolkit session 17th July 2020, d-AUDA-NEPAD GWP weekly meeting, e-Webinar series on Water and Climate Change (9th and 16th July 2020 sessions), f-Webinar on Water-Energy-Food nexus SADC region, g-PIDA Implementation strategy with CPCS and GIZ,
II-reviewed documents: a- PIDA-PAP 2 implementation Strategy, b-ToRs on PIDA-PAP 2 financing strategy, c-Concept note on PIDA-PAP 2 financing strategy, d-Project Concept Memorandum Noumbiel Multipurpose dam,
III-Drafted and circulated: a-AUDA-NEPAD-GWP weekly meeting minutes, b-bullets points on PIDA Implementation strategy with CPCS and GIZ, c-mid-term performance review
IV-Researched online: a-water and Africa infrastructure weekly news, b-documents on PIDA PAP 1and PIDA PAP 2, c-Water projects
V-Assisted EI new volunteer: a-on SDM Technical meeting work group minutes template,
VI-Organised with GWP online calls: a-with the project sponsor of Lesotho Botswana Water project, b-with the project sponsor of Noordewer/Vioolsdrift Dam.
|
i-to attend online meetings: a-EI regular meeting, b-AUDA-GWP weekly meeting, c-SDM Transactional group meeting, d-Webinar series on Water and Climate Change (23rd July 2020 session),
ii-to review documents: a-SDM Transactionnal working group work plan, b- final ToRs of PIDA Implementation strategy
iii-to search online: a-weekly news on water and Africa Infrastructure, b-documents on water sector in corridor approach aspects, d-documents on PIDA PAP 1 and PIDA PAP 2
iv-to draft: a-minutes of AUDA-NEPAD and GWP weekly meeting, b-paper on water sector in corridor approach aspects, d- paper on PIDA PAP 1 and PIDA PAP 2
v-to amend the mid-term performance review
|
|
|
|
Younes Touitha |
July 20, 2020 |
Younes Touitha (July 20, 2020 – July 24, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– Webinar on Nexus Technical solutions in the Mediterranean : Experience and Opportunities (GWP);
– PIDA PAP 2 Implementation Strategy : Meeting Task Force + GIZ + CPCS;
– PIDA PAP 2 Job creation Estimate Data cleanning Report Sectorial;
– Virtual farewell for Madame Lo and Mr Deen;
– Completion of the questionnaire: Technical Assistance to UA: PPP;
– Review of PIDA PAP2 projects proposed by national focal points, and revalidation of projects;
– Project analysis of the final project report: 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors
Activity plan for Next Week:
– Transport Sectoral PIDA Task force meeting;
– Energy Sectoral PIDA Task force meeting;
– General Sectoral PIDA Task force meeting;
– First Webinar on the African High Speed Railway Project;
– PIDA PAP 2 Implementation Strategy meeting.
|
– Webinar on Nexus Technical solutions in the Mediterranean : Experience and Opportunities (GWP);
– PIDA PAP 2 Implementation Strategy : Meeting Task Force + GIZ + CPCS;
– PIDA PAP 2 Job creation Estimate Data cleanning Report Sectorial;
– Virtual farewell for Madame Lo and Mr Deen;
– Completion of the questionnaire: Technical Assistance to UA: PPP;
– Review of PIDA PAP2 projects proposed by national focal points, and revalidation of projects;
– Project analysis of the final project report: 17496 Projects Packaging for EAC-Based Multimodal Multisectoral Corridors
|
– Transport Sectoral PIDA Task force meeting;
– Energy Sectoral PIDA Task force meeting;
– General Sectoral PIDA Task force meeting;
– First Webinar on the African High Speed Railway Project;
– PIDA PAP 2 Implementation Strategy meeting.
|
|
|
|
Sami Hafnaoui |
July 20, 2020 |
Sami Hafnaoui (July 20, 2020 – July 24, 2020) |
Other |
Update from Last Week:
Participated in :
PRIDA M&E working group meeting.
PIDA PAP2 Job creation D.C. meeting.
UMA Internal IT system meeting.
Worked on the preparation of the blue print of the IT system of UMA.
Activity plan for Next Week:
|
Participated in :
PRIDA M&E working group meeting.
PIDA PAP2 Job creation D.C. meeting.
UMA Internal IT system meeting.
Worked on the preparation of the blue print of the IT system of UMA.
|
BAU
|
|
|
|
Raymonde Nguena |
July 20, 2020 |
Raymonde Nguena (July 20, 2020 – July 24, 2020) |
Other |
Update from Last Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
4- Meeting of introduction on SDM principle with Ibrah and Elsabeth
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Research undertaking on cybersecurity
3- Submission of a weekly report of news and articles on ICT in Africa
Activity plan for Next Week:
Meetings
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Continue with the information gathering regarding the CAPEX COST of some VPIC transport projects
2-Continue with research on cybersecurity within AUDA-NEPAD
3- Submission of a weekly report of news and articles on ICT in Africa
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
4- Meeting of introduction on SDM principle with Ibrah and Elsabeth
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Research undertaking on cybersecurity
3- Submission of a weekly report of news and articles on ICT in Africa
|
Meetings
1- SDM Transaction Working Group Meeting and minutes taking
2- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Continue with the information gathering regarding the CAPEX COST of some VPIC transport projects
2-Continue with research on cybersecurity within AUDA-NEPAD
3- Submission of a weekly report of news and articles on ICT in Africa
|
|
|
|
Sami Hafnaoui |
July 13, 2020 |
Sami Hafnaoui (July 13, 2020 – July 17, 2020) |
Other |
Update from Last Week:
Participated in:
ICT sectorial meeting for PIDA PAP2 projects.
Continental Transmission Masterplan, PIDA PAP2 and REC development plans
EU-AU Business Forum – Working Group on Digital Solutions
UMA meetings towards the preperation of their IT BluePrint.
PIDA PAP 2 Job Creation Toolkit Training
Activity plan for Next Week:
|
Participated in:
ICT sectorial meeting for PIDA PAP2 projects.
Continental Transmission Masterplan, PIDA PAP2 and REC development plans
EU-AU Business Forum – Working Group on Digital Solutions
UMA meetings towards the preperation of their IT BluePrint.
PIDA PAP 2 Job Creation Toolkit Training
|
BAU
|
|
|
|
Raymonde Nguena |
July 13, 2020 |
Raymonde Nguena (July 13, 2020 – July 17, 2020) |
Other |
Update from Last Week:
Meetings attended:
1- ICT Sectoral PIDA Taskforce meeting
2- Continental Transmission Masterplan, PIDA PAP2, and RES development plans;
3- CAPP contact
4- SDM Transaction Working Group and minutes taking
5- Performance review with Dr. Towela
6- JCT Working Group
7- EI Team Regular meeting (online) and minutes taking
8- SDM Expert Service Pool Technical Working Group and minutes taking
9- PIDA PAP 2 Job Creation Toolkit Training
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
Activity plan for Next Week:
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Submission of a weekly report of news and articles on ICT in Africa
|
Meetings attended:
1- ICT Sectoral PIDA Taskforce meeting
2- Continental Transmission Masterplan, PIDA PAP2, and RES development plans;
3- CAPP contact
4- SDM Transaction Working Group and minutes taking
5- Performance review with Dr. Towela
6- JCT Working Group
7- EI Team Regular meeting (online) and minutes taking
8- SDM Expert Service Pool Technical Working Group and minutes taking
9- PIDA PAP 2 Job Creation Toolkit Training
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
|
Meetings to attend:
1- SDM Transaction Working Group Meeting and minutes taking
2- JCT desktop research on construction values
3- EI Team Regular meeting (online) and minutes taking
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
2- Submission of a weekly report of news and articles on ICT in Africa
|
|
|
|
Raymonde Nguena |
July 6, 2020 |
Raymonde Nguena (July 6, 2020 – July 10, 2020) |
Other |
Update from Last Week:
Meetings:
1- Attend the Continental Master plan meeting;
2- Attend the ICT projects coordination meeting;
3- Job Creation Toolkit introduction call;
4- PIDA ICT projects upgrading meeting;
Activity plan for Next Week:
Meetings:
1- ICT Sectoral PIDA Taskforce meeting
2- Continental Transmission Masterplan, PIDA PAP2, and RES development plans;
3- CAPP contact
4- SDM Transaction Working Group and minutes taking
5- Performance review with Dr. Towela
6- JCT Working Group
7- EI Team Regular meeting (online) and minutes taking
8- SDM Expert Service Pool Technical Working Group and minutes taking
9- PIDA PAP 2 Job Creation Toolkit Training
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
|
Meetings:
1- Attend the Continental Master plan meeting;
2- Attend the ICT projects coordination meeting;
3- Job Creation Toolkit introduction call;
4- PIDA ICT projects upgrading meeting;
|
Meetings:
1- ICT Sectoral PIDA Taskforce meeting
2- Continental Transmission Masterplan, PIDA PAP2, and RES development plans;
3- CAPP contact
4- SDM Transaction Working Group and minutes taking
5- Performance review with Dr. Towela
6- JCT Working Group
7- EI Team Regular meeting (online) and minutes taking
8- SDM Expert Service Pool Technical Working Group and minutes taking
9- PIDA PAP 2 Job Creation Toolkit Training
Other tasks
1- Gathering information regarding the CAPEX COST of some VPIC transport projects and send to Sinalo;
|
|
|
|
Jose Luis Bobes |
July 6, 2020 |
Jose Luis Bobes (July 6, 2020 – July 10, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
Update from Last Week:
Participating in webinars and virtual conferences
1. OECD Quality Infrastructure for Africa in the 21st Century Paper contribution and meeting
2. CBN Market Packaging regular weekly meeting
3. ISM Stakeholders meeting
4. ICT Projects support coordination
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
Progress per task
1. PPP Training Needs Assessment form sent both in English and French and waiting for answers
2. TOR to enhance the usability of VPIP approved, Three first candidates already scored, waiting for the score of the four presented by AUDA
3. Coordination of Energy NKE work: No activity here due to connectivity issues in Ethiopia
4. Coordination of ICT NKE work: Working session and the first screening of PIDA-PAP 2 ICT projects
5. Implementation Strategy TOR final review
6. First draft TOR for Pipeline Management tool
7. CBN 5% regulatory barriers analysis to feed into harmonization paper
Activity plan for Next Week:
Planned meetings
1. CBN Market Packaging regular weekly meeting
2. ISM Stakeholders meeting
3. Continental transmission master plan
4. EU ISM support to SDM and CBN 5% agenda
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. EI weekly meeting
8. ICT Sectorial PIDA Task Force meeting
Planned activities per task
1. Check EU blending mechanism for Projet de la route Ouesso-Bangui-N’Djamena et la navigation sur le fleuve Congo et ses affluents l’Oubangui et la Sangha
1. PPP Training Needs Assessment reminder and analysis of answers
2. TOR to enhance the usability of VPIP: Confirm selected candidate
3. Coordination of Energy NKE work: Update after two weeks of connectivity issues
4. Coordination of ICT NKE work: Second working session screening of PIDA-PAP 2 ICT projects
5. Implementation Strategy follow up and clarification of tassks between current consultant and DT-Global
6. Advance Pipeline Management tool benchmark
7. CBN 5% work tbd with Ibrahim and Towela
Challenges requiring attention:
Need scoring of candidates of VPIC enhanced usability from Ephrem
Need final approved version of Implementation Strategy TOR
|
Update from Last Week:
Participating in webinars and virtual conferences
1. OECD Quality Infrastructure for Africa in the 21st Century Paper contribution and meeting
2. CBN Market Packaging regular weekly meeting
3. ISM Stakeholders meeting
4. ICT Projects support coordination
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
Progress per task
1. PPP Training Needs Assessment form sent both in English and French and waiting for answers
2. TOR to enhance the usability of VPIP approved, Three first candidates already scored, waiting for the score of the four presented by AUDA
3. Coordination of Energy NKE work: No activity here due to connectivity issues in Ethiopia
4. Coordination of ICT NKE work: Working session and the first screening of PIDA-PAP 2 ICT projects
5. Implementation Strategy TOR final review
6. First draft TOR for Pipeline Management tool
7. CBN 5% regulatory barriers analysis to feed into harmonization paper
|
Planned meetings
1. CBN Market Packaging regular weekly meeting
2. ISM Stakeholders meeting
3. Continental transmission master plan
4. EU ISM support to SDM and CBN 5% agenda
5. SDM Transaction working group
6. ISM TAF internal weekly meeting
7. EI weekly meeting
8. ICT Sectorial PIDA Task Force meeting
Planned activities per task
1. Check EU blending mechanism for Projet de la route Ouesso-Bangui-N’Djamena et la navigation sur le fleuve Congo et ses affluents l’Oubangui et la Sangha
1. PPP Training Needs Assessment reminder and analysis of answers
2. TOR to enhance the usability of VPIP: Confirm selected candidate
3. Coordination of Energy NKE work: Update after two weeks of connectivity issues
4. Coordination of ICT NKE work: Second working session screening of PIDA-PAP 2 ICT projects
5. Implementation Strategy follow up and clarification of tassks between current consultant and DT-Global
6. Advance Pipeline Management tool benchmark
7. CBN 5% work tbd with Ibrahim and Towela
|
Need scoring of candidates of VPIC enhanced usability from Ephrem
Need final approved version of Implementation Strategy TOR
|
|
|
Sami Hafnaoui |
July 6, 2020 |
Sami Hafnaoui (July 6, 2020 – July 10, 2020) |
Other |
Update from Last Week:
Participated in the ICT sectoral preparation meeting for PIDA PAP2 ICT projects
IT Blue print for UMA internal system.
PRIDA project.
Activity plan for Next Week:
|
Participated in the ICT sectoral preparation meeting for PIDA PAP2 ICT projects
IT Blue print for UMA internal system.
PRIDA project.
|
BAU
|
|
|
|
Lovasoa Christine Razanamahan |
June 29, 2020 |
Lovasoa Christine Razanamahan (June 29, 2020 – July 3, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meeting/webinars: a-EI Team regular meeting, b-INGA 3 Conference, c-AUDA-NEPAD-GWP weekly meeting, d-PIDA PAP 2 implementation strategy, e-INGA Plenary institution meeting, f-Weekly FNS Webinar, g-SDM workshop block 4
II-Reviewed: a-Minutes of SDM Transaction working group on 24 June 2020, b-presentation file on multinational Kenya Uganda Mombasa and Nairobi, Malaba Kampala Road
III-Drafted: a-matrix on water project draft submitted to PIDA PAP 2, b-first draft of AUDA-NEPAD-GWP meeting
IV-Followed up: a-water drafted projects in PIDA PAP 2 website
V-Updated the dashboard on the SDM water project progress
VI-Filled the PQL survey Sheet on SDM workshop
Activity plan for Next Week:
Not available (On leave up to 14 July 2020)
|
I-Attended online meeting/webinars: a-EI Team regular meeting, b-INGA 3 Conference, c-AUDA-NEPAD-GWP weekly meeting, d-PIDA PAP 2 implementation strategy, e-INGA Plenary institution meeting, f-Weekly FNS Webinar, g-SDM workshop block 4
II-Reviewed: a-Minutes of SDM Transaction working group on 24 June 2020, b-presentation file on multinational Kenya Uganda Mombasa and Nairobi, Malaba Kampala Road
III-Drafted: a-matrix on water project draft submitted to PIDA PAP 2, b-first draft of AUDA-NEPAD-GWP meeting
IV-Followed up: a-water drafted projects in PIDA PAP 2 website
V-Updated the dashboard on the SDM water project progress
VI-Filled the PQL survey Sheet on SDM workshop
|
Not available (On leave up to 14 July 2020)
|
|
|
|
Younes Touitha |
June 29, 2020 |
Younes Touitha (June 29, 2020 – July 3, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2 : Regional session UMA;
– Webinar: Refresher training on PIDA selection criteria and application: PIDA Task Force and CPCS;
– PIDA PAP 2 : Regional session EAC/IGAD;
– PIDA Task force coordination meeting;
– PIDA PAP 2: Regional session ECOWAS;
– Continental Power Systems Masterplan Baseline Study Inception Report and Virtual Consultation Meetings : AUDA-NEPAD, UMA, COMELEC, MS
Activity plan for Next Week:
– Meeting about Implementation Strategy TORs: AUDA-NEPAD Task Force;
– Final Wrap up session on submission of PIDA PAP2 projects: RECs and Task Force;
– Discussion AMI, Architectural desgin of OSBP`s: UMA and AfDB.
|
– PIDA PAP 2 : Regional session UMA;
– Webinar: Refresher training on PIDA selection criteria and application: PIDA Task Force and CPCS;
– PIDA PAP 2 : Regional session EAC/IGAD;
– PIDA Task force coordination meeting;
– PIDA PAP 2: Regional session ECOWAS;
– Continental Power Systems Masterplan Baseline Study Inception Report and Virtual Consultation Meetings : AUDA-NEPAD, UMA, COMELEC, MS
|
– Meeting about Implementation Strategy TORs: AUDA-NEPAD Task Force;
– Final Wrap up session on submission of PIDA PAP2 projects: RECs and Task Force;
– Discussion AMI, Architectural desgin of OSBP`s: UMA and AfDB.
|
|
|
|
Raymonde Nguena |
June 29, 2020 |
Raymonde Nguena (June 29, 2020 – July 3, 2020) |
Other |
Update from Last Week:
Meetings:
1- Implementation strategy meeting;
2- Attend the meeting on ICT ISM STE;
3- Attend the continental Master plan meeting;
4-EI team regular meeting. write the minutes and circulate it among the team;
5-Attend the Continental Power Systems Master Plan meeting.
6- Attend the SDM training meeting;
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update and schedule a meeting to discuss more about it.
Activity plan for Next Week:
Meetings:
1- Attend the Continental Master plan meeting;
2- Attend the ICT projects coordination meeting;
3- Job Creation Toolkit introduction call;
4- Performance review with Dr. Towela
5- PIDA ICT projects upgrading meeting;
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update
|
Meetings:
1- Implementation strategy meeting;
2- Attend the meeting on ICT ISM STE;
3- Attend the continental Master plan meeting;
4-EI team regular meeting. write the minutes and circulate it among the team;
5-Attend the Continental Power Systems Master Plan meeting.
6- Attend the SDM training meeting;
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update and schedule a meeting to discuss more about it.
|
Meetings:
1- Attend the Continental Master plan meeting;
2- Attend the ICT projects coordination meeting;
3- Job Creation Toolkit introduction call;
4- Performance review with Dr. Towela
5- PIDA ICT projects upgrading meeting;
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update
|
|
|
|
Sami Hafnaoui |
June 29, 2020 |
Sami Hafnaoui (June 29, 2020 – July 3, 2020) |
Other |
Update from Last Week:
Participated in the Implementation strategy meeting.
Participated in two meetings concerning Continental Master Plan.
Hold internal workshop for their IS blueprint.
Participated in the working session for the ME group (PRIDA)
Activity plan for Next Week:
|
Participated in the Implementation strategy meeting.
Participated in two meetings concerning Continental Master Plan.
Hold internal workshop for their IS blueprint.
Participated in the working session for the ME group (PRIDA)
|
BAU
|
|
|
|
Younes Touitha |
June 22, 2020 |
Younes Touitha (June 22, 2020 – June 26, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2: Thematic session on sustainable access to electricity in Africa. Bilingual;
– PIDA PAP 2 : Regional session ECCAC;
– PIDA PAP 2 : Thematic session on Graphical tools for presenting PIDA projects;
– Session on the transboundary water sector in the UMA region (AUDA-NEPAD, SASS, GWP);
– Inputs on the Implementation Strategy ToRs.
Activity plan for Next Week:
– PIDA PAP 2 : Regional session UMA;
– Webinar: Refresher training on PIDA selection criteria and application: PIDA Task Force and CPCS;
– PIDA PAP 2 : Regional session EAC/IGAD;
– PIDA Task force coordination meeting;
– PIDA PAP 2: Regional session ECOWAS;
– Continental Power Systems Masterplan Baseline Study Inception Report and Virtual Consultation Meetings : AUDA-NEPAD, UMA, COMELEC, MS
|
– PIDA PAP 2: Thematic session on sustainable access to electricity in Africa. Bilingual;
– PIDA PAP 2 : Regional session ECCAC;
– PIDA PAP 2 : Thematic session on Graphical tools for presenting PIDA projects;
– Session on the transboundary water sector in the UMA region (AUDA-NEPAD, SASS, GWP);
– Inputs on the Implementation Strategy ToRs.
|
– PIDA PAP 2 : Regional session UMA;
– Webinar: Refresher training on PIDA selection criteria and application: PIDA Task Force and CPCS;
– PIDA PAP 2 : Regional session EAC/IGAD;
– PIDA Task force coordination meeting;
– PIDA PAP 2: Regional session ECOWAS;
– Continental Power Systems Masterplan Baseline Study Inception Report and Virtual Consultation Meetings : AUDA-NEPAD, UMA, COMELEC, MS
|
|
|
|
Lovasoa Christine Razanamahan |
June 22, 2020 |
Lovasoa Christine Razanamahan (June 22, 2020 – June 26, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings: a-SDM transactional working group 18 June 2020, b-Thematic session on Graphical tools for presenting PIDA projects, c-EI Team regular meeting, d-ES-FNS Webinar preparatory meeting 18 June 2020, e-SDM ESP Technical Group, f- INGA 3 conference preparatory meeting 19 June 2020, g-AUDA-NEPAD-GWP-Med and NWAS/SAS call 19 June 2020, h-INGA 3 conference day 1, i- PIDA-PAP 2 refreshing training on the process, j-PIDA-PAP 2 UMA region last session, k-INGA 3 conference day 2, l-SDM Transactional group 24 June 2020, m-PIDA-PAP 2 EAC and IGAD last session, n-INGA Conference day 3
II-Reviewed: a-Compiled contribution from EI division to the Food and Nutrition Division, b-Power Point Presentation to the SDM ESP Technical work group on Noumbiel Multi-purpose Dam, c-EI team regular meeting minutes
III-drafted: a-matrix on Lusaka meeting and VPIC contact on water projects, b-matrix on L/RBOs in each REC, d-PIDA Water project status
IV-Supported Water projects submission in PIDA PAP 2: a-prepare water project submission from Volta Basin Authority (VBA), b-prepare water project submission from Lake Chad Basin Commission (LCBC), c-prepare water project submission from CICOS, d-liaise with ECCAS and ECOWAS water focal point,
V-Searched online: a-Water and Africa Infrastructure news, b-PIDA PAP 1 and PIDA PAP 2 criteria
Activity plan for Next Week:
I-To attend online meetings: a-SDM transactional working group 01 July 2020, b-SDM Workshop Training Block 3, c-EI Team regular meeting, d-ES-FNS Webinar preparatory meeting 30 June 2020, e-SDM ESP Technical Group 03rd of July 2020, f- INGA 3 conference day 4 to day 8, g-AUDA-NEPAD-GWP-SA weekly meeting 26 June 2020, h-PIDA PAP 2 Regional Session with ECOWAS last session 25 June 2020, i- PIDA-PAP 2 Final Wrap up session on submission of PIDA PAP2 projects 30 June 2020
II-to review: a-PIDA PAP 2 implementation strategy document
III-to draft: a-all PIDA PAP 2 remaining minutes, b-AUDA-NEPAD-GWP meeting minutes
IV-to search online: a-Water and Africa Infrastructure news, b-PIDA PAP 1 and PIDA PAP 2 criteria
|
I-Attended online meetings: a-SDM transactional working group 18 June 2020, b-Thematic session on Graphical tools for presenting PIDA projects, c-EI Team regular meeting, d-ES-FNS Webinar preparatory meeting 18 June 2020, e-SDM ESP Technical Group, f- INGA 3 conference preparatory meeting 19 June 2020, g-AUDA-NEPAD-GWP-Med and NWAS/SAS call 19 June 2020, h-INGA 3 conference day 1, i- PIDA-PAP 2 refreshing training on the process, j-PIDA-PAP 2 UMA region last session, k-INGA 3 conference day 2, l-SDM Transactional group 24 June 2020, m-PIDA-PAP 2 EAC and IGAD last session, n-INGA Conference day 3
II-Reviewed: a-Compiled contribution from EI division to the Food and Nutrition Division, b-Power Point Presentation to the SDM ESP Technical work group on Noumbiel Multi-purpose Dam, c-EI team regular meeting minutes
III-drafted: a-matrix on Lusaka meeting and VPIC contact on water projects, b-matrix on L/RBOs in each REC, d-PIDA Water project status
IV-Supported Water projects submission in PIDA PAP 2: a-prepare water project submission from Volta Basin Authority (VBA), b-prepare water project submission from Lake Chad Basin Commission (LCBC), c-prepare water project submission from CICOS, d-liaise with ECCAS and ECOWAS water focal point,
V-Searched online: a-Water and Africa Infrastructure news, b-PIDA PAP 1 and PIDA PAP 2 criteria
|
I-To attend online meetings: a-SDM transactional working group 01 July 2020, b-SDM Workshop Training Block 3, c-EI Team regular meeting, d-ES-FNS Webinar preparatory meeting 30 June 2020, e-SDM ESP Technical Group 03rd of July 2020, f- INGA 3 conference day 4 to day 8, g-AUDA-NEPAD-GWP-SA weekly meeting 26 June 2020, h-PIDA PAP 2 Regional Session with ECOWAS last session 25 June 2020, i- PIDA-PAP 2 Final Wrap up session on submission of PIDA PAP2 projects 30 June 2020
II-to review: a-PIDA PAP 2 implementation strategy document
III-to draft: a-all PIDA PAP 2 remaining minutes, b-AUDA-NEPAD-GWP meeting minutes
IV-to search online: a-Water and Africa Infrastructure news, b-PIDA PAP 1 and PIDA PAP 2 criteria
|
|
|
|
Raymonde Nguena |
June 22, 2020 |
Raymonde Nguena (June 22, 2020 – June 26, 2020) |
Other |
Update from Last Week:
Meetings:
1- PIDA Task force coordination meeting;
2- EI team regular meeting. write the minutes and circulate it among the team;
3- Regional PIDA Webinar with ECOWAS;
Other taks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- gather in a document the list of PIDA ICT projects on VPIC, their stage S1/S4 and the contact persons.
Activity plan for Next Week:
Meetings:
1- Implementation strategy ToRs
2- ICT ISM STE (NKE) Coordination;
3- Final Wrap up session on submission of PIDA PAP 2 projects;
4- Continental Master plan
5-EI team regular meeting. write the minutes and circulate it among the team;
6-Continental Power Systems Master Plan
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update
|
Meetings:
1- PIDA Task force coordination meeting;
2- EI team regular meeting. write the minutes and circulate it among the team;
3- Regional PIDA Webinar with ECOWAS;
Other taks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- gather in a document the list of PIDA ICT projects on VPIC, their stage S1/S4 and the contact persons.
|
Meetings:
1- Implementation strategy ToRs
2- ICT ISM STE (NKE) Coordination;
3- Final Wrap up session on submission of PIDA PAP 2 projects;
4- Continental Master plan
5-EI team regular meeting. write the minutes and circulate it among the team;
6-Continental Power Systems Master Plan
Other tasks:
1- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa;
2- Contact the owners of some PIDA ICT projects on VPIC for an update
|
|
|
|
Flore Kamdomg |
June 22, 2020 |
Flore Kamdomg (June 22, 2020 – June 26, 2020) |
Other |
Update from Last Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Follow up with Interpreters and finalise procurement process
– background support to the team coordinating the Inga Webinar Conference
Facilitate liaison communication between interpreters and IT for the Inga Meeting
– Write to Communication to assist us with the Farewell preparation
– Assist colleagues with database and BTOR of all PIDA meeting held last year 2019
– Send request to colleagues to hands written farewell messages for Mr Deen.
– Sent Elsa signed PPA to HR
Attend to EI Regular team meeting held on 26th June
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Finalise the leave roster and send to HR
– Attend to any other task assign by the Head of Division
Challenges requiring attention:
Challenges with Procurement process for the recruitment of the service provider to facilitate the Inga Webinar Conference held from 22nd to 29th July
Recommendations:
The management to emphasise with the Head of Procurement on the need for her team members to attend to queries and assist the projects team with relevant support when needed and on time to avoid last minutes running and stress working on weekend. we need to be more professional and appreciate the work of others.
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Follow up with Interpreters and finalise procurement process
– background support to the team coordinating the Inga Webinar Conference
Facilitate liaison communication between interpreters and IT for the Inga Meeting
– Write to Communication to assist us with the Farewell preparation
– Assist colleagues with database and BTOR of all PIDA meeting held last year 2019
– Send request to colleagues to hands written farewell messages for Mr Deen.
– Sent Elsa signed PPA to HR
Attend to EI Regular team meeting held on 26th June
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Finalise the leave roster and send to HR
– Attend to any other task assign by the Head of Division
|
Challenges with Procurement process for the recruitment of the service provider to facilitate the Inga Webinar Conference held from 22nd to 29th July
|
The management to emphasise with the Head of Procurement on the need for her team members to attend to queries and assist the projects team with relevant support when needed and on time to avoid last minutes running and stress working on weekend. we need to be more professional and appreciate the work of others.
|
|
Sami Hafnaoui |
June 22, 2020 |
Sami Hafnaoui (June 22, 2020 – June 26, 2020) |
Other |
Update from Last Week:
Participated in the PIDA PAP2 Regional session for Northern Region.
Participated in the Data Protection and Data Localisation working group meeting (PRIDA).
Worked on the internal IT system for the UMA with the UMA team.
Activity plan for Next Week:
|
Participated in the PIDA PAP2 Regional session for Northern Region.
Participated in the Data Protection and Data Localisation working group meeting (PRIDA).
Worked on the internal IT system for the UMA with the UMA team.
|
BAU.
|
|
|
|
Abdou Rahman Mboob |
June 15, 2020 |
Abdou Rahman Mboob (June 15, 2020 – June 19, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Attended and participated the listed activities below;
1. ICTN AUDA Meeting with IRENA
2. Thematic Session on financing of projects – by AfDB for PIDA PAP2 (English/French)
3. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
4. PIDA Taskforce coordination Meeting
5. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
6. PIDA Quality Label – Virtual Workshop
Activity plan for Next Week:
1. Meeting on Research Collaboration: AUDA NEPAD on ICTN Masterplan
2. Meeting of Taskforce with Directors
3. Thematic Webinar – Sustainable access to Energy – English/French
4. Regional consultation with – ECCAS
5. SDM Expert Service Pool (TWG) Meeting
6. SDM Workshop – PQL
7. Thematic Session on Graphical Tools for Presenting PIDA Projects
|
Attended and participated the listed activities below;
1. ICTN AUDA Meeting with IRENA
2. Thematic Session on financing of projects – by AfDB for PIDA PAP2 (English/French)
3. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
4. PIDA Taskforce coordination Meeting
5. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
6. PIDA Quality Label – Virtual Workshop
|
1. Meeting on Research Collaboration: AUDA NEPAD on ICTN Masterplan
2. Meeting of Taskforce with Directors
3. Thematic Webinar – Sustainable access to Energy – English/French
4. Regional consultation with – ECCAS
5. SDM Expert Service Pool (TWG) Meeting
6. SDM Workshop – PQL
7. Thematic Session on Graphical Tools for Presenting PIDA Projects
|
|
|
|
Lovasoa Christine Razanamahan |
June 15, 2020 |
Lovasoa Christine Razanamahan (June 15, 2020 – June 19, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-attended online meetings: a-SDM workshop block 1, b-GWP call on how to proceed with PIDA-PAP2, c-ALG presentation preparation for technical committee, d-PIDA PAP 2 implementation strategy internal discussion, e-AUDA-NEPAD and GWP weekly meeting, f-PIDA PAP 2 task force and Directors, g- PIDA PAP2 session on the electricity market session, h-SDM workshop block 2, i-PIDA PAP 2 ECCAS session
II-drafted: a-water and Africa infrastructure news, b-minutes of AUDA-NEPAD and GWP meeting, c-Slides presentation of Noumbiel multipurpose Dam project for SDM process, d-Ideas and speakers name of the webinar on Food insecurity and nutrition on post-COVID 19 period, e- CEO response letter to the AUC infrastructure and Energy Commission on Energy Task Force to COVID 19 response activities
III-Reviewed: a-minutes on SDM transactional group meeting 10 June 2020, b-presentation on Noumbiel multipurpose Dam
IV-Followed up the water project submission to PIDA PAP 2 website: a-liaise with water focal point ECCAS, ECOWAS and MUA, b-French translation of the email, c-gave advice on project packaging,
Activity plan for Next Week:
I-To attend online meetings: a-SDM workshop block 3, b-EI weekly meeting, c-Presentation preparation for technical committee meeting, d-SDM expert technical committee meeting, e-AUDA-NEPAD and GWP weekly meeting, f-PIDA PAP 2 Thematic session on Graphical tools for presenting PIDA projects, g- PIDA PAP2 Regional Session, h-PIDA PAP 2 Regional Session with EAC/IGAD members, i-SDM transactional group meeting
II-To draft : a-water and Africa infrastructure news, b-minutes of AUDA-NEPAD and GWP meeting, c-PIDA PAP 2 Thematic session on Graphical tools for presenting PIDA projects, d- PIDA PAP2 Regional Session, e-PIDA PAP 2 Regional Session with EAC/IGAD members,
III-To follow up the water project submission to PIDA PAP 2 website: a-liaise with water focal point ECCAS, ECOWAS and MUA, b-French translation of the email, c-gave advice on project packaging,
|
I-attended online meetings: a-SDM workshop block 1, b-GWP call on how to proceed with PIDA-PAP2, c-ALG presentation preparation for technical committee, d-PIDA PAP 2 implementation strategy internal discussion, e-AUDA-NEPAD and GWP weekly meeting, f-PIDA PAP 2 task force and Directors, g- PIDA PAP2 session on the electricity market session, h-SDM workshop block 2, i-PIDA PAP 2 ECCAS session
II-drafted: a-water and Africa infrastructure news, b-minutes of AUDA-NEPAD and GWP meeting, c-Slides presentation of Noumbiel multipurpose Dam project for SDM process, d-Ideas and speakers name of the webinar on Food insecurity and nutrition on post-COVID 19 period, e- CEO response letter to the AUC infrastructure and Energy Commission on Energy Task Force to COVID 19 response activities
III-Reviewed: a-minutes on SDM transactional group meeting 10 June 2020, b-presentation on Noumbiel multipurpose Dam
IV-Followed up the water project submission to PIDA PAP 2 website: a-liaise with water focal point ECCAS, ECOWAS and MUA, b-French translation of the email, c-gave advice on project packaging,
|
I-To attend online meetings: a-SDM workshop block 3, b-EI weekly meeting, c-Presentation preparation for technical committee meeting, d-SDM expert technical committee meeting, e-AUDA-NEPAD and GWP weekly meeting, f-PIDA PAP 2 Thematic session on Graphical tools for presenting PIDA projects, g- PIDA PAP2 Regional Session, h-PIDA PAP 2 Regional Session with EAC/IGAD members, i-SDM transactional group meeting
II-To draft : a-water and Africa infrastructure news, b-minutes of AUDA-NEPAD and GWP meeting, c-PIDA PAP 2 Thematic session on Graphical tools for presenting PIDA projects, d- PIDA PAP2 Regional Session, e-PIDA PAP 2 Regional Session with EAC/IGAD members,
III-To follow up the water project submission to PIDA PAP 2 website: a-liaise with water focal point ECCAS, ECOWAS and MUA, b-French translation of the email, c-gave advice on project packaging,
|
|
|
|
Raymonde Nguena |
June 15, 2020 |
Raymonde Nguena (June 15, 2020 – June 23, 2020) |
Other |
Update from Last Week:
I- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
II- Write the minutes of the EI team regular meeting and circulate it among the team
III- Attended a webinar via Teams Live- Tech in Africa series: part one, 18 June 2020
Activity plan for Next Week:
– Working on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Organizing the EI regular meeting
|
I- Elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
II- Write the minutes of the EI team regular meeting and circulate it among the team
III- Attended a webinar via Teams Live- Tech in Africa series: part one, 18 June 2020
|
– Working on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Organizing the EI regular meeting
|
|
|
|
Sami Hafnaoui |
June 15, 2020 |
Sami Hafnaoui (June 15, 2020 – June 19, 2020) |
Other |
Update from Last Week:
Workded on the internal IS of UMA under the supervision of the SG.
Participated in the SDM Expert Service Pool Technical Working Group meeting.
SDM training.
Participated in session on Graphical tools for presenting PIDA projects.
Participated in the session on sustainable Energy access in Africa.
Activity plan for Next Week:
|
Workded on the internal IS of UMA under the supervision of the SG.
Participated in the SDM Expert Service Pool Technical Working Group meeting.
SDM training.
Participated in session on Graphical tools for presenting PIDA projects.
Participated in the session on sustainable Energy access in Africa.
|
BAU
|
|
|
|
Jose Luis Bobes |
June 15, 2020 |
Jose Luis Bobes (June 15, 2020 – June 19, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Participating in webinars and virtual conferences
1. Thematic Session on the financing of projects – by AfDB for PIDA PAP2 (English/French)
2. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
3. PIDA Taskforce coordination Meeting
4. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
5. PIDA Quality Label training
6. ISM stakeholder meeting and ISM internal meeting
7. Webinar sustainable energy access
PPP Training Needs Assessment form finished, database and letter ready to send. We agreed to send test first.
TOR to enhance the usability of VPIP approved, Scored the three candidates
Coordination of Energy NKE work: Inception Report and Harmonisation paper
Coordination of ICT NKE work: Inception Report and Harmonisation paper
Coordination AUDA-GIZ-EU-ISM work plan meeting
Activity plan for Next Week:
Final version Implementation Strategy TOR, which also includes Operational Manual TOR
Harmonization reports for Energy and ICT NKE
New format Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ request to man pipeline management/CBN support
Collect database to Send PPP TNA survey to all stakeholders
Challenges requiring attention:
Recommendations:
|
Participating in webinars and virtual conferences
1. Thematic Session on the financing of projects – by AfDB for PIDA PAP2 (English/French)
2. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
3. PIDA Taskforce coordination Meeting
4. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
5. PIDA Quality Label training
6. ISM stakeholder meeting and ISM internal meeting
7. Webinar sustainable energy access
PPP Training Needs Assessment form finished, database and letter ready to send. We agreed to send test first.
TOR to enhance the usability of VPIP approved, Scored the three candidates
Coordination of Energy NKE work: Inception Report and Harmonisation paper
Coordination of ICT NKE work: Inception Report and Harmonisation paper
Coordination AUDA-GIZ-EU-ISM work plan meeting
|
Final version Implementation Strategy TOR, which also includes Operational Manual TOR
Harmonization reports for Energy and ICT NKE
New format Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ request to man pipeline management/CBN support
Collect database to Send PPP TNA survey to all stakeholders
|
None this week
|
None this week
|
|
Flore Kamdomg |
June 15, 2020 |
Flore Kamdomg (June 15, 2020 – June 19, 2020) |
Other |
Update from Last Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on Preparation of Mr Deen’s farewell
– Received request from HR to prepare budget for the farewell
– Budget drafted and submitted to Head of HR as requested
– Drafting of approve memo for the farewell and submitted to HR for CEO’S kind approval.
– Conducted research and elaborate weekly report summary of current news on Africa Transport,
Energy and Infrastructure sectors
– Received summaries report of Water and ICT articles from colleagues working on these sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure
sectors in Africa and submit to the Head of Division
– Attended to EI Regular team meeting
– Follow up with Procurement for the recruitment of the Interpretation services.
– Saturday 20th, participate to the preliminary induction meeting with the AUDA IT Unit, the DRC/Nairobi Stakeholders and Interpreters team for the planned Grand Inga Webinar Conference taking place from 22nd to 26th June.
– Sunday 21st continue follow up with procurement on interpreters contract.
– Background support provided to the team during the workshop
– Follow up with EI colleagues to update their leave days and encourage them to take leave as per HR recommendation.
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– finalise the leave roster and send to HR
Challenges requiring attention:
Recommendations:
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on Preparation of Mr Deen’s farewell
– Received request from HR to prepare budget for the farewell
– Budget drafted and submitted to Head of HR as requested
– Drafting of approve memo for the farewell and submitted to HR for CEO’S kind approval.
– Conducted research and elaborate weekly report summary of current news on Africa Transport,
Energy and Infrastructure sectors
– Received summaries report of Water and ICT articles from colleagues working on these sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure
sectors in Africa and submit to the Head of Division
– Attended to EI Regular team meeting
– Follow up with Procurement for the recruitment of the Interpretation services.
– Saturday 20th, participate to the preliminary induction meeting with the AUDA IT Unit, the DRC/Nairobi Stakeholders and Interpreters team for the planned Grand Inga Webinar Conference taking place from 22nd to 26th June.
– Sunday 21st continue follow up with procurement on interpreters contract.
– Background support provided to the team during the workshop
– Follow up with EI colleagues to update their leave days and encourage them to take leave as per HR recommendation.
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up with HR for the farewell preparation
– Continue to research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– finalise the leave roster and send to HR
|
None
|
None
|
|
Abdou Rahman Mboob |
June 8, 2020 |
Abdou Rahman Mboob (June 8, 2020 – June 12, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Participate and attended in the following
1. PIDA PAP2 Coordination Meeting with IRENA
2. PIDA PAP2 training session for North Africa Region (French & English)
3. Regional PIDA PAP2 Session for SADC & COMESA member States Focal Points – PIDA Project Selection listing
4. Webinar – Presentation and Validation of IRIMP Report for IGAD – ICT, Transport, Energy & Water (Two Sessions)
5. Virtual meeting with AfDB with GEIDCO
6. SDM Technical working group meeting
Activity plan for Next Week:
To attend and participate is the listed activities below;
1. ICTN AUDA Meeting with IRENA
2. Thematic Session on financing of projects – by AfDB for PIDA PAP2 (English/French)
3. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
4. PIDA Taskforce coordination Meeting
5. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
6. PIDA Quality Label – Virtual Workshop
|
Participate and attended in the following
1. PIDA PAP2 Coordination Meeting with IRENA
2. PIDA PAP2 training session for North Africa Region (French & English)
3. Regional PIDA PAP2 Session for SADC & COMESA member States Focal Points – PIDA Project Selection listing
4. Webinar – Presentation and Validation of IRIMP Report for IGAD – ICT, Transport, Energy & Water (Two Sessions)
5. Virtual meeting with AfDB with GEIDCO
6. SDM Technical working group meeting
|
To attend and participate is the listed activities below;
1. ICTN AUDA Meeting with IRENA
2. Thematic Session on financing of projects – by AfDB for PIDA PAP2 (English/French)
3. Regional PIDA PAP 2 Consultation webinar – for COMESA Member States
4. PIDA Taskforce coordination Meeting
5. Meeting – Review of PIDA PAP2 – Implementation Strategy TOR.
6. PIDA Quality Label – Virtual Workshop
|
|
|
|
Younes Touitha |
June 8, 2020 |
Younes Touitha (June 8, 2020 – June 12, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2: Webinar regional session UMA French speaking;
– PIDA PAP 2: Webinar regional session English speaking;
– PIDA PAP 2: Webinar session IGAD;
– Call with CPCS : Definition of norms and standards of railways Network with CPCS
Activity plan for Next Week:
– PIDA PAP 2 : Thematic session on financing of projects English session;
– PIDA PAP 2 : Thematic session on financing of projects French session;
– Regular Task Force meeting;
– Inputs on the draft Implentation Strategy ToRs;
– Task Force meeting :Draft Implentation Strategy ToRs;
– Participation in the Workshop PIDA Quality Label.
|
– PIDA PAP 2: Webinar regional session UMA French speaking;
– PIDA PAP 2: Webinar regional session English speaking;
– PIDA PAP 2: Webinar session IGAD;
– Call with CPCS : Definition of norms and standards of railways Network with CPCS
|
– PIDA PAP 2 : Thematic session on financing of projects English session;
– PIDA PAP 2 : Thematic session on financing of projects French session;
– Regular Task Force meeting;
– Inputs on the draft Implentation Strategy ToRs;
– Task Force meeting :Draft Implentation Strategy ToRs;
– Participation in the Workshop PIDA Quality Label.
|
|
|
|
Lovasoa Christine Razanamahan |
June 8, 2020 |
Lovasoa Christine Razanamahan (June 8, 2020 – June 12, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-attended online meetings: a-UMA Training on PIDA PAP 2 process English Session, b-EI regular meeting, c-SDM -ALG-GIZ meeting to prepare the transaction working group, d-ES FNS Webinar meeting preparation, e-Thematic session on Financing of PIDA PAP 2 projects English speaking, f-PIDA PAP 2 task force AUDA-NEPAD on the implementation strategy of PIDA PAP 2 projects, g- SDM Transaction working group meeting, h-Regional PIDA PAP 2 webinar for COMESA bilingual session, i-PIDA PAP 2 task force coordination, j-AUDA-NEPAD and GWP weekly meeting, k-SDM expert technical committee group meeting, l-call with DBSA on Lesotho Highlands water projects, m-SDM -ALG special meeting to prepare the SDM expert technical committee group meeting.
II-Drafted: a-minutes of SDM Technical committee meeting, b-AUDA-NEPAD and GWP weekly meeting, c-some ideas on EI contribution to the ES FNS webinar, d-project notifications for Burkina-Faso -Benin Optical Fibre Link for SDM process, e-project notifications for Noordoewever-Vioolsdrift Dam for SDM process, f-Update the Dashboard of the Burkina-Faso -Benin Optical Fibre Link project, g-agenda items of AUDA-GWP weekly meeting
III-Searched online water and infrastructure in Africa news
IV-Reviewed: a- PIDA PAP 2 implementation strategy ToR, b-minutes of the SDM Transaction working group meeting, c-minutes of SDM -ALG special meeting to prepare the SDM expert technical committee group meeting, d-agenda draft of the 2020-06-10 SDM Transaction working group meeting, e-concept note of the ES FNS Webinar
V-Circulated: a-EI regular meeting cancellation to the EI team members, b- ES FNS Webinar preparation to EI team members,
Activity plan for Next Week:
I-attend online meetings: a-SDM workshop training in PQL, b-Thematic Session on Sustainable Access to Electricity in Africa – ENGLISH, c-Regional session for ECCAC members, d-AUDA-NEPAD and GWP weekly meeting, e-SDM expert technical committee group meeting, f-SDM Transaction working group meeting, g-EI team meeting on the implementation strategy of PIDA PAP 2 projects, h-SDM -ALG special meeting to prepare the SDM expert technical committee group meeting, i-ES FNS Webinar meeting preparation
II-Draft: a-UMA Training on PIDA PAP 2 process English Session, b-Thematic session on Financing of PIDA PAP 2 projects English speaking, c-Regional PIDA PAP 2 webinar for COMESA bilingual session, d-PIDA PAP 2 task force coordination, e-AUDA-NEPAD and GWP weekly meeting, f-SDM expert technical committee group meeting
III-Search online water and infrastructure in Africa news
|
I-attended online meetings: a-UMA Training on PIDA PAP 2 process English Session, b-EI regular meeting, c-SDM -ALG-GIZ meeting to prepare the transaction working group, d-ES FNS Webinar meeting preparation, e-Thematic session on Financing of PIDA PAP 2 projects English speaking, f-PIDA PAP 2 task force AUDA-NEPAD on the implementation strategy of PIDA PAP 2 projects, g- SDM Transaction working group meeting, h-Regional PIDA PAP 2 webinar for COMESA bilingual session, i-PIDA PAP 2 task force coordination, j-AUDA-NEPAD and GWP weekly meeting, k-SDM expert technical committee group meeting, l-call with DBSA on Lesotho Highlands water projects, m-SDM -ALG special meeting to prepare the SDM expert technical committee group meeting.
II-Drafted: a-minutes of SDM Technical committee meeting, b-AUDA-NEPAD and GWP weekly meeting, c-some ideas on EI contribution to the ES FNS webinar, d-project notifications for Burkina-Faso -Benin Optical Fibre Link for SDM process, e-project notifications for Noordoewever-Vioolsdrift Dam for SDM process, f-Update the Dashboard of the Burkina-Faso -Benin Optical Fibre Link project, g-agenda items of AUDA-GWP weekly meeting
III-Searched online water and infrastructure in Africa news
IV-Reviewed: a- PIDA PAP 2 implementation strategy ToR, b-minutes of the SDM Transaction working group meeting, c-minutes of SDM -ALG special meeting to prepare the SDM expert technical committee group meeting, d-agenda draft of the 2020-06-10 SDM Transaction working group meeting, e-concept note of the ES FNS Webinar
V-Circulated: a-EI regular meeting cancellation to the EI team members, b- ES FNS Webinar preparation to EI team members,
|
I-attend online meetings: a-SDM workshop training in PQL, b-Thematic Session on Sustainable Access to Electricity in Africa – ENGLISH, c-Regional session for ECCAC members, d-AUDA-NEPAD and GWP weekly meeting, e-SDM expert technical committee group meeting, f-SDM Transaction working group meeting, g-EI team meeting on the implementation strategy of PIDA PAP 2 projects, h-SDM -ALG special meeting to prepare the SDM expert technical committee group meeting, i-ES FNS Webinar meeting preparation
II-Draft: a-UMA Training on PIDA PAP 2 process English Session, b-Thematic session on Financing of PIDA PAP 2 projects English speaking, c-Regional PIDA PAP 2 webinar for COMESA bilingual session, d-PIDA PAP 2 task force coordination, e-AUDA-NEPAD and GWP weekly meeting, f-SDM expert technical committee group meeting
III-Search online water and infrastructure in Africa news
|
|
|
|
Raymonde Nguena |
June 8, 2020 |
Raymonde Nguena (June 8, 2020 – June 12, 2020) |
Other |
Update from Last Week:
my activities last week were organized around the following points:
– Work on establishing an annual work plan as AUYVC-ICT in AUDA-NEPAD with my supervisor, Dr. Towela.
– Work on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Take part in the PIDA Quality Label Virtual Workshop “for SDM Officials which took place one june 11, 2020
– take part in the Meeting to discuss the draft PIDA Implementation Strategy ToRs on Friday 12, 2020. Writing the minutes and circulate it among the EI team members.
Activity plan for Next Week:
– Working on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Organizing the EI regular meeting
– Attend to the Tech in Africa webinar series Part one: ICT infrastructure and digital inclusivity on June 18, 2020
|
my activities last week were organized around the following points:
– Work on establishing an annual work plan as AUYVC-ICT in AUDA-NEPAD with my supervisor, Dr. Towela.
– Work on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Take part in the PIDA Quality Label Virtual Workshop “for SDM Officials which took place one june 11, 2020
– take part in the Meeting to discuss the draft PIDA Implementation Strategy ToRs on Friday 12, 2020. Writing the minutes and circulate it among the EI team members.
|
– Working on the elaboration of a weekly report on the compilation of summaries of articles on ICTs in Africa.
– Organizing the EI regular meeting
– Attend to the Tech in Africa webinar series Part one: ICT infrastructure and digital inclusivity on June 18, 2020
|
|
|
|
Flore Kamdomg |
June 8, 2020 |
Flore Kamdomg (June 8, 2020 – June 12, 2020) |
Other |
Update from Last Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Assisted the head of PPP Unit with the preparation of the SDM Training for 10,11,17 and 24th June
– Follow up with IT and VPIC manager for the technical preparation of the SDM Webinar
– Follow up with EI Colleagues to confirm participation to the SDM Training
– Participate in PIDA Quality Label Virtual Workshop for SDM Officials which took place one 11th June
– Participate in the MS Team Meeting to discuss the draft PIDA Implementation Strategy ToRs held on Friday 12, 2020.
– Follow up with HR on planned farewell for AUDA retirees.
– Conducted research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Received summaries report of Water and ICT articles from colleagues working on these sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Raising of Purchase requisition on SAP and submission Director’s Amine Office for release
– Follow up with procurement to facilitate the interpretation of Inga conference
– Assisted the new Intern to review and inputs the minutes of EI Team meeting held on 4th June.
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on request made to Procurement for interpretation service for the Inga meeting
– Follow up with HR for Mr. Deen farewell preparation
Challenges requiring attention:
Recommendations:
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Assisted the head of PPP Unit with the preparation of the SDM Training for 10,11,17 and 24th June
– Follow up with IT and VPIC manager for the technical preparation of the SDM Webinar
– Follow up with EI Colleagues to confirm participation to the SDM Training
– Participate in PIDA Quality Label Virtual Workshop for SDM Officials which took place one 11th June
– Participate in the MS Team Meeting to discuss the draft PIDA Implementation Strategy ToRs held on Friday 12, 2020.
– Follow up with HR on planned farewell for AUDA retirees.
– Conducted research and elaborate weekly report summary of current news on Africa Transport, Energy and Infrastructure sectors
– Received summaries report of Water and ICT articles from colleagues working on these sectors
– Compilation of weekly articles collected from Water ,ICT, Energy, Transport and Infrastructure sectors in Africa and submit to the Head of Division
– Raising of Purchase requisition on SAP and submission Director’s Amine Office for release
– Follow up with procurement to facilitate the interpretation of Inga conference
– Assisted the new Intern to review and inputs the minutes of EI Team meeting held on 4th June.
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on request made to Procurement for interpretation service for the Inga meeting
– Follow up with HR for Mr. Deen farewell preparation
|
None
|
None
|
|
Sami Hafnaoui |
June 8, 2020 |
Sami Hafnaoui (June 8, 2020 – June 12, 2020) |
Other |
Update from Last Week:
Participated in the Session on Financing PIDA PAP2 projects.
Participated in the PRIDA working session for Market Entry Conditions.
Participated in the SDM training.
Worked on the PIDA PAP2 Implementation Strategy.
Worked on the internal MIS project with UMA (had face to face meeting with the SG and his office team members.
Activity plan for Next Week:
|
Participated in the Session on Financing PIDA PAP2 projects.
Participated in the PRIDA working session for Market Entry Conditions.
Participated in the SDM training.
Worked on the PIDA PAP2 Implementation Strategy.
Worked on the internal MIS project with UMA (had face to face meeting with the SG and his office team members.
|
BAU
|
|
|
|
Jose Luis Bobes |
June 8, 2020 |
Jose Luis Bobes (June 8, 2020 – June 12, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
Implementation Strategy draft TOR contribution and review meetings
PPP Training Needs Assessment form finished, database and letter to send ready, waiting for approval
Webinar training PIDA Quality Label
TOR to enhance the usability of VPIP approved, looking for the third candidate before submitting
Coordination of Energy NKE work: Inception Report and Harmonisation paper. Coordination Energy NKE Continental Master Plan (LOT8)
Coordination of ICT NKE work: Inception Report and Harmonisation paper
Coordination AUDA-GIZ-EU-ISM work plan meeting
OECD Paper and conference: Accelerating and scaling up Quality Infrastructure investments in the context of PIDA
Activity plan for Next Week:
Final version Implementation Strategy, which includes, Operational Manual TOR
Harmonization reports for Energy and ICT NKE
Review new format Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ request to man pipeline management
Operations Manual Concept Note
Challenges requiring attention:
OEDC paper is misusing the PIDA brand.
Recommendations:
I think we should formally request the paper does not mention PIDA in the title unless it does use the PIDA-PAP2 methodology
File attachments:
|
Implementation Strategy draft TOR contribution and review meetings
PPP Training Needs Assessment form finished, database and letter to send ready, waiting for approval
Webinar training PIDA Quality Label
TOR to enhance the usability of VPIP approved, looking for the third candidate before submitting
Coordination of Energy NKE work: Inception Report and Harmonisation paper. Coordination Energy NKE Continental Master Plan (LOT8)
Coordination of ICT NKE work: Inception Report and Harmonisation paper
Coordination AUDA-GIZ-EU-ISM work plan meeting
OECD Paper and conference: Accelerating and scaling up Quality Infrastructure investments in the context of PIDA
|
Final version Implementation Strategy, which includes, Operational Manual TOR
Harmonization reports for Energy and ICT NKE
Review new format Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ request to man pipeline management
Operations Manual Concept Note
|
OEDC paper is misusing the PIDA brand.
|
I think we should formally request the paper does not mention PIDA in the title unless it does use the PIDA-PAP2 methodology
|
Draft-Report-Accelerating-and-Scaling-Up-Quality-Infrastructure-in-Africa-JLB-comments.pdf |
Abdou Rahman Mboob |
June 1, 2020 |
Abdou Rahman Mboob (June 1, 2020 – June 5, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Attended the following meetings and webinars
1. PIDA PAP2 thematic webinar session -Digitization across PIDA Sectors
2. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (CAPP, ECCAS)
3. PIDA Taskforce coordination meeting
4. Reviewing MTR for PIDA Final Report
Activity plan for Next Week:
To participate and attend in the following
1. PIDA PAP2 Coordination Meeting with IRENA
2. PIDA PAP2 training session for North Africa Region (French & English)
3. Regional PIDA PAP2 Session for SADC & COMESA member States Focal Points – PIDA Project Selection listing
4. Webinar – Presentation and Validation of IRIMP Report for IGAD – ICT, Transport, Energy & Water (Two Sessions)
|
Attended the following meetings and webinars
1. PIDA PAP2 thematic webinar session -Digitization across PIDA Sectors
2. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (CAPP, ECCAS)
3. PIDA Taskforce coordination meeting
4. Reviewing MTR for PIDA Final Report
|
To participate and attend in the following
1. PIDA PAP2 Coordination Meeting with IRENA
2. PIDA PAP2 training session for North Africa Region (French & English)
3. Regional PIDA PAP2 Session for SADC & COMESA member States Focal Points – PIDA Project Selection listing
4. Webinar – Presentation and Validation of IRIMP Report for IGAD – ICT, Transport, Energy & Water (Two Sessions)
|
|
|
|
Younes Touitha |
June 1, 2020 |
Younes Touitha (June 1, 2020 – June 5, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2: PIDA Task Force coordination meeting (27/05/2020);
– PIDA PAP 2: Thematic session on Digitalisation across PIDA sectors, English session (27/05/2020);
– PIDA PAP 2: Thematic session on Digitalisation across PIDA sectors, French session (28/05/2020);
– Comments and inputs sent on the report “Concept Note for stackholders meeting oon the PIDA PAP 2 process“.
Activity plan for Next Week:
– PIDA PAP 2: Webinar Regional session IGAD;
– PIDA PAP : Webinar Regional session North, French session:
– PIDA PAP : Webinar Regional session North, English session:
– Webinar with CPCS on “Definition of norms and standards for the African Railway Network“.
Challenges requiring attention:
We note that the focal points of Mauritania (1 person) and Libya (2 people) do not attend the meetings organized for the North region.
The PIDA coordinator has been advised of this, and has sent a request to AUC.
|
– PIDA PAP 2: PIDA Task Force coordination meeting (27/05/2020);
– PIDA PAP 2: Thematic session on Digitalisation across PIDA sectors, English session (27/05/2020);
– PIDA PAP 2: Thematic session on Digitalisation across PIDA sectors, French session (28/05/2020);
– Comments and inputs sent on the report “Concept Note for stackholders meeting oon the PIDA PAP 2 process“.
|
– PIDA PAP 2: Webinar Regional session IGAD;
– PIDA PAP : Webinar Regional session North, French session:
– PIDA PAP : Webinar Regional session North, English session:
– Webinar with CPCS on “Definition of norms and standards for the African Railway Network“.
|
We note that the focal points of Mauritania (1 person) and Libya (2 people) do not attend the meetings organized for the North region.
The PIDA coordinator has been advised of this, and has sent a request to AUC.
|
|
|
Lovasoa Christine Razanamahan |
June 1, 2020 |
Lovasoa Christine Razanamahan (June 1, 2020 – June 5, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings/webinars: a-EI regular meeting, b-SDM Operational meeting, c- Digitalisaiton webinar French session, d- Noumbiel Multipurpose dam call with project sponsor, e-UMA training French session webinar, f-IGAD Webinar Transport and ICT session, g- IGAD Webinar Energy and Water session, h-One to one call with EI Principal Programme Officer to explain my areas works, i-SADC session on PIDA PAP 2 session, j-One to one call with the new AU Volunteer to give guidance, k-UMA training English session webinar
II-Drafted: a-minutes of Question and answer session dedicated to ENGLISH SPEAKING focal points, b-minutes of Regional sessions with ECOWAS members, BILINGUAL, c-power point presentation of SDM water projects, d-AUDA-NEPAD GWP meeting on 22 May 2020
III-Reviewed the African Oil market COVID 19 paper.
Activity plan for Next Week:
I-To attend online meetings: a-SDM Technical meetings, b-AUDA-NEPAD and GWP meeting weekly, c-EI regular meeting, d-Thematic Session on financing of PIDA PAP 2 projects ENGLISH SPEAKING, e-Regional session in PIDA PAP 2
II-To draft minutes of: a- Digitalisaiton webinar French session, b- Noumbiel Multipurpose dam call with project sponsor, c-PIDA Task Force Coordination meeting d-UMA training French session webinar, e-IGAD Webinar Transport and ICT session, f- IGAD Webinar Energy and Water session, g-SADC session on PIDA PAP 2 session, h-UMA training English session webinar.
III-To attend SDM Training on the quick check methodology
|
I-Attended online meetings/webinars: a-EI regular meeting, b-SDM Operational meeting, c- Digitalisaiton webinar French session, d- Noumbiel Multipurpose dam call with project sponsor, e-UMA training French session webinar, f-IGAD Webinar Transport and ICT session, g- IGAD Webinar Energy and Water session, h-One to one call with EI Principal Programme Officer to explain my areas works, i-SADC session on PIDA PAP 2 session, j-One to one call with the new AU Volunteer to give guidance, k-UMA training English session webinar
II-Drafted: a-minutes of Question and answer session dedicated to ENGLISH SPEAKING focal points, b-minutes of Regional sessions with ECOWAS members, BILINGUAL, c-power point presentation of SDM water projects, d-AUDA-NEPAD GWP meeting on 22 May 2020
III-Reviewed the African Oil market COVID 19 paper.
|
I-To attend online meetings: a-SDM Technical meetings, b-AUDA-NEPAD and GWP meeting weekly, c-EI regular meeting, d-Thematic Session on financing of PIDA PAP 2 projects ENGLISH SPEAKING, e-Regional session in PIDA PAP 2
II-To draft minutes of: a- Digitalisaiton webinar French session, b- Noumbiel Multipurpose dam call with project sponsor, c-PIDA Task Force Coordination meeting d-UMA training French session webinar, e-IGAD Webinar Transport and ICT session, f- IGAD Webinar Energy and Water session, g-SADC session on PIDA PAP 2 session, h-UMA training English session webinar.
III-To attend SDM Training on the quick check methodology
|
|
|
|
Sami Hafnaoui |
June 1, 2020 |
Sami Hafnaoui (June 1, 2020 – June 5, 2020) |
Other |
Update from Last Week:
Participated in PIDA PAP2 North Regional Session.
Worked on MIS project for UMA.
Worked on PRIDA project (mainly the Market Entry conditions work group).
Participated in GEIDCO, AfDB, and AUDA/NEPAD meeting.
Activity plan for Next Week:
|
Participated in PIDA PAP2 North Regional Session.
Worked on MIS project for UMA.
Worked on PRIDA project (mainly the Market Entry conditions work group).
Participated in GEIDCO, AfDB, and AUDA/NEPAD meeting.
|
BAU.
|
|
|
|
Abdou Rahman Mboob |
May 25, 2020 |
Abdou Rahman Mboob (May 25, 2020 – May 29, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Attended the following meetings and webinars listed below
1. PIDA PAP2 – Q&A English speaking session
2. AUC-AUDA-GIZ PIDA Team Planning Workshop
3.Regional Webinar for ECOWAS – PIDA PAP Projects focal points
4. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (EAPP and ECOWAS)
5. PIDA Water Thematic Session Cont’d
6. SDM Expert Service Pool – Technical Working Group
6. Review and submit comments for Working Paper 4 – Capacity Assessment – Market demand study (PIDA PAP2)
Activity plan for Next Week:
1. PIDA PAP2 thematic webinar session -Digitization across PIDA Sectors
2. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (CAPP, ECCAS)
3. PIDA Taskforce coordination meeting
|
Attended the following meetings and webinars listed below
1. PIDA PAP2 – Q&A English speaking session
2. AUC-AUDA-GIZ PIDA Team Planning Workshop
3.Regional Webinar for ECOWAS – PIDA PAP Projects focal points
4. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (EAPP and ECOWAS)
5. PIDA Water Thematic Session Cont’d
6. SDM Expert Service Pool – Technical Working Group
6. Review and submit comments for Working Paper 4 – Capacity Assessment – Market demand study (PIDA PAP2)
|
1. PIDA PAP2 thematic webinar session -Digitization across PIDA Sectors
2. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (CAPP, ECCAS)
3. PIDA Taskforce coordination meeting
|
|
|
|
Younes Touitha |
May 25, 2020 |
Younes Touitha (May 25, 2020 – May 29, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Webinar: Integrated corridor Approach for infrastructure : Knowldge sharing;
– AUC / AUDA / GIZ: PIDA Teamplanning worshop;
– Q&A session dedicated to English speaking focal points;
– Regional session with ECOWAS members, Bilingual;
– Webinar: Thematic session on the water sector part II, Bilingual;
– Inputs on Input and remarks on the Mid – Term Review final report;
– inputs and remarks on Demand Study for Africa: Working Paper 4: Capacity Assessment and
Capacity Building;
-UMA / AfDB: AfDB Procurement Training;
– Inputs and remarks on “Concept Note for stackholders meeting on the PIDA PAP2 process“.
Activity plan for Next Week:
– UMA activitès: Impacts of the Covid-19 pandemic on ports and maritime transport in the Mediterranean region (UPM / MEDports): 05/27/2020;
– PIDA PAP2: Webinar UMA french speaking;
– PIDA PAP2: Webinar Regional session;
– PIDA PAP2: Webinar UMA English speaking;
– PIDA PAP2: Thematic session on Digitalisation across PIDA sectors, English session;
– PIDA PAP2; Thematic session on Digitalisation across PIDA sectors, French speaking.
Challenges requiring attention:
The new date for submission of projects by national focal points is June 30, 2020.
To date the number of projects proposed is not sufficient.
|
Webinar: Integrated corridor Approach for infrastructure : Knowldge sharing;
– AUC / AUDA / GIZ: PIDA Teamplanning worshop;
– Q&A session dedicated to English speaking focal points;
– Regional session with ECOWAS members, Bilingual;
– Webinar: Thematic session on the water sector part II, Bilingual;
– Inputs on Input and remarks on the Mid – Term Review final report;
– inputs and remarks on Demand Study for Africa: Working Paper 4: Capacity Assessment and
Capacity Building;
-UMA / AfDB: AfDB Procurement Training;
– Inputs and remarks on “Concept Note for stackholders meeting on the PIDA PAP2 process“.
|
– UMA activitès: Impacts of the Covid-19 pandemic on ports and maritime transport in the Mediterranean region (UPM / MEDports): 05/27/2020;
– PIDA PAP2: Webinar UMA french speaking;
– PIDA PAP2: Webinar Regional session;
– PIDA PAP2: Webinar UMA English speaking;
– PIDA PAP2: Thematic session on Digitalisation across PIDA sectors, English session;
– PIDA PAP2; Thematic session on Digitalisation across PIDA sectors, French speaking.
|
The new date for submission of projects by national focal points is June 30, 2020.
To date the number of projects proposed is not sufficient.
|
|
|
Lovasoa Christine Razanamahan |
May 25, 2020 |
Lovasoa Christine Razanamahan (May 25, 2020 – May 29, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meeting: a-SDM-ALG-GIZ meeting on the SDM process tools testing, b-ECOWAS session on PIDA PAP 2 process, c-Thematic on Water session part 2 in PIDA PAP 2 process, d-SDM technical expert pool meeting, e-GWP meeting, f-Thematic on Digitalisation English session in PIDA PAP 2 process.
II-Drafted minutes of the following meetings: a-Question and answer English session meeting in PIDA PAP 2 process and b-SDM technical expert pool meeting
III-Reviewed the working paper 4 on PIDA PAP 2 process.
Activity plan for Next Week:
I-To attend online meeting: a-EI regular meeting, b-SDM-ALG-GIZ meeting on the SDM process tools testing, c-Thematic on Digitalisation French session, d-PIDA Task force coordination meeting, e-GWP meeting, f-Regional session with UMA members FRENCH SPEAKING session in PIDA PAP 2 process.
II-To draft minutes of the following meetings: a-ECOWAS session on PIDA PAP 2 process, b-Thematic on Water session part 2 in PIDA PAP 2 process,c-GWP meeting, d-Thematic on Digitalisation English session in PIDA PAP 2 process.
III-To review the impact of COVID 19 on African Oil sector draft paper
|
I-Attended online meeting: a-SDM-ALG-GIZ meeting on the SDM process tools testing, b-ECOWAS session on PIDA PAP 2 process, c-Thematic on Water session part 2 in PIDA PAP 2 process, d-SDM technical expert pool meeting, e-GWP meeting, f-Thematic on Digitalisation English session in PIDA PAP 2 process.
II-Drafted minutes of the following meetings: a-Question and answer English session meeting in PIDA PAP 2 process and b-SDM technical expert pool meeting
III-Reviewed the working paper 4 on PIDA PAP 2 process.
|
I-To attend online meeting: a-EI regular meeting, b-SDM-ALG-GIZ meeting on the SDM process tools testing, c-Thematic on Digitalisation French session, d-PIDA Task force coordination meeting, e-GWP meeting, f-Regional session with UMA members FRENCH SPEAKING session in PIDA PAP 2 process.
II-To draft minutes of the following meetings: a-ECOWAS session on PIDA PAP 2 process, b-Thematic on Water session part 2 in PIDA PAP 2 process,c-GWP meeting, d-Thematic on Digitalisation English session in PIDA PAP 2 process.
III-To review the impact of COVID 19 on African Oil sector draft paper
|
|
|
|
Jose Luis Bobes |
May 25, 2020 |
Jose Luis Bobes (May 25, 2020 – May 29, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
PPP Training Needs Assessment form finished
Webinars Integrated corridor approach
TOR to enhance the usability of VPIP approved, looking for candidates
Coordination of Energy NKE work: Inception Report
Coordination of ICT NKE work: Inception Report
MidTerm review feedback
Capacity building paper review
Activity plan for Next Week:
Coordination AUDA-GIZ-EU-ISM work plan meeting
Coordination Energy NKE Continental Master Plan (LOT8)
Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ and EU action plan
Operations Manual Concept Note
Coordination of ICT NKE work
Concept Note: Managing High-Performance Teams Remotely
File attachments:
|
PPP Training Needs Assessment form finished
Webinars Integrated corridor approach
TOR to enhance the usability of VPIP approved, looking for candidates
Coordination of Energy NKE work: Inception Report
Coordination of ICT NKE work: Inception Report
MidTerm review feedback
Capacity building paper review
|
Coordination AUDA-GIZ-EU-ISM work plan meeting
Coordination Energy NKE Continental Master Plan (LOT8)
Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ and EU action plan
Operations Manual Concept Note
Coordination of ICT NKE work
Concept Note: Managing High-Performance Teams Remotely
|
|
|
2020-05-22-PPP-Training-Needs-Assessment.docx |
Ephrem Getahun |
May 25, 2020 |
Ephrem Getahun (May 25, 2020 – May 29, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– provided support on PIDA PAP 2 website user management, project submission and other related issues
– participated in the weekly EI/GIZ and various other one-on-one online meetings
– worked on the job creation toolkit enhancement exercise
– attended PIDA PAP 2 weekly webinars and provided inputs
Activity plan for Next Week:
– continue working on the job creation toolkit enhancement
– work on the development of PICI web portal
– attend to any other specific requests coming from colleagues
|
– provided support on PIDA PAP 2 website user management, project submission and other related issues
– participated in the weekly EI/GIZ and various other one-on-one online meetings
– worked on the job creation toolkit enhancement exercise
– attended PIDA PAP 2 weekly webinars and provided inputs
|
– continue working on the job creation toolkit enhancement
– work on the development of PICI web portal
– attend to any other specific requests coming from colleagues
|
|
|
|
Sami Hafnaoui |
May 25, 2020 |
Sami Hafnaoui (May 25, 2020 – May 29, 2020) |
Other |
Update from Last Week:
Worked on Harmonization indicators for the PRIDA project.
Internal meeting on PIDA PAP2 process.
Activity plan for Next Week:
|
Worked on Harmonization indicators for the PRIDA project.
Internal meeting on PIDA PAP2 process.
|
BAU
|
|
|
|
Flore Kamdomg |
May 25, 2020 |
Flore Kamdomg (May 25, 2020 – May 29, 2020) |
Other |
Update from Last Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Had a teleconference call with Head of Infraturcuture Unit to discussed the draft Inga budget
– Started logistic arrangement of the Inga Webinar Meeting
– Drated template and circulate to colleagues to indicate their days to return to AUDA-NEPAD Offices as per the re-opening of offices memo
– Follow up with Patrick Mbaijana on procedures put in place to facilitate return of staffs to the office
– Assisted the head of PPP Unit with the planning of the SDM Training for 10,11,17 and 24th June
– Attended to EI Regular team meeting ( where Mr Deen announced his departure from AUDA-NEPAD
– Emailed Head of HR to enquiry about any planning farewell for AUDA retirees.
– Drafting of the minutes of EI team meeting held on 28st May and save to MS Team drive and circulate copy to colleagues
– Liaise with IT and procurement to request support for the planned Inga Webinar Meeting
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on request made to Procurement for interpretation service for the Inga meeting
– Follow up with HR for the farewell preparation
– Continue to provide Admin assistance to colleagues working on different projects.
– Attend to any other tasks as assigned
Challenges requiring attention:
Colleagues delayed in responding to emails
Recommendations:
Request colleagues more collaboration when it comes to respond to emails
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Had a teleconference call with Head of Infraturcuture Unit to discussed the draft Inga budget
– Started logistic arrangement of the Inga Webinar Meeting
– Drated template and circulate to colleagues to indicate their days to return to AUDA-NEPAD Offices as per the re-opening of offices memo
– Follow up with Patrick Mbaijana on procedures put in place to facilitate return of staffs to the office
– Assisted the head of PPP Unit with the planning of the SDM Training for 10,11,17 and 24th June
– Attended to EI Regular team meeting ( where Mr Deen announced his departure from AUDA-NEPAD
– Emailed Head of HR to enquiry about any planning farewell for AUDA retirees.
– Drafting of the minutes of EI team meeting held on 28st May and save to MS Team drive and circulate copy to colleagues
– Liaise with IT and procurement to request support for the planned Inga Webinar Meeting
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on request made to Procurement for interpretation service for the Inga meeting
– Follow up with HR for the farewell preparation
– Continue to provide Admin assistance to colleagues working on different projects.
– Attend to any other tasks as assigned
|
Colleagues delayed in responding to emails
|
Request colleagues more collaboration when it comes to respond to emails
|
|
Abdou Rahman Mboob |
May 18, 2020 |
Abdou Rahman Mboob (May 18, 2020 – May 22, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Meeting with Egypt ICTN Task Team – Continental MasterPlan
2. PIDA PAP2 Task Force Co-ordination Meeting
3. Attend the PIDA PAP2 Thematic Webinar – Trans-boundary Water
Activity plan for Next Week:
1. PIDA PAP2 – Q&A English speaking session
2. AUC-AUDA-GIZ PIDA Team Planning Workshop
3.Regional Webinar for ECOWAS – PIDA PAP Projects focal points
4. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (SAPP, EAPP and ECOWAS)
5. PIDA Water Thematic Session Cont’d
6. SDM Expert Service Pool – Technical Working Group
|
1. Meeting with Egypt ICTN Task Team – Continental MasterPlan
2. PIDA PAP2 Task Force Co-ordination Meeting
3. Attend the PIDA PAP2 Thematic Webinar – Trans-boundary Water
|
1. PIDA PAP2 – Q&A English speaking session
2. AUC-AUDA-GIZ PIDA Team Planning Workshop
3.Regional Webinar for ECOWAS – PIDA PAP Projects focal points
4. Development of ICTN – TOR Lot 8 Study (Meeting with Power Pools, Recs, and Regional Regulators (SAPP, EAPP and ECOWAS)
5. PIDA Water Thematic Session Cont’d
6. SDM Expert Service Pool – Technical Working Group
|
|
|
|
Lovasoa Christine Razanamahan |
May 18, 2020 |
Lovasoa Christine Razanamahan (May 18, 2020 – May 22, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-attended online meetings and webinars: a-Webinar on transboundary water session, b-EI Team regular meeting, c-AUDA-NEPAD and UNCCD meeting, d-SDM-ALG-GIZ-project evaluation work group & normal work plan meeting, e-Coordinating PIDA PAP 2 task force meeting, f-GIZ-AUDA-NEPAD-AUC meeting, g-SDM-ALG-GIZ-regular meeting, h- JICA webinar, i- Questions and answers English session PIDA PAP 2 webinar, j-GWP and AUDA-NEPAD meeting
II-Drafted minutes of the: a-Webinar on transboundary water session, b-EI Team regular meeting, c-Coordinating PIDA PAP 2 task force meeting, d- JICA webinar, e- Questions and answers French session PIDA PAP 2 webinar
III-Provided a technical assistance in Cybersecurity: improved the Africa map on UNCC ratification
IV-Reviewed documents: a-Dashboard to monitor project evaluation, b-PIDA PAP 2 implementation strategy, c- AUDA-NEPAD and GWP Work plan,
Activity plan for Next Week:
-To attend online meetings: a-Webinar on ECOWAS PIDA PAP 2 project submission session, b-EI Team regular meeting, c-SDM-ALG-GIZ-project evaluation work group & normal work plan meeting, e-SDM-ALG-GIZ-regular meeting, h- Transboundary water session PIDA PAP 2 webinar (part II), j-GWP and AUDA-NEPAD meeting
-To draft minutes: a-SDM technical expert pool meeting, b- Questions and answers English session PIDA PAP 2 webinar, c-Webinar on ECOWAS PIDA PAP 2 project submission session, d-EI Team regular meeting, e- Transboundary water session PIDA PAP 2 webinar (part II)
-To review document on market and demand study working paper 4 for PIDA PAP submission process.
|
I-attended online meetings and webinars: a-Webinar on transboundary water session, b-EI Team regular meeting, c-AUDA-NEPAD and UNCCD meeting, d-SDM-ALG-GIZ-project evaluation work group & normal work plan meeting, e-Coordinating PIDA PAP 2 task force meeting, f-GIZ-AUDA-NEPAD-AUC meeting, g-SDM-ALG-GIZ-regular meeting, h- JICA webinar, i- Questions and answers English session PIDA PAP 2 webinar, j-GWP and AUDA-NEPAD meeting
II-Drafted minutes of the: a-Webinar on transboundary water session, b-EI Team regular meeting, c-Coordinating PIDA PAP 2 task force meeting, d- JICA webinar, e- Questions and answers French session PIDA PAP 2 webinar
III-Provided a technical assistance in Cybersecurity: improved the Africa map on UNCC ratification
IV-Reviewed documents: a-Dashboard to monitor project evaluation, b-PIDA PAP 2 implementation strategy, c- AUDA-NEPAD and GWP Work plan,
|
-To attend online meetings: a-Webinar on ECOWAS PIDA PAP 2 project submission session, b-EI Team regular meeting, c-SDM-ALG-GIZ-project evaluation work group & normal work plan meeting, e-SDM-ALG-GIZ-regular meeting, h- Transboundary water session PIDA PAP 2 webinar (part II), j-GWP and AUDA-NEPAD meeting
-To draft minutes: a-SDM technical expert pool meeting, b- Questions and answers English session PIDA PAP 2 webinar, c-Webinar on ECOWAS PIDA PAP 2 project submission session, d-EI Team regular meeting, e- Transboundary water session PIDA PAP 2 webinar (part II)
-To review document on market and demand study working paper 4 for PIDA PAP submission process.
|
|
|
|
Adama Deen |
May 18, 2020 |
Adama Deen (May 18, 2020 – May 22, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. EAC market sounding survey – progress report reviewed, and commitments submitted to CPCS
2. Held meeting with Chris and Jan (on ECOWAS packaging consultancy). The plan is to organize a virtual meeting, to assess the progress thus far made. Jan submitted a preliminary Matrix summaroized report on the on-going pre-market survey with prospective investors.
3. Submitted comments on PIDA PAP-2 Implementation “Concept Note” circulated by Tich.
Activity plan for Next Week:
1. Draft HSR Advocacy Consultancy (Submission of 3rd Deliverable); a waiting consultant to submit final draft, for final check.
2. End of Contract report to HR
Challenges requiring attention:
Recommendations:
|
1. EAC market sounding survey – progress report reviewed, and commitments submitted to CPCS
2. Held meeting with Chris and Jan (on ECOWAS packaging consultancy). The plan is to organize a virtual meeting, to assess the progress thus far made. Jan submitted a preliminary Matrix summaroized report on the on-going pre-market survey with prospective investors.
3. Submitted comments on PIDA PAP-2 Implementation “Concept Note” circulated by Tich.
|
1. Draft HSR Advocacy Consultancy (Submission of 3rd Deliverable); a waiting consultant to submit final draft, for final check.
2. End of Contract report to HR
|
None
|
None
|
|
Jose Luis Bobes |
May 18, 2020 |
Jose Luis Bobes (May 18, 2020 – May 22, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
PPP Training Needs Assessment
ISM April monthly report
Final version TOR to enhance the usability of VPIP submitted
COVID-19 Paper on IT infrastructure opportunities submitted
Coordination of Energy NKE work: Inception Report
Coordination of ICT NKE work: Inception Report
Activity plan for Next Week:
Feedback to PIDA Midterm report and Market Demand Study
Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ and EU action plan
Submit final version the PPP Training Needs Assessment questionnaire
Operations Manual Concept Note
Coordination of Energy NKE work
Coordination of ICT NKE work
Challenges requiring attention:
Recommendations:
|
PPP Training Needs Assessment
ISM April monthly report
Final version TOR to enhance the usability of VPIP submitted
COVID-19 Paper on IT infrastructure opportunities submitted
Coordination of Energy NKE work: Inception Report
Coordination of ICT NKE work: Inception Report
|
Feedback to PIDA Midterm report and Market Demand Study
Inception Reports Energy and ICT NKE
Coordination with other stakeholders: GIZ and EU action plan
Submit final version the PPP Training Needs Assessment questionnaire
Operations Manual Concept Note
Coordination of Energy NKE work
Coordination of ICT NKE work
|
None
|
None
|
|
Younes Touitha |
May 18, 2020 |
Younes Touitha (May 18, 2020 – May 22, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP2: Q&A Webinar for French Speaking ;
– Webinar : Thematic Water session;
– Coordination meeting of the Task Force.
Activity plan for Next Week:
– Webinar: Integrated corridor Approach for infrastructure : Knowldge sharing;
– AUC / AUDA / GIZ: PIDA Teamplanning worshop;
– Q&A session dedicated to English speaking focal points;
– Regional session with ECOWAS members, Bilingual;
– Webinar: Thematic session on the water sector part II, Bilingual;
– SDM Expert Service Pool Technical working Group;
– Inputs on Input and remarks on the Mid – Term Review final report;
– inputs and remarks on Demand Study for Africa: Working Paper 4: Capacity Assessment and
Capacity Building.
|
– PIDA PAP2: Q&A Webinar for French Speaking ;
– Webinar : Thematic Water session;
– Coordination meeting of the Task Force.
|
– Webinar: Integrated corridor Approach for infrastructure : Knowldge sharing;
– AUC / AUDA / GIZ: PIDA Teamplanning worshop;
– Q&A session dedicated to English speaking focal points;
– Regional session with ECOWAS members, Bilingual;
– Webinar: Thematic session on the water sector part II, Bilingual;
– SDM Expert Service Pool Technical working Group;
– Inputs on Input and remarks on the Mid – Term Review final report;
– inputs and remarks on Demand Study for Africa: Working Paper 4: Capacity Assessment and
Capacity Building.
|
|
|
|
Ephrem Getahun |
May 18, 2020 |
Ephrem Getahun (May 18, 2020 – May 22, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– attended GIZ Water and Sanitation Sector Network (Monday) and Transboundary Water Management Work Group (Tuesday) Community of Practice (CoP) sessions
– participated in the assignment for preparing criteria and selection of PIDA PAP I projects for COVID 19 short term interventions by AUDA-NEPAD
– attended PIDA PAP 2 thematic Session on Transboundary Water sub-sector
– provided support on PIDA PAP 2 website regarding access, project submission and other related issues
– participated in the weekly EI/GIZ and various other one-on-one online meetings
– reviewed the inception report and provided guidance to the EU-ISM communications expert on the work of presenting PIDA PAP 2 projects during the submit for approval of selected projects
Activity plan for Next Week:
– work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
– attended GIZ Water and Sanitation Sector Network (Monday) and Transboundary Water Management Work Group (Tuesday) Community of Practice (CoP) sessions
– participated in the assignment for preparing criteria and selection of PIDA PAP I projects for COVID 19 short term interventions by AUDA-NEPAD
– attended PIDA PAP 2 thematic Session on Transboundary Water sub-sector
– provided support on PIDA PAP 2 website regarding access, project submission and other related issues
– participated in the weekly EI/GIZ and various other one-on-one online meetings
– reviewed the inception report and provided guidance to the EU-ISM communications expert on the work of presenting PIDA PAP 2 projects during the submit for approval of selected projects
|
– work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
|
|
|
Flore Kamdomg |
May 18, 2020 |
Flore Kamdomg (May 18, 2020 – May 22, 2020) |
Other |
Update from Last Week:
– Mainly busy with Admin tasks
– Attend to the EI regular team meeting
– Updated the list of EI Team members by adding the contact details of new recruited staff and upload to MS Team and circulate to colleagues
– Assist Water team with list of participants for previous PIDA WATER MEETINGS
– Assist the Infrastructure and Connectivity team with contact details of some stakeholders
– Assisted the Trade & Market Unit to organise the AUDA-JICA Corridor development seminar on Webinar
1) Sent out invites to the 500 potential participants
2) follow up on Speakers confirmations
3) follow up IT for smooth coordination
4) attended the Webinar and provided underground support to the team for smooth coordination
– Organise and follow up orientation meeting between Elsabeth Tedros and colleagues.
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
-– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Attend to any other tasks as assigned
Challenges requiring attention:
Recommendations:
|
– Mainly busy with Admin tasks
– Attend to the EI regular team meeting
– Updated the list of EI Team members by adding the contact details of new recruited staff and upload to MS Team and circulate to colleagues
– Assist Water team with list of participants for previous PIDA WATER MEETINGS
– Assist the Infrastructure and Connectivity team with contact details of some stakeholders
– Assisted the Trade & Market Unit to organise the AUDA-JICA Corridor development seminar on Webinar
1) Sent out invites to the 500 potential participants
2) follow up on Speakers confirmations
3) follow up IT for smooth coordination
4) attended the Webinar and provided underground support to the team for smooth coordination
– Organise and follow up orientation meeting between Elsabeth Tedros and colleagues.
|
– Continue to attend to general queries made to the EI Division on a daily basis
-– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Attend to any other tasks as assigned
|
none
|
N/A
|
|
Sami Hafnaoui |
May 18, 2020 |
Sami Hafnaoui (May 18, 2020 – May 22, 2020) |
Other |
Update from Last Week:
Participation in the PRIDA Market Entry Conditions Working Group weekly meeting.
Worked on PIDA PAP2 implementation Strategy.
Worked on PRIDNA for UMA plus some other UMAs meetings.
Activity plan for Next Week:
|
Participation in the PRIDA Market Entry Conditions Working Group weekly meeting.
Worked on PIDA PAP2 implementation Strategy.
Worked on PRIDNA for UMA plus some other UMAs meetings.
|
BAU.
|
|
|
|
Flore Kamdomg |
May 18, 2020 |
Flore Kamdomg (May 18, 2020 – June 16, 2020) |
Other |
Update from Last Week:
-Attend to Admin tasks
– Circulate email to colleagues to provide topics on integrated corridor approach Webinar series.
– Attend to the EI regular team meeting
– Drafting of the minutes of EI team meeting held on 21st May
– Updated the list of EI Team members by adding the contact details of new recruited staff and
upload to MS Team and circulate to colleagues
– Contact suppliers and request for quotation for interpretation services for the Inga Conference
– Drafting of estimated budget for the planned Inga Webinar conference
– Submission of budget to the head of Division and head of infrastructure connectivity Unit
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on pending issues to be finalise
-Continue to provide Admin assistance to colleagues working on different projects.
– Attend to any other tasks as assigned
Challenges requiring attention:
Colleagues delaying to respond to emails. I need to follow up several times to get feedback on certain request
Recommendations:
Colleagues Consideration on request send
|
-Attend to Admin tasks
– Circulate email to colleagues to provide topics on integrated corridor approach Webinar series.
– Attend to the EI regular team meeting
– Drafting of the minutes of EI team meeting held on 21st May
– Updated the list of EI Team members by adding the contact details of new recruited staff and
upload to MS Team and circulate to colleagues
– Contact suppliers and request for quotation for interpretation services for the Inga Conference
– Drafting of estimated budget for the planned Inga Webinar conference
– Submission of budget to the head of Division and head of infrastructure connectivity Unit
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Follow up on pending issues to be finalise
-Continue to provide Admin assistance to colleagues working on different projects.
– Attend to any other tasks as assigned
|
Colleagues delaying to respond to emails. I need to follow up several times to get feedback on certain request
|
Colleagues Consideration on request send
|
|
Ephrem Getahun |
May 11, 2020 |
Ephrem Getahun (May 11, 2020 – May 15, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– enhance weekly reporting to add link to performance objective
– PIDA PAP 2 website content update (arabic version of documents)
– support to IGAD on adding and uploading of projects (add new parameters, lookups etc)
– Job Creation Toolkit on Thematic Webinar presentation
– Job Creation Toolkit workplan of activities meeting
– attended feedback meeting on managing RBO Portfolio – Role in Infrastructure development
– review ToR on EU support for infrastructure data collection into AID
– discussed and agreed on the next Job Creation Brochure
– participated on CEO’s request to come up with criteria and pipeline of PIDA projects to help countries mitigate COVID 19 in the short term (1-3 years)
Activity plan for Next Week:
– job creation toolkit enhancement
– the development of PICI web portal
– PIDA SDM online Application Submission forms
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
– enhance weekly reporting to add link to performance objective
– PIDA PAP 2 website content update (arabic version of documents)
– support to IGAD on adding and uploading of projects (add new parameters, lookups etc)
– Job Creation Toolkit on Thematic Webinar presentation
– Job Creation Toolkit workplan of activities meeting
– attended feedback meeting on managing RBO Portfolio – Role in Infrastructure development
– review ToR on EU support for infrastructure data collection into AID
– discussed and agreed on the next Job Creation Brochure
– participated on CEO’s request to come up with criteria and pipeline of PIDA projects to help countries mitigate COVID 19 in the short term (1-3 years)
|
– job creation toolkit enhancement
– the development of PICI web portal
– PIDA SDM online Application Submission forms
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
|
|
|
Abdou Rahman Mboob |
May 11, 2020 |
Abdou Rahman Mboob (May 11, 2020 – May 15, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Meeting attended – Cyber security COVID 19 paper
2. Attend IGF Meeting on NRIs launch of process to respond to HLPDC Recommendations 5/AB
3. Meeting with Egyptian task team on ICTN
4. SDM technical work group meeting – presentation on working arrangements
5. Attend PIDA PAP 2 Thematic Webinar – Job creation toolkit
6. ICT Sector Consultation – PIDA PAP2 Market Demand Study
Activity plan for Next Week:
1. Meeting with Egyptian Task team – ICTN
2. PIDA PAP2 Q&A session Thematic Webinar – Trans-boundary Water
3. PIDA PAP 2 Task force meeting
|
1. Meeting attended – Cyber security COVID 19 paper
2. Attend IGF Meeting on NRIs launch of process to respond to HLPDC Recommendations 5/AB
3. Meeting with Egyptian task team on ICTN
4. SDM technical work group meeting – presentation on working arrangements
5. Attend PIDA PAP 2 Thematic Webinar – Job creation toolkit
6. ICT Sector Consultation – PIDA PAP2 Market Demand Study
|
1. Meeting with Egyptian Task team – ICTN
2. PIDA PAP2 Q&A session Thematic Webinar – Trans-boundary Water
3. PIDA PAP 2 Task force meeting
|
|
|
|
Sami Hafnaoui |
May 11, 2020 |
Sami Hafnaoui (May 11, 2020 – May 12, 2020) |
Other |
Update from Last Week:
Participated in the weekly meeting for the PRIDA M&E Market Entry working Group.
Participated in the weekly meeting for the PRIDA M&E Data Protection working Group.
Worked on an e-learning initiative.
Worked on a memo that prepared to the SG of the UMA.
Activity plan for Next Week:
Participate in the weekly meeting for the PRIDA M&E Market Entry working Group.
Participate in the weekly meeting for the PRIDA M&E Data Protection working Group.
|
Participated in the weekly meeting for the PRIDA M&E Market Entry working Group.
Participated in the weekly meeting for the PRIDA M&E Data Protection working Group.
Worked on an e-learning initiative.
Worked on a memo that prepared to the SG of the UMA.
|
Participate in the weekly meeting for the PRIDA M&E Market Entry working Group.
Participate in the weekly meeting for the PRIDA M&E Data Protection working Group.
|
|
|
|
Adama Deen |
May 11, 2020 |
Adama Deen (May 11, 2020 – May 15, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Submitted Covid19 response: Infrastructure priority projects (E.I Workplan/Covid19 response)
2. EAC market sounding skype meeting with CPCS-DBSA-Nepad (PPA: Objective #2; KPI 2.1)
3. Attended Virtual meeting organized by CPCS project manager with 2 newly identified investors (PPA: Objective #2;KPI 2.1)
4. Draft Concept on HSR Pilot#2 (Dar – Kigali) stakeholders Virtual meeting finalised (PPA: Objective #1;KPI 1.1)
Activity plan for Next Week:
1. Follow-up on last week’s task
2. HSR Advocacy consultancy supervisory
3. Begin “End of Contract with AUDA-NEPAD” report writing (to be submitted to Nepad CEO/HR).
|
1. Submitted Covid19 response: Infrastructure priority projects (E.I Workplan/Covid19 response)
2. EAC market sounding skype meeting with CPCS-DBSA-Nepad (PPA: Objective #2; KPI 2.1)
3. Attended Virtual meeting organized by CPCS project manager with 2 newly identified investors (PPA: Objective #2;KPI 2.1)
4. Draft Concept on HSR Pilot#2 (Dar – Kigali) stakeholders Virtual meeting finalised (PPA: Objective #1;KPI 1.1)
|
1. Follow-up on last week’s task
2. HSR Advocacy consultancy supervisory
3. Begin “End of Contract with AUDA-NEPAD” report writing (to be submitted to Nepad CEO/HR).
|
|
|
|
Jose Luis Bobes |
May 11, 2020 |
Jose Luis Bobes (May 11, 2020 – May 15, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
TOR to improve the usability of VPIP submitted for internal review
COVID-19 Paper on IT infrastructure opportunities submitted for internal review
Coordination of Energy NKE work
Coordination of ICT NKE work
Participated in PIDA-2 Webinar Job Creation Tool
Activity plan for Next Week:
Submit the PPP Training Needs Assessment questionnaire for internal approval
Operations Manual Concept Note
Coordination of Energy NKE work
Coordination of ICT NKE work
|
TOR to improve the usability of VPIP submitted for internal review
COVID-19 Paper on IT infrastructure opportunities submitted for internal review
Coordination of Energy NKE work
Coordination of ICT NKE work
Participated in PIDA-2 Webinar Job Creation Tool
|
Submit the PPP Training Needs Assessment questionnaire for internal approval
Operations Manual Concept Note
Coordination of Energy NKE work
Coordination of ICT NKE work
|
|
|
|
Lovasoa Christine Razanamahan |
May 11, 2020 |
Lovasoa Christine Razanamahan (May 11, 2020 – May 15, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings: a-Webinar with AUC and RECs on Job creation toolkit; b- EI regular meeting; c-SDM Expert pool meeting; d-Interview panel on water expert recruitment with AUC meeting; e-meeting with GWP on first draft proposal and working plan; f- SDM and ALG meeting on the QCM tools test; g- webinar with AUC on general questions and answers for French speaker second session; h-SDM and EAC project owners to clarify the projects to be considered for the SDM process.
II-suggested action on infrastructure priority activities to respond COVID 19 and post-COVID 19
III-Selected priority infrastructure projects on water sector
IV-Drafted minutes: a-GWP and AUDA-NEPAD meeting on revising the work plan; b-PIDA PAP 2 task force meetings from January 2020; c-SDM-EAC meeting, d-interview panel meeting
V- Reviewed documents: a- Transboundary water webinar concept note; b- GWP proposal and working plan 1st draft;
VI-Drafted documents: a-proposal and work plan with GWP; b-proposed EI deliverables between UNCCD and AUDA-NEPAD cooperation (and compilation); c-AUDA-NEPAD Presentation for transboundary water projects (and compilation)
VII-Assisted on JICA webinar preparation: a-Contact KM for flyer and registration link.
Activity plan for Next Week:
I-Attend online meetings: a-PIDA PAP 2 task force members meeting with AUC; b- EI regular meeting; c- Webinar with AUC and RECs for English speaking countries; d-SDM Expert pool meeting; e-meeting with GWP on the suggested draft proposal and working plan; f- SDM and ALG meeting on the QCM tools test; g-JICA webinar; h- UNCCD and AUDA-NEPAD meeting
II-Draft minutes: a- SDM and ALG meeting on the QCM tools test; b- webinar with AUC on general questions and answers for French speaker second session; c-Webinar with AUC and RECs for English speaking countries;d-SDM Expert pool meeting; e-meeting with GWP on the suggested draft proposal and working plan
III-Assist on JICA webinar preparation: follow up questionnaire and participants request on the platform with KM.
|
I-Attended online meetings: a-Webinar with AUC and RECs on Job creation toolkit; b- EI regular meeting; c-SDM Expert pool meeting; d-Interview panel on water expert recruitment with AUC meeting; e-meeting with GWP on first draft proposal and working plan; f- SDM and ALG meeting on the QCM tools test; g- webinar with AUC on general questions and answers for French speaker second session; h-SDM and EAC project owners to clarify the projects to be considered for the SDM process.
II-suggested action on infrastructure priority activities to respond COVID 19 and post-COVID 19
III-Selected priority infrastructure projects on water sector
IV-Drafted minutes: a-GWP and AUDA-NEPAD meeting on revising the work plan; b-PIDA PAP 2 task force meetings from January 2020; c-SDM-EAC meeting, d-interview panel meeting
V- Reviewed documents: a- Transboundary water webinar concept note; b- GWP proposal and working plan 1st draft;
VI-Drafted documents: a-proposal and work plan with GWP; b-proposed EI deliverables between UNCCD and AUDA-NEPAD cooperation (and compilation); c-AUDA-NEPAD Presentation for transboundary water projects (and compilation)
VII-Assisted on JICA webinar preparation: a-Contact KM for flyer and registration link.
|
I-Attend online meetings: a-PIDA PAP 2 task force members meeting with AUC; b- EI regular meeting; c- Webinar with AUC and RECs for English speaking countries; d-SDM Expert pool meeting; e-meeting with GWP on the suggested draft proposal and working plan; f- SDM and ALG meeting on the QCM tools test; g-JICA webinar; h- UNCCD and AUDA-NEPAD meeting
II-Draft minutes: a- SDM and ALG meeting on the QCM tools test; b- webinar with AUC on general questions and answers for French speaker second session; c-Webinar with AUC and RECs for English speaking countries;d-SDM Expert pool meeting; e-meeting with GWP on the suggested draft proposal and working plan
III-Assist on JICA webinar preparation: follow up questionnaire and participants request on the platform with KM.
|
|
|
|
Flore Kamdomg |
May 11, 2020 |
Flore Kamdomg (May 11, 2020 – May 15, 2020) |
Other |
Update from Last Week:
– Mainly busy with Admin tasks
– Attend to the EI regular team meeting on MS Team
– Drafted the minutes of EI regular team meeting and uploaded in MS Team file
– Updated the list of EI Team members and shared with colleagues
– Working on Trade & Market assignment to organise the AUDA-JICA Corridor development seminar on Webinar scheduled for 19th May
1) Compiled the list of participants for the Webinar Meeting
2) Liaise with Knowledge Management team to create a Webinar platform for the seminar
3) Sent a request to IT to create the Webinar Link and follow up
4) Follow up with KM for the design of the flyer for AUDA-JICA seminar
– Organise orientation meeting between Elsabeth Tedros and colleagues responsible for the following sector
1) Infrastructure and Connectivity Unit and PIDA PAP 2 with Tich
2) Markets and Trade Unit with Vincent
3) Private Sector Development Unit, CBN, SDM with Ibrah
4) AUDA Infrastructure Delivery Model (SDM, CBN, QCM, PQL with Morgan and Ibrah
5) VPIC and Job Creation Toolkit with Ephrem
– Provide Admin assistance to colleagues working with the COVID 19 response
Activity plan for Next Week:
– Continue to attend to general queries made to the EI Division on a daily basis
– Coordinate and facilitate the AUDA-JICA Webinar seminar scheduled for 19th May
– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Attend to any other tasks as assigned
Challenges requiring attention:
Recommendations:
|
– Mainly busy with Admin tasks
– Attend to the EI regular team meeting on MS Team
– Drafted the minutes of EI regular team meeting and uploaded in MS Team file
– Updated the list of EI Team members and shared with colleagues
– Working on Trade & Market assignment to organise the AUDA-JICA Corridor development seminar on Webinar scheduled for 19th May
1) Compiled the list of participants for the Webinar Meeting
2) Liaise with Knowledge Management team to create a Webinar platform for the seminar
3) Sent a request to IT to create the Webinar Link and follow up
4) Follow up with KM for the design of the flyer for AUDA-JICA seminar
– Organise orientation meeting between Elsabeth Tedros and colleagues responsible for the following sector
1) Infrastructure and Connectivity Unit and PIDA PAP 2 with Tich
2) Markets and Trade Unit with Vincent
3) Private Sector Development Unit, CBN, SDM with Ibrah
4) AUDA Infrastructure Delivery Model (SDM, CBN, QCM, PQL with Morgan and Ibrah
5) VPIC and Job Creation Toolkit with Ephrem
– Provide Admin assistance to colleagues working with the COVID 19 response
|
– Continue to attend to general queries made to the EI Division on a daily basis
– Coordinate and facilitate the AUDA-JICA Webinar seminar scheduled for 19th May
– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Attend to any other tasks as assigned
|
NONE
|
NONE
|
|
Younes Touitha |
May 11, 2020 |
Younes Touitha (May 11, 2020 – May 15, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP 2: VC Q&A for English speaking focal points;
– PIDA PAP 2 : Webinar Q&A for french speaking focal points;
– PIDA PAP 2 : Webinar Thematic Session on the PIDA water sector;
– Coordination meeting of the Task Force
Activity plan for Next Week:
– Integration Corridor Approach for infrastructure development : Knowledge sharing webinar;
– PIDA Teamplanning worshop;
– PIDA PAP 2 : Q&A for English speaking focal point.
Challenges requiring attention:
The number of registrations and submission of projects by focal points remains low.
Recommendations:
Regularly follow up with focal points, and think of an alternative strategy.
|
– PIDA PAP 2: VC Q&A for English speaking focal points;
– PIDA PAP 2 : Webinar Q&A for french speaking focal points;
– PIDA PAP 2 : Webinar Thematic Session on the PIDA water sector;
– Coordination meeting of the Task Force
|
– Integration Corridor Approach for infrastructure development : Knowledge sharing webinar;
– PIDA Teamplanning worshop;
– PIDA PAP 2 : Q&A for English speaking focal point.
|
The number of registrations and submission of projects by focal points remains low.
|
Regularly follow up with focal points, and think of an alternative strategy.
|
|
Axel Rusenga |
May 11, 2020 |
Axel Rusenga (May 11, 2020 – May 15, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Update from Last Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Meeting & Follow up with Focal points(EAC)
Activity plan for Next Week:
-RUN selected PIDA projects through the QCM
-Follow up with Focal points
-Meeting with CEEAC
-Webinar on Integrated Corridor Approach
-AUC-AUDA-GIZ PIDA Virtual Team planning
-SDM Project Evaluation Working Group Meeting
|
Update from Last Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Meeting & Follow up with Focal points(EAC)
|
-RUN selected PIDA projects through the QCM
-Follow up with Focal points
-Meeting with CEEAC
-Webinar on Integrated Corridor Approach
-AUC-AUDA-GIZ PIDA Virtual Team planning
-SDM Project Evaluation Working Group Meeting
|
|
|
|
Sami Hafnaoui |
May 11, 2020 |
Sami Hafnaoui (May 11, 2020 – May 19, 2020) |
Other |
Update from Last Week:
Participate with the PRIDA working Group for Market Entry meeting.
Participate with the PRIDA working Group for Data protection meeting.
Worked on PRIDNA paper for UMA
Activity plan for Next Week:
Same as previous PRIDA projet.
|
Participate with the PRIDA working Group for Market Entry meeting.
Participate with the PRIDA working Group for Data protection meeting.
Worked on PRIDNA paper for UMA
|
Same as previous PRIDA projet.
|
|
|
|
Younes Touitha |
May 4, 2020 |
Younes Touitha (May 4, 2020 – May 8, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– VC PIDA PAP2, Job creation toolkit thematic webinar: 08/05/2020
– Updating of the Covid 19 responses paper: employment and infrastructure
Activity plan for Next Week:
– Session Q&A for focal points french speaking: 12/05/2020
– Coordination meeting with the PIDA task force members and CPCS: 13/05/2020
– PIDA PAP2 VC: Thematic session on the water sector; 14/05/2020
– Continue working on Covid-19 responses
Challenges requiring attention:
The rate of projects proposed by the focal points is low.
Recommendations:
Make reminders and regular follow-up with focal points.
|
– VC PIDA PAP2, Job creation toolkit thematic webinar: 08/05/2020
– Updating of the Covid 19 responses paper: employment and infrastructure
|
– Session Q&A for focal points french speaking: 12/05/2020
– Coordination meeting with the PIDA task force members and CPCS: 13/05/2020
– PIDA PAP2 VC: Thematic session on the water sector; 14/05/2020
– Continue working on Covid-19 responses
|
The rate of projects proposed by the focal points is low.
|
Make reminders and regular follow-up with focal points.
|
|
Ephrem Getahun |
May 4, 2020 |
Ephrem Getahun (May 4, 2020 – May 8, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– provided input to the ToR for development of e-learning course for Gender-Mainstreaming and PIDA Project Preparation prepared by GIZ
– worked with the EU-ISM communications expert to identify the requirements of the work to present PIDA PAP 2 projects to decision makers in an interactive manner
– reviewed a paper on ‘Managing River Basin Investment Portfolios’ by GIZ consultant (REBEL Group) and consolidated comments from AUDA-NEPAD and GWP SA. Forwarded comment to consultant for enhancement of the report.
– participated in the weekly EI/GIZ and various other group online meetings
– provided support on PIDA PAP 2 website regarding access, project submission and other related issues
– spent some time on job creation toolkit enhancement
– spent some time on PICI web portal development
Activity plan for Next Week:
– continue with the work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– start working on PIDA SDM online Application Submission forms
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
– provided input to the ToR for development of e-learning course for Gender-Mainstreaming and PIDA Project Preparation prepared by GIZ
– worked with the EU-ISM communications expert to identify the requirements of the work to present PIDA PAP 2 projects to decision makers in an interactive manner
– reviewed a paper on ‘Managing River Basin Investment Portfolios’ by GIZ consultant (REBEL Group) and consolidated comments from AUDA-NEPAD and GWP SA. Forwarded comment to consultant for enhancement of the report.
– participated in the weekly EI/GIZ and various other group online meetings
– provided support on PIDA PAP 2 website regarding access, project submission and other related issues
– spent some time on job creation toolkit enhancement
– spent some time on PICI web portal development
|
– continue with the work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– start working on PIDA SDM online Application Submission forms
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
|
|
|
Abdou Rahman Mboob |
May 4, 2020 |
Abdou Rahman Mboob (May 4, 2020 – May 8, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Attend a VC meeting with the Egyptian Task Team for the ICTN – Master Plan
2. Attend the AU-EU TAF – Working Group VC meeting on the harmonization of Africa Single Electricity Market Study (Lot 8&9)
3. Attend Steering Committee Meeting AU-EU TAF Virtual Meeting (VC) – Single Electricity Market (Lot 8&9)
4. Q&A Session dedicated to English Focal points for PIDA PAP2 – participated in the training session for selection criteria.
5. PIDA PAP 2 Market and Demand Study – Attended ICT sector consultation with consultants
Activity plan for Next Week:
1. Meeting with Egyptian ICTN Task team
2. Meeting on COVID19 – Cyber security paper
3. Attend IGF Webinar – on HLPDC Recommendation 5/AB
|
1. Attend a VC meeting with the Egyptian Task Team for the ICTN – Master Plan
2. Attend the AU-EU TAF – Working Group VC meeting on the harmonization of Africa Single Electricity Market Study (Lot 8&9)
3. Attend Steering Committee Meeting AU-EU TAF Virtual Meeting (VC) – Single Electricity Market (Lot 8&9)
4. Q&A Session dedicated to English Focal points for PIDA PAP2 – participated in the training session for selection criteria.
5. PIDA PAP 2 Market and Demand Study – Attended ICT sector consultation with consultants
|
1. Meeting with Egyptian ICTN Task team
2. Meeting on COVID19 – Cyber security paper
3. Attend IGF Webinar – on HLPDC Recommendation 5/AB
|
|
|
|
Adama Deen |
May 4, 2020 |
Adama Deen (May 4, 2020 – May 8, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Peer reviewed of sample raw data of survey results, captured by CPCS for EAC pre-market sounding
2. Gave comments to the Consultant, on the 3rd Deliverable report, on the on-going HSR Advocacy Consultancy
3. Prepared draft Concept note on the planned Virtual Meeting with EAC Secretariat, and the two (2) footprint states (Tanzania and Rwanda) to assess national readiness of the countries to implement HSR Pilot-2
Activity plan for Next Week:
Follow-up on pending/on-going activities, including Covid19 contribution paper.
Challenges requiring attention:
Need feedback on the draft Covid contribution Paper (on Government spending) from team members assigned to address the topic.
|
1. Peer reviewed of sample raw data of survey results, captured by CPCS for EAC pre-market sounding
2. Gave comments to the Consultant, on the 3rd Deliverable report, on the on-going HSR Advocacy Consultancy
3. Prepared draft Concept note on the planned Virtual Meeting with EAC Secretariat, and the two (2) footprint states (Tanzania and Rwanda) to assess national readiness of the countries to implement HSR Pilot-2
|
Follow-up on pending/on-going activities, including Covid19 contribution paper.
|
Need feedback on the draft Covid contribution Paper (on Government spending) from team members assigned to address the topic.
|
|
|
Sami Hafnaoui |
May 4, 2020 |
Sami Hafnaoui (May 4, 2020 – May 8, 2020) |
Other |
Update from Last Week:
– Participation At both groups of work of PRIDA project.
– Worked on COVID response paper.
– Worked on : How can AUDA/NEPAD be more effective on the National level.
Activity plan for Next Week:
PRIDA project.
COVID response paper.
Better effectiveness approach on the National level.
|
– Participation At both groups of work of PRIDA project.
– Worked on COVID response paper.
– Worked on : How can AUDA/NEPAD be more effective on the National level.
|
PRIDA project.
COVID response paper.
Better effectiveness approach on the National level.
|
|
|
|
Lovasoa Christine Razanamahan |
May 4, 2020 |
Lovasoa Christine Razanamahan (May 4, 2020 – May 8, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
I-Attended online meetings: 1) EI regular meeting, 2) with GWP on water projects , 3) regular SDM process on testing the QCM tool,
II-Amended the background and context sections of COVID 19 paper on the infrastructure employment effects,
III-Participated on organizing the integrated corridor projects through JICA webinar: 1) arranged with the knowledge management division the platform type for the webinar , 2) checked the name of the PIDA focal point to be contacted for the webinar invitation.
IV-Drafted questionnaire for water experts at AUC level.
V-Drafted the minute of the EI regular meeting.
Activity plan for Next Week:
-will attend online meetings: 1) EI regular meeting, 2) regular SDM process on testing the QCM tool and 3) Webinar on PIDA PAP 2 process on PIDA Job toolkit presentation;
-will participate on the interview panel at AUC level;
-Will assist on organizing the integrated corridor projects through JICA Webinar
Challenges requiring attention:
-Clear rule and conditions on the re-opening of the office
|
I-Attended online meetings: 1) EI regular meeting, 2) with GWP on water projects , 3) regular SDM process on testing the QCM tool,
II-Amended the background and context sections of COVID 19 paper on the infrastructure employment effects,
III-Participated on organizing the integrated corridor projects through JICA webinar: 1) arranged with the knowledge management division the platform type for the webinar , 2) checked the name of the PIDA focal point to be contacted for the webinar invitation.
IV-Drafted questionnaire for water experts at AUC level.
V-Drafted the minute of the EI regular meeting.
|
-will attend online meetings: 1) EI regular meeting, 2) regular SDM process on testing the QCM tool and 3) Webinar on PIDA PAP 2 process on PIDA Job toolkit presentation;
-will participate on the interview panel at AUC level;
-Will assist on organizing the integrated corridor projects through JICA Webinar
|
-Clear rule and conditions on the re-opening of the office
|
|
|
Jose Luis Bobes |
May 4, 2020 |
Jose Luis Bobes (May 4, 2020 – May 8, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
TOR about increasing the usability of the PIDA Virtual Information Portal prepared internally at DT-Global, ready for distribution and final comments next week
Draft Paper on the impact of COVID19 on IT Infrastructure sent to EIF for feedback
Facilitated coordination meetings Energy NKE
Activity plan for Next Week:
Prepare Concept Note PIDA Project Cycle Operations Manual integrating modus operandi of existing tools and future tools (CO2, gender, etc.)
Agree on TOR to increase the usability of the PIDA 1 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
Attend PIDA PAP 2 Webinars
|
TOR about increasing the usability of the PIDA Virtual Information Portal prepared internally at DT-Global, ready for distribution and final comments next week
Draft Paper on the impact of COVID19 on IT Infrastructure sent to EIF for feedback
Facilitated coordination meetings Energy NKE
|
Prepare Concept Note PIDA Project Cycle Operations Manual integrating modus operandi of existing tools and future tools (CO2, gender, etc.)
Agree on TOR to increase the usability of the PIDA 1 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
Attend PIDA PAP 2 Webinars
|
|
|
|
Jose Luis Bobes |
April 27, 2020 |
Jose Luis Bobes (April 27, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
TOR about increasing the usability of the PIDA Virtual Information Portal prepared internally at DT-Global, ready for distribution and final comments next week
Draft Paper on the impact of COVID19 on IT Infrastructure. Waiting for feedback from ICT NKE before sending to the team
Facilitated coordination meetings to coordinate Digital Marketing NKE work on PIDA 2 portal
Meeting with the consultant working on CBN (Letsema)
Activity plan for Next Week:
Prepare Concept Note PIDA Project Cycle Operations Manual integrating modus operandi of existing tools and future tools (CO2, gender, etc.)
Agree on TOR to increase the usability of the PIDA 1 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
Attend and participate in the Webinar for PIDA PAP2 Task Force Q&A – (28/04/20)
Recommendations:
For tomorrow agenda maybe we should start discussing how to go back to the new normality
|
TOR about increasing the usability of the PIDA Virtual Information Portal prepared internally at DT-Global, ready for distribution and final comments next week
Draft Paper on the impact of COVID19 on IT Infrastructure. Waiting for feedback from ICT NKE before sending to the team
Facilitated coordination meetings to coordinate Digital Marketing NKE work on PIDA 2 portal
Meeting with the consultant working on CBN (Letsema)
|
Prepare Concept Note PIDA Project Cycle Operations Manual integrating modus operandi of existing tools and future tools (CO2, gender, etc.)
Agree on TOR to increase the usability of the PIDA 1 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
Attend and participate in the Webinar for PIDA PAP2 Task Force Q&A – (28/04/20)
|
|
For tomorrow agenda maybe we should start discussing how to go back to the new normality
|
|
Ephrem Getahun |
April 27, 2020 |
Ephrem Getahun (April 27, 2020 – May 1, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– held two meetings with EU-ISM team and AUC to clarify the role of the Digital Communication Expert in the PIDA PAP 2 process against existing tools such as VPIC and AID. Further held technical discussions with the expert for more collaboration
– participated in the weekly EI and GIZ PIDA team meetings as well as COVID 19 updates
– attended two webinars organized by AUC on PIDA PAP 2 process (fist Q&A and gender mainstreaming)
– monitored PIDA PAP 2 website usage and refined its usability
– continued the work on enhancing the job creation toolkit to integrate benchmarks for new sub-sectors
– continued the development of PICI web portal
Activity plan for Next Week:
– continue with the work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
– held two meetings with EU-ISM team and AUC to clarify the role of the Digital Communication Expert in the PIDA PAP 2 process against existing tools such as VPIC and AID. Further held technical discussions with the expert for more collaboration
– participated in the weekly EI and GIZ PIDA team meetings as well as COVID 19 updates
– attended two webinars organized by AUC on PIDA PAP 2 process (fist Q&A and gender mainstreaming)
– monitored PIDA PAP 2 website usage and refined its usability
– continued the work on enhancing the job creation toolkit to integrate benchmarks for new sub-sectors
– continued the development of PICI web portal
|
– continue with the work on the job creation toolkit enhancement exercise
– continue with the development of PICI web portal
– engage with various colleagues and stakeholders for exchanging information and support one another
– attend to any other specific requests coming from colleagues
|
|
|
|
Abdou Rahman Mboob |
April 27, 2020 |
Abdou Rahman Mboob (April 27, 2020 – May 1, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Reviewed Cyber security Assessment Framework Report and provide input
2. Reviewed ICTN (Master Plan Study) questionnaire and Calendar and provide input
3. Attend and participated in the Webinar for PIDA PAP2 Task Force Q&A – (21/04/20) – (46 Participants)
4. Attend and Participated in webinar for Gender Mainstreaming & Procurement actions in the selection Criteria of PIDA PAP2
5. Virtual Meeting with Brian- Cudjo (ICT consultant supporting the PIDA Project on ICT Bench Marking – for implementation at the National Level – 24/04/2020
Activity plan for Next Week:
1. Meeting with the Egyptian ICTN Task Team from Cairo – 28/04/2020
2. PIDA PAP2 – Training session and Q&A dedicated to French PIDA
3. PIDA PAP2 – Webinar Meeting PIDA Task force – Training Session
4. VC Meeting for 2nd Working Group Meeting – Harmonization of electricity market – AU-EU TAF Meeting
5.VC Meeting of AU-EU TAF Steering Committee (STC) Meeting
6. PID PAP2 – Sector Meeting with Consultants (CPCS) – ICT Sector
|
1. Reviewed Cyber security Assessment Framework Report and provide input
2. Reviewed ICTN (Master Plan Study) questionnaire and Calendar and provide input
3. Attend and participated in the Webinar for PIDA PAP2 Task Force Q&A – (21/04/20) – (46 Participants)
4. Attend and Participated in webinar for Gender Mainstreaming & Procurement actions in the selection Criteria of PIDA PAP2
5. Virtual Meeting with Brian- Cudjo (ICT consultant supporting the PIDA Project on ICT Bench Marking – for implementation at the National Level – 24/04/2020
|
1. Meeting with the Egyptian ICTN Task Team from Cairo – 28/04/2020
2. PIDA PAP2 – Training session and Q&A dedicated to French PIDA
3. PIDA PAP2 – Webinar Meeting PIDA Task force – Training Session
4. VC Meeting for 2nd Working Group Meeting – Harmonization of electricity market – AU-EU TAF Meeting
5.VC Meeting of AU-EU TAF Steering Committee (STC) Meeting
6. PID PAP2 – Sector Meeting with Consultants (CPCS) – ICT Sector
|
|
|
|
Lovasoa Christine Razanamahan |
April 27, 2020 |
Lovasoa Christine Razanamahan (April 27, 2020 – May 1, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
-Consolidated the feedback on the Cybersecurity assessment report
-Amended the COVID 19 paper in the infrastructure employment effects
-Drafted the spreadsheet cross-table in COVID 19 in Africa on: exportation products; cash transfer, School trend and fiscal status.
-Attended online meetings: EI regular meeting, PIDA PAP 2 French session, SDM expert pool, Transboundary Water with partners (GWP, AMCOM, RBO and AUC), EU with Jose Luis Bobes, AU Youth Webinar on Human rights and COVID 19,
Activity plan for Next Week:
-To review River Basin Organisation (RBO) document
-To finalise COVID 19 paper
-To review EU ToR on the VPIC Analyst advertisment
-To attend online meetings: EI regular meeting, PIDA PAP 2 English session, SDM expert pool, Transboundary Water with consultant CPCS, AU Youth Webinar on The Long-Term Impact of COVID-19 on the Lives, Lifestyles and Livelihoods of African Youth
|
-Consolidated the feedback on the Cybersecurity assessment report
-Amended the COVID 19 paper in the infrastructure employment effects
-Drafted the spreadsheet cross-table in COVID 19 in Africa on: exportation products; cash transfer, School trend and fiscal status.
-Attended online meetings: EI regular meeting, PIDA PAP 2 French session, SDM expert pool, Transboundary Water with partners (GWP, AMCOM, RBO and AUC), EU with Jose Luis Bobes, AU Youth Webinar on Human rights and COVID 19,
|
-To review River Basin Organisation (RBO) document
-To finalise COVID 19 paper
-To review EU ToR on the VPIC Analyst advertisment
-To attend online meetings: EI regular meeting, PIDA PAP 2 English session, SDM expert pool, Transboundary Water with consultant CPCS, AU Youth Webinar on The Long-Term Impact of COVID-19 on the Lives, Lifestyles and Livelihoods of African Youth
|
|
|
|
Younes Touitha |
April 27, 2020 |
Younes Touitha (April 27, 2020 – May 1, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– PIDA PAP2 VC: Q&A session dedicated to French-speaking focal points, 28/04/2020
– VC Market and Demand study with AUC and CPCS – Transport sector Work paper 2 and 3 , 29/04/2020
– PIDA PAP2 VC: Question and answer sessions dedicated to English speaking focal points, 30/04/2020
– Covid19 responses, updated document on employment and infrastructure
Activity plan for Next Week:
– PIDA PAP2; Monitoring and coordination with focal points in the North region, to register and propose projects
– Continue to work on the project sheet for the special economic zone – UMA
– Continue to work on the Covid19 reponses, employment and infrastructure
– Support for UMA for the preparation of the conference of 5 + 5 DIALOGUE FOURTH MINISTERIAL CONFERENCE ON RESEARCH, INNOVATION AND HIGHER EDUCATION
Challenges requiring attention:
The registration rate of country focal points on the PIDA PAP2 site is still low
Recommendations:
Remind focal points to register, and follow up with them regularly
|
– PIDA PAP2 VC: Q&A session dedicated to French-speaking focal points, 28/04/2020
– VC Market and Demand study with AUC and CPCS – Transport sector Work paper 2 and 3 , 29/04/2020
– PIDA PAP2 VC: Question and answer sessions dedicated to English speaking focal points, 30/04/2020
– Covid19 responses, updated document on employment and infrastructure
|
– PIDA PAP2; Monitoring and coordination with focal points in the North region, to register and propose projects
– Continue to work on the project sheet for the special economic zone – UMA
– Continue to work on the Covid19 reponses, employment and infrastructure
– Support for UMA for the preparation of the conference of 5 + 5 DIALOGUE FOURTH MINISTERIAL CONFERENCE ON RESEARCH, INNOVATION AND HIGHER EDUCATION
|
The registration rate of country focal points on the PIDA PAP2 site is still low
|
Remind focal points to register, and follow up with them regularly
|
|
Daphine Muzawazi |
April 27, 2020 |
Daphine Muzawazi (April 27, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Meeting on cbn/covid19 actions with GIZ
CBN technical validation workshop with GIZ and Letsema.
Provided inputs to the proposals raised in the validation workshop
Activity plan for Next Week:
Diagnostic working session on CBN:
• Update vision, mission and objectives
• Name change considerations
• Edits to the institutional designs
|
Meeting on cbn/covid19 actions with GIZ
CBN technical validation workshop with GIZ and Letsema.
Provided inputs to the proposals raised in the validation workshop
|
Diagnostic working session on CBN:
• Update vision, mission and objectives
• Name change considerations
• Edits to the institutional designs
|
|
|
|
Flore Kamdomg |
April 27, 2020 |
Flore Kamdomg (April 27, 2020 – May 6, 2020) |
Other |
Update from Last Week:
Mainly busy with Admin tasks
– Continue database collection with colleagues on stakeholders information
– Continue to track progress on of colleagues inputs for the response paper for COVID 19
– Attend to the EI regular team meeting
– Assist colleagues with RECs and external stakeholders information
– Finalised and consolidation of the questionnaire for PIDA survey and submitted to the VPIC Specialist
Activity plan for Next Week:
– Continue to track progress from colleagues inputs for the response paper for COVID 19
– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Continue to attend to general queries made to the EI Division on a daily basis
Challenges requiring attention:
Recommendations:
|
Mainly busy with Admin tasks
– Continue database collection with colleagues on stakeholders information
– Continue to track progress on of colleagues inputs for the response paper for COVID 19
– Attend to the EI regular team meeting
– Assist colleagues with RECs and external stakeholders information
– Finalised and consolidation of the questionnaire for PIDA survey and submitted to the VPIC Specialist
|
– Continue to track progress from colleagues inputs for the response paper for COVID 19
– Continue to provide Admin assistance to colleagues working with the COVID 19 response
– Continue to attend to general queries made to the EI Division on a daily basis
|
none
|
none
|
|
Towela Nyirenda – Jere |
April 27, 2020 |
Towela Nyirenda – Jere (April 27, 2020 – May 1, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
Finalisation of Co-Impact Concept Note with ILO and Shared Value Africa Initiative.
Proposal submitted on April 30th.
Brief of AUDA-NEPAD-ILO-SVAI Concept Note for Co-Impact Systems Change Grant
Initiative Name – Women-led Economic Systems Change: Leveraging Infrastructure and Enterprise Development in High-value sectors in Africa
Lead Organization – Africa Union Development Agency (AUDA-NEPAD)
Partners: International Labour Organisation (ILO) and Shared Value Africa Initiative (SVAI)
Overview
SMEs can drive African-led economic transformation and benefit millions of female entrepreneurs locked into low-productive and indecent jobs. The project will apply market systems development (MSD) to address underlying constraints inhibiting SME’s potential for systemic change by combining infrastructure and enterprise development in agricultural and energy sectors.
African countries need more than just industrial growth. Millions of small-scale entrepreneurs make a living in the informal rural economy with little or no access to modern smart agriculture implements, no access to finance and to affordable and sustainable energy for productive activities. A systems change is needed with a re-allocation of resources from low-productivity activities to high productivity activities that can lead to more and better jobs in the rural; economy while also addressing climate change through access to affordable and cleaner energy for millions of Africans that are off the electric grid.
The project will conduct Market Systems Analyses (MSAs) – building on the ILO’s vast experience in this area – in the energy and agriculture sectors in each of the target countries, focusing on unpacking the root causes, key constraints and market bottlenecks that hinder women led enterprises’ abilities to grow and create economic, environmental and social value. The MSAs will inform the development of high potential interventions models to address both demand and supply constraints in the two sectors and will combine investments in enterprise productive assets – e.g. small value addition processing plants of horticultural produce – with infrastructure development to ensure that women entrepreneurs with stronger management capabilities and higher productivity (supply side) is combined with direct access to markets (demand side). This “corridor” approach – building on AUDA-NEPAD, SVAI and ILO combined experiences – focusses on developing local value chains and related up-stream sub-sectors with growth potential and links to national markets.
Systems change
The project seeks to “shift the development discourse” by conducting MSAs in both the energy and agriculture sectors in each country, focusing on unpacking the constraints and root causes to identify the women-led economic systems change that can be realized by leveraging infrastructure and enterprise development together. The MSAs will be conducted through a gender lens – putting women led enterprises at the forefront of the analysis framework and will examine the nexus between infrastructure investments and enterprise development. The result will be an action plan of high potential interventions which can address the root causes to key system constraints.
The project will induce systems change through existing market system actors such as renewable energy firms and investors, agriculture input suppliers and aggregators, SMEs in both value chains, and existing government infrastructure and enterprise development programmes. Working through existing market actors enhances ownership of initiatives, ensure they are designed in a way that market actors have their “skin in the game” and have commercial incentives to sustain the system change. Market systems development initiatives don’t success in any other way. At the same time, these interventions will be supported by innovative public investments in infrastructure development, based on inclusive and eco-friendly criteria. The operational framework is offered by the AUDA-NEPAD Programme for Infrastructure Development; a continent-wide infrastructure program for the development of priority infrastructure as well as the “100,000 SMEs for 1 million jobs” initiative, locating both as essential elements of the AUDA-NEPAD Integrated Corridor Approach. We are confident that shifting the conversation towards the nexus of inclusive infrastructure, enterprise and market development projects that are gender-sensitive and maximize economic transformation for women is what Africa needs.
The results will be centered around economic opportunities but will also have spill-over outcomes into education and health sectors. All key performance indicators will be developed following the MSAs and disaggregated by age/sex.
Results Chain: Impact on SME level (viability, skills, growth & development) => market access + job growth => improved household incomes => improved local rural/peri-urban economy
Budget
US$50 million/5 years, US$10 million/ year, US$2 million per country/year.
Key cost drivers:
1) Operation of the programme implementation unit:
i. 3 professionals/technical staff, 2 admin/finance staff based at AUDA-NEPAD South Africa
ii. 2 experts (enterprise and engineering), 1 admin/finance staff in each country’s national implementing entity for systems change sustainability
2) Project Activities:
i. Infrastructure development support, including contracting/procurement from SMEs
ii. Incubation and business start-up
iii. Capacity development of SMEs, rural women owned SMEs, including in climate-smart agriculture, agro-processing, etc
iv. Private sector partnership building and capacity development of BDS providers
v. M&E, impact assessment, learning and knowledge sharing
Conclusion
The coronavirus pandemic will have unprecedented effects on the labour markets in Africa, especially for women and SMEs, which will be the first to suffer from the devastating consequences of the economic downturn. This global crisis confronts us with new challenges, but it also give us the opportunity to systemically address the structural underlying reasons why problems such as market systems underperformance for women exist in the first place ─instead of just treating new symptoms as they emerge. In contributing to building back better and more resilient market systems, we will spend the necessary time investigating the ‘why’ before rushing in with a ‘solution’, such that our interventions will be better positioned to initiate catalytic changes among local actors to bring about widespread and long-lasting decent work outcomes for women, men and SMEs. In facilitating pivotal infrastructure and enterprise development, we seek to mainstream a shift towards inclusive but also sustainable business models embedding green solutions as part of their core operations and behaviours.
Activity plan for Next Week:
Identify other resource mobilisation opportunities linked to COVID-19
Challenges requiring attention:
Clarify internal AUDA-NEPAD processes and coordination with various units and directorates as regards external collaboration
Recommendations:
Need to have systematic approach to resource mobilisation within EI team
|
Finalisation of Co-Impact Concept Note with ILO and Shared Value Africa Initiative.
Proposal submitted on April 30th.
Brief of AUDA-NEPAD-ILO-SVAI Concept Note for Co-Impact Systems Change Grant
Initiative Name – Women-led Economic Systems Change: Leveraging Infrastructure and Enterprise Development in High-value sectors in Africa
Lead Organization – Africa Union Development Agency (AUDA-NEPAD)
Partners: International Labour Organisation (ILO) and Shared Value Africa Initiative (SVAI)
Overview
SMEs can drive African-led economic transformation and benefit millions of female entrepreneurs locked into low-productive and indecent jobs. The project will apply market systems development (MSD) to address underlying constraints inhibiting SME’s potential for systemic change by combining infrastructure and enterprise development in agricultural and energy sectors.
African countries need more than just industrial growth. Millions of small-scale entrepreneurs make a living in the informal rural economy with little or no access to modern smart agriculture implements, no access to finance and to affordable and sustainable energy for productive activities. A systems change is needed with a re-allocation of resources from low-productivity activities to high productivity activities that can lead to more and better jobs in the rural; economy while also addressing climate change through access to affordable and cleaner energy for millions of Africans that are off the electric grid.
The project will conduct Market Systems Analyses (MSAs) – building on the ILO’s vast experience in this area – in the energy and agriculture sectors in each of the target countries, focusing on unpacking the root causes, key constraints and market bottlenecks that hinder women led enterprises’ abilities to grow and create economic, environmental and social value. The MSAs will inform the development of high potential interventions models to address both demand and supply constraints in the two sectors and will combine investments in enterprise productive assets – e.g. small value addition processing plants of horticultural produce – with infrastructure development to ensure that women entrepreneurs with stronger management capabilities and higher productivity (supply side) is combined with direct access to markets (demand side). This “corridor” approach – building on AUDA-NEPAD, SVAI and ILO combined experiences – focusses on developing local value chains and related up-stream sub-sectors with growth potential and links to national markets.
Systems change
The project seeks to “shift the development discourse” by conducting MSAs in both the energy and agriculture sectors in each country, focusing on unpacking the constraints and root causes to identify the women-led economic systems change that can be realized by leveraging infrastructure and enterprise development together. The MSAs will be conducted through a gender lens – putting women led enterprises at the forefront of the analysis framework and will examine the nexus between infrastructure investments and enterprise development. The result will be an action plan of high potential interventions which can address the root causes to key system constraints.
The project will induce systems change through existing market system actors such as renewable energy firms and investors, agriculture input suppliers and aggregators, SMEs in both value chains, and existing government infrastructure and enterprise development programmes. Working through existing market actors enhances ownership of initiatives, ensure they are designed in a way that market actors have their “skin in the game” and have commercial incentives to sustain the system change. Market systems development initiatives don’t success in any other way. At the same time, these interventions will be supported by innovative public investments in infrastructure development, based on inclusive and eco-friendly criteria. The operational framework is offered by the AUDA-NEPAD Programme for Infrastructure Development; a continent-wide infrastructure program for the development of priority infrastructure as well as the “100,000 SMEs for 1 million jobs” initiative, locating both as essential elements of the AUDA-NEPAD Integrated Corridor Approach. We are confident that shifting the conversation towards the nexus of inclusive infrastructure, enterprise and market development projects that are gender-sensitive and maximize economic transformation for women is what Africa needs.
The results will be centered around economic opportunities but will also have spill-over outcomes into education and health sectors. All key performance indicators will be developed following the MSAs and disaggregated by age/sex.
Results Chain: Impact on SME level (viability, skills, growth & development) => market access + job growth => improved household incomes => improved local rural/peri-urban economy
Budget
US$50 million/5 years, US$10 million/ year, US$2 million per country/year.
Key cost drivers:
1) Operation of the programme implementation unit:
i. 3 professionals/technical staff, 2 admin/finance staff based at AUDA-NEPAD South Africa
ii. 2 experts (enterprise and engineering), 1 admin/finance staff in each country’s national implementing entity for systems change sustainability
2) Project Activities:
i. Infrastructure development support, including contracting/procurement from SMEs
ii. Incubation and business start-up
iii. Capacity development of SMEs, rural women owned SMEs, including in climate-smart agriculture, agro-processing, etc
iv. Private sector partnership building and capacity development of BDS providers
v. M&E, impact assessment, learning and knowledge sharing
Conclusion
The coronavirus pandemic will have unprecedented effects on the labour markets in Africa, especially for women and SMEs, which will be the first to suffer from the devastating consequences of the economic downturn. This global crisis confronts us with new challenges, but it also give us the opportunity to systemically address the structural underlying reasons why problems such as market systems underperformance for women exist in the first place ─instead of just treating new symptoms as they emerge. In contributing to building back better and more resilient market systems, we will spend the necessary time investigating the ‘why’ before rushing in with a ‘solution’, such that our interventions will be better positioned to initiate catalytic changes among local actors to bring about widespread and long-lasting decent work outcomes for women, men and SMEs. In facilitating pivotal infrastructure and enterprise development, we seek to mainstream a shift towards inclusive but also sustainable business models embedding green solutions as part of their core operations and behaviours.
|
Identify other resource mobilisation opportunities linked to COVID-19
|
Clarify internal AUDA-NEPAD processes and coordination with various units and directorates as regards external collaboration
|
Need to have systematic approach to resource mobilisation within EI team
|
|
Towela Nyirenda – Jere |
April 27, 2020 |
Towela Nyirenda – Jere (April 27, 2020 – May 7, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Participated in CBN Technical Validation Workshop
Activity plan for Next Week:
Arrange with Ibrah to brief Amine on status of CBN operationalisation
Finalise with GIZ on FA amendment to include CBN
Follow up on CBN stakeholder engagement event
|
Participated in CBN Technical Validation Workshop
|
Arrange with Ibrah to brief Amine on status of CBN operationalisation
Finalise with GIZ on FA amendment to include CBN
Follow up on CBN stakeholder engagement event
|
|
|
|
Towela Nyirenda – Jere |
April 27, 2020 |
Towela Nyirenda – Jere (April 27, 2020 – May 7, 2020) |
Other |
Update from Last Week:
Review of Post-COVID Blue print prepared by PIPD
Follow up on transfer of funds for PIDA CAP transition from AUC to AUDA – submission of documents to OCEO through Chief of Staff
Follow up on payment to EndCode for Cybersecurity Assessment – submission of request to Amine
Review of G20 Concept Note on Quality Infrastructure for Regional Connectivity
Activity plan for Next Week:
Consider how to position EI in AUDA Post-COVID recovery
Continue following up on PIDA CAP funds
Recommendations:
Need to organise dedicated working session on COVID and post-COVID for EI Team
|
Review of Post-COVID Blue print prepared by PIPD
Follow up on transfer of funds for PIDA CAP transition from AUC to AUDA – submission of documents to OCEO through Chief of Staff
Follow up on payment to EndCode for Cybersecurity Assessment – submission of request to Amine
Review of G20 Concept Note on Quality Infrastructure for Regional Connectivity
|
Consider how to position EI in AUDA Post-COVID recovery
Continue following up on PIDA CAP funds
|
|
Need to organise dedicated working session on COVID and post-COVID for EI Team
|
|
Towela Nyirenda – Jere |
April 27, 2020 |
Towela Nyirenda – Jere (April 27, 2020 – May 7, 2020) |
Enhanced capacity to implement the AFCFTA |
Update from Last Week:
– Participation in meetings and discussions on the Africa Supply Chain Platform as part of AUDA COVID-19 Response.
– Briefing and check-in with Vincent on EI Markets and Trade Division, overall priorities and support to AfCFTA implementation
– Meetings between EI and Industrialisation on joint approach to AfCFTA support
– Review of AfCFTA Stock-take document and organisation of reference documents
Activity plan for Next Week:
– Meeting with AFC
– Agree with Martin steps to completion of AfCFTA joint approach
Challenges requiring attention:
– clarity on role of AUDA in general and EI in particular in the COVID-19 response for Supply chain and logistics
|
– Participation in meetings and discussions on the Africa Supply Chain Platform as part of AUDA COVID-19 Response.
– Briefing and check-in with Vincent on EI Markets and Trade Division, overall priorities and support to AfCFTA implementation
– Meetings between EI and Industrialisation on joint approach to AfCFTA support
– Review of AfCFTA Stock-take document and organisation of reference documents
|
– Meeting with AFC
– Agree with Martin steps to completion of AfCFTA joint approach
|
– clarity on role of AUDA in general and EI in particular in the COVID-19 response for Supply chain and logistics
|
|
|
Sami Hafnaoui |
April 20, 2020 |
Sami Hafnaoui (April 20, 2020 – April 24, 2020) |
Other |
Update from Last Week:
PRIDA project, two working group were defined:
– PRIDA M&E of Data Protection and Data Localization Policy and Regulation In Africa.
– PRIDA M&E of Market Entry Conditions (Authorization/Licensing) Policy and Regulation In Africa.
I will be participating in weekly meeting for both groups (standing for UMA) for the next 6 weeks.
Activity plan for Next Week:
Challenges requiring attention:
|
PRIDA project, two working group were defined:
– PRIDA M&E of Data Protection and Data Localization Policy and Regulation In Africa.
– PRIDA M&E of Market Entry Conditions (Authorization/Licensing) Policy and Regulation In Africa.
I will be participating in weekly meeting for both groups (standing for UMA) for the next 6 weeks.
|
PRIDA project
|
Working conditions
|
|
|
Ephrem Getahun |
April 20, 2020 |
Ephrem Getahun (April 20, 2020 – April 24, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. with colleagues at GIZ PIDA, finalized the job creation toolkit enhancement ToR. Towela, Tich and Ibrah have also provided further comments on the ToR and now we are ready to proceed with the procurement
2. studied the job creation toolkit program code involving benchmarks
3. participated in meetings (EI weekly and GIZ PIDA meetings as well as bilateral)
3. started the development of the PICI web portal after obtaining initial proposed structure and content from Dr Mustata
4. provided support as users register on PIDA PAP 2 website and undertook minor enhancements
5. provided support to EI team as they login to the weekly activity reporting platform
Activity plan for Next Week:
1. continue with the work on the job creation toolkit enhancement exercise
2. continue with the development of PICI web portal
3. engage with various colleagues and stakeholders for exchanging information and support one another
|
1. with colleagues at GIZ PIDA, finalized the job creation toolkit enhancement ToR. Towela, Tich and Ibrah have also provided further comments on the ToR and now we are ready to proceed with the procurement
2. studied the job creation toolkit program code involving benchmarks
3. participated in meetings (EI weekly and GIZ PIDA meetings as well as bilateral)
3. started the development of the PICI web portal after obtaining initial proposed structure and content from Dr Mustata
4. provided support as users register on PIDA PAP 2 website and undertook minor enhancements
5. provided support to EI team as they login to the weekly activity reporting platform
|
1. continue with the work on the job creation toolkit enhancement exercise
2. continue with the development of PICI web portal
3. engage with various colleagues and stakeholders for exchanging information and support one another
|
|
|
|
Towela Nyirenda – Jere |
April 20, 2020 |
Towela Nyirenda – Jere (April 20, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Meetings on April 16 and 17 to discuss Co-Impact proposal application with ILO, AUDA-NEPAD Skills and Youth Employment and Shared Value for Africa Initiative
Broad idea is a proposal focusing on the transformative impact of infrastructure development for provision of economic opportunities and access to basic services (education, health, sanitation, etc).
Co-Impact provides grants ranging from US $10-25 million over 5 years, with a requirement for co-funding: they would fund up to a maximum of 50% of the program cost.
The guidelines for the proposals are that it should:
• Focus on improving the lives of one million people or more;
• Have a clearly articulated approach to changing systems at scale;
• Be led by and deeply rooted in the global South/countries in which they seek to make a difference; address gender equity and inclusion, and be substantively led by women;
• Have a strong track record of results; and
• Use evidence-informed pathways to achieve specific outcomes in health, education, and/or economic opportunity.
The timeline for the process is as follows:
– 30th April 2020: Submission of proposals
– April – July 2020: Short-listing and selection by Co-Impact of initiatives for design grants
– August- December 2020: Award of design grants (5-8 proposals)
– February – September 2021: Program Design
– December 2021: Award of Program grants (up to 3 proposals)
– Jan 2022 – December 2026: implementation period
AUDA-NEPAD approach: consider demand for entrepreneurial opportunities wrt productive sectors, opportunities for growth etc and link these to infrastructure development
Agreed on core team (AUDA-NEPAD represented by Unami from HCID) to focus on preliminary draft which would be shared for review.
Activity plan for Next Week:
Provide inputs into draft document
Prepare memo for proposal approval
Challenges requiring attention:
No specific challenges – need to get consensus with partners on countries of focus. My need an internal discussion within EI to identify PIDA projects which could be aligned to the Co-Impact proposal
|
Meetings on April 16 and 17 to discuss Co-Impact proposal application with ILO, AUDA-NEPAD Skills and Youth Employment and Shared Value for Africa Initiative
Broad idea is a proposal focusing on the transformative impact of infrastructure development for provision of economic opportunities and access to basic services (education, health, sanitation, etc).
Co-Impact provides grants ranging from US $10-25 million over 5 years, with a requirement for co-funding: they would fund up to a maximum of 50% of the program cost.
The guidelines for the proposals are that it should:
• Focus on improving the lives of one million people or more;
• Have a clearly articulated approach to changing systems at scale;
• Be led by and deeply rooted in the global South/countries in which they seek to make a difference; address gender equity and inclusion, and be substantively led by women;
• Have a strong track record of results; and
• Use evidence-informed pathways to achieve specific outcomes in health, education, and/or economic opportunity.
The timeline for the process is as follows:
– 30th April 2020: Submission of proposals
– April – July 2020: Short-listing and selection by Co-Impact of initiatives for design grants
– August- December 2020: Award of design grants (5-8 proposals)
– February – September 2021: Program Design
– December 2021: Award of Program grants (up to 3 proposals)
– Jan 2022 – December 2026: implementation period
AUDA-NEPAD approach: consider demand for entrepreneurial opportunities wrt productive sectors, opportunities for growth etc and link these to infrastructure development
Agreed on core team (AUDA-NEPAD represented by Unami from HCID) to focus on preliminary draft which would be shared for review.
|
Provide inputs into draft document
Prepare memo for proposal approval
|
No specific challenges – need to get consensus with partners on countries of focus. My need an internal discussion within EI to identify PIDA projects which could be aligned to the Co-Impact proposal
|
|
|
Chipiliro Saka |
April 20, 2020 |
Chipiliro Saka (April 20, 2020 – April 24, 2020) |
Enhanced capacity to implement the AFCFTA |
Update from Last Week:
Financial Report – Middle Income States Grant
Facilitate No cost extension for EAC Project Packaging
Attended a meeting between AUDA-NEPAD and AfCTFA technical team from AUC to discuss areas of collaboration and support
Activity plan for Next Week:
Working on a Trade & Market assignment
|
Financial Report – Middle Income States Grant
Facilitate No cost extension for EAC Project Packaging
Attended a meeting between AUDA-NEPAD and AfCTFA technical team from AUC to discuss areas of collaboration and support
|
Working on a Trade & Market assignment
|
|
|
|
Simbini Tichakunda |
April 20, 2020 |
Simbini Tichakunda (April 20, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
1. Provided inputs to the Continental Transmission Masterplan Questionnaire
2. Reviewed the paper on Employment Effects on Infrastructure
3. Participated in the PIDA Portal and Existing VPIC
Activity plan for Next Week:
1. Meeting with Egypt on the Continental Power Systems Masterplan
2. Circulate the Inception Report to Power Pools and coordinate the consultation meetings.
3. Continue work on Covid-19 response papers
|
1. Provided inputs to the Continental Transmission Masterplan Questionnaire
2. Reviewed the paper on Employment Effects on Infrastructure
3. Participated in the PIDA Portal and Existing VPIC
|
1. Meeting with Egypt on the Continental Power Systems Masterplan
2. Circulate the Inception Report to Power Pools and coordinate the consultation meetings.
3. Continue work on Covid-19 response papers
|
|
|
|
Lovasoa Christine Razanamahan |
April 20, 2020 |
Lovasoa Christine Razanamahan (April 20, 2020 – April 24, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
-Reviewed the Cybersecurity assessment report
-Drafted a concept note on the sectoral platform
-attended several online meeting: 1. EI regular meeting; 2.PIDA Focal points and Task Forces Webinar on: a) the general comment on the PIDA PAP 2 submission project, b) the Gender selection criteria & gender sensitive procurement actions ; 3. African Union Youth and Africa CDC webinar, 4. African Union Youth Division and the High Commission of the AUC webinar ; 5. SDM expert pool meeting
-Drafted a COVID 19 paper response on the Employment importance on the Job creation and skills development.
Activity plan for Next Week:
-To consolidate the feedback on the Cybersecurity assessment report and send it out
-To amend the concept note on the sectoral platform according to the internally comments
-To attend several online weekly meeting: 1. EI regular meeting; 2.PIDA Focal points and Task Forces Webinar on the general questions and answers on the Gender selection criteria & gender sensitive procurement actions for PIDA PAP 2 process; 3. African Union Youth and Africa CDC webinar, 4. African Union Youth Division and the High Commission of the AUC webinar ; 5. SDM expert pool meeting
-To amend the COVID 19 paper response on the Employment importance on the Job creation and skills development by adding feedback from colleagues.
|
-Reviewed the Cybersecurity assessment report
-Drafted a concept note on the sectoral platform
-attended several online meeting: 1. EI regular meeting; 2.PIDA Focal points and Task Forces Webinar on: a) the general comment on the PIDA PAP 2 submission project, b) the Gender selection criteria & gender sensitive procurement actions ; 3. African Union Youth and Africa CDC webinar, 4. African Union Youth Division and the High Commission of the AUC webinar ; 5. SDM expert pool meeting
-Drafted a COVID 19 paper response on the Employment importance on the Job creation and skills development.
|
-To consolidate the feedback on the Cybersecurity assessment report and send it out
-To amend the concept note on the sectoral platform according to the internally comments
-To attend several online weekly meeting: 1. EI regular meeting; 2.PIDA Focal points and Task Forces Webinar on the general questions and answers on the Gender selection criteria & gender sensitive procurement actions for PIDA PAP 2 process; 3. African Union Youth and Africa CDC webinar, 4. African Union Youth Division and the High Commission of the AUC webinar ; 5. SDM expert pool meeting
-To amend the COVID 19 paper response on the Employment importance on the Job creation and skills development by adding feedback from colleagues.
|
|
|
|
Younes Touitha |
April 20, 2020 |
Younes Touitha (April 20, 2020 – April 24, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
* Video conference meeting April 21: General Q&A on PIDA PAP2
* Meeting video conference April 23: Q & A PIDA PAP2: Gender selection criteria
* Contribution to paper covid 19 response: Employment and infrastructure
* Fill in the FRAI-COP evaluation questionnaire
* Contribution: Draft questionnaire for PIDA stackholders survey
Activity plan for Next Week:
* Q&A video conference meeting for national focal points on April 28
* Meeting video conference Job creation Toolkit (TBC) on April 30
* Meeting video conference on April 29: PIDA Market and Demand study, Transport sector consultation.
* Continue to contribute to the Covid 19 responses paper
|
* Video conference meeting April 21: General Q&A on PIDA PAP2
* Meeting video conference April 23: Q & A PIDA PAP2: Gender selection criteria
* Contribution to paper covid 19 response: Employment and infrastructure
* Fill in the FRAI-COP evaluation questionnaire
* Contribution: Draft questionnaire for PIDA stackholders survey
|
* Q&A video conference meeting for national focal points on April 28
* Meeting video conference Job creation Toolkit (TBC) on April 30
* Meeting video conference on April 29: PIDA Market and Demand study, Transport sector consultation.
* Continue to contribute to the Covid 19 responses paper
|
|
|
|
Sami Hafnaoui |
April 20, 2020 |
Sami Hafnaoui (April 20, 2020 – April 28, 2020) |
Other |
Update from Last Week:
PRIDA project : Participation in the M&E Data protection workshop as member of the M&E Data Protection working group.
PRIDA project : Participation in the M&E Market Entry workshop as member of the M&E Market Entry working group.
Reviewed Cyber Security Report.
Activity plan for Next Week:
Same activities for the PRIDA project.
|
PRIDA project : Participation in the M&E Data protection workshop as member of the M&E Data Protection working group.
PRIDA project : Participation in the M&E Market Entry workshop as member of the M&E Market Entry working group.
Reviewed Cyber Security Report.
|
Same activities for the PRIDA project.
|
|
|
|
Simbini Tichakunda |
April 20, 2020 |
Simbini Tichakunda (April 20, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
1. Provided inputs on the draft COVID-19 papers
2. Worked on the Continental Transmission Masterplan
Activity plan for Next Week:
1. Review COVID-19 papers
2. Participate in Continental Transmission Masterplan Working Group and Steering Committee meeting
3. Participate in the PIDA Energy Market Demand Study Meeting
|
1. Provided inputs on the draft COVID-19 papers
2. Worked on the Continental Transmission Masterplan
|
1. Review COVID-19 papers
2. Participate in Continental Transmission Masterplan Working Group and Steering Committee meeting
3. Participate in the PIDA Energy Market Demand Study Meeting
|
|
|
|
Axel Rusenga |
April 20, 2020 |
Axel Rusenga (April 20, 2020 – April 24, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
Activity plan for Next Week:
-RUN selected PIDA projects through the QCM
-Follow up with Focal points
|
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
|
-RUN selected PIDA projects through the QCM
-Follow up with Focal points
|
|
|
|
Ephrem Getahun |
April 13, 2020 |
Ephrem Getahun (April 13, 2020 – April 17, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. developed, tested and launched the weekly activity reporting platform for Economic Integration Division together with Ibrah
2. participated in various virtual meetings (EI team, GIZ team, AUC) as well as held bilateral meetings
3. started working on the Job Creation Toolkit enhancement exercise
4. reviewed the concept note prepared by Dr Mustafa for PICI portal development
5. provided support on the use of PIDA PAP 2 website to PIDA Focal Points
Activity plan for Next Week:
1. continue working on the job creation toolkit enhancement exercise
2. contribute to discussions in the various ongoing initiatives
3. start developing the PICI web portal in close coordination with Dr Mustafa
|
1. developed, tested and launched the weekly activity reporting platform for Economic Integration Division together with Ibrah
2. participated in various virtual meetings (EI team, GIZ team, AUC) as well as held bilateral meetings
3. started working on the Job Creation Toolkit enhancement exercise
4. reviewed the concept note prepared by Dr Mustafa for PICI portal development
5. provided support on the use of PIDA PAP 2 website to PIDA Focal Points
|
1. continue working on the job creation toolkit enhancement exercise
2. contribute to discussions in the various ongoing initiatives
3. start developing the PICI web portal in close coordination with Dr Mustafa
|
|
|
|
Jose Luis Bobes |
April 13, 2020 |
Jose Luis Bobes (April 13, 2020 – April 17, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
Further Analysis of PIDA tools for transaction advisory work: CBN, CBN 5%, SDM
Problem Statment about the usability of the PIDA Virtual Information Portal prepared. Waiting for Towela feedback before converting this document into a TOR for action
Paper on the impact of COVID19 on IT Infrastructure stared by literature review
Activity plan for Next Week:
Further analysis of how to optimize existing tools for mobilization of funds
Agree on TOR to increase the usability of the PIDA 1 portal and recommendations to integrate PIDA 2 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
|
Further Analysis of PIDA tools for transaction advisory work: CBN, CBN 5%, SDM
Problem Statment about the usability of the PIDA Virtual Information Portal prepared. Waiting for Towela feedback before converting this document into a TOR for action
Paper on the impact of COVID19 on IT Infrastructure stared by literature review
|
Further analysis of how to optimize existing tools for mobilization of funds
Agree on TOR to increase the usability of the PIDA 1 portal and recommendations to integrate PIDA 2 portal
Finish paper on the impact of COVID 19 on IT African infrastructure
|
|
|
|
Lovasoa Christine Razanamahan |
April 13, 2020 |
Lovasoa Christine Razanamahan (April 13, 2020 – April 17, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
-Drafting the concept note on the response paper for COVID 19
-Drafting some sections content of the response paper for COVID 19
-Online meeting with SDM expert pool, with Knowledge and management representative at AUDA-NEPAD
-Drafting the minutes of the last EI regular meeting
Activity plan for Next Week:
-continue to improve the content of the response paper for COVID 19
-draft the minutes of the EI regular meeting
-Continue to exchange with SDM expert pool, with Knowledge and management representative at AUDA-NEPAD.
Challenges requiring attention:
Recommendations:
|
-Drafting the concept note on the response paper for COVID 19
-Drafting some sections content of the response paper for COVID 19
-Online meeting with SDM expert pool, with Knowledge and management representative at AUDA-NEPAD
-Drafting the minutes of the last EI regular meeting
|
-continue to improve the content of the response paper for COVID 19
-draft the minutes of the EI regular meeting
-Continue to exchange with SDM expert pool, with Knowledge and management representative at AUDA-NEPAD.
|
Not available
|
Not available
|
|
Flore Kamdomg |
April 13, 2020 |
Flore Kamdomg (April 13, 2020 – April 17, 2020) |
Other |
Update from Last Week:
– Mainly busy with Admin and Procurement tasks
– Follow up on payment of invoices with Procurement and finance department ( POP was submitted to suppliers)
– Continue database collection with colleagues on stakeholders information
– Continue to track progress on of colleagues inputs for the response paper for COVID 19
– Draft the minutes of the EI regular meeting
– Sharing of vacancy announcement to colleagues for the EU Friend of Europe Project Manager on transport and connectivity position
– join the COVID 19 Health Manufacturing Team to support the supply chain system
Activity plan for Next Week:
– Finalise and consolidate the list of EI Stakeholders
– Continue to track progress from colleagues inputs for the response paper for COVID 19
– Continue working with the COVID 19 Manufacturing team
|
– Mainly busy with Admin and Procurement tasks
– Follow up on payment of invoices with Procurement and finance department ( POP was submitted to suppliers)
– Continue database collection with colleagues on stakeholders information
– Continue to track progress on of colleagues inputs for the response paper for COVID 19
– Draft the minutes of the EI regular meeting
– Sharing of vacancy announcement to colleagues for the EU Friend of Europe Project Manager on transport and connectivity position
– join the COVID 19 Health Manufacturing Team to support the supply chain system
|
– Finalise and consolidate the list of EI Stakeholders
– Continue to track progress from colleagues inputs for the response paper for COVID 19
– Continue working with the COVID 19 Manufacturing team
|
|
|
|
Younes Touitha |
April 13, 2020 |
Younes Touitha (April 13, 2020 – April 17, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– He sent the invitations by email, concerning the electrical interconnection projects between Tunisia, Libya and Egypt, with the questionnaire developed by Axel, as part of the PQL PIDA Label.
– He worked on the subject Employment and Infrastructure (Section 1 and Section 4), as part of the Covid19 responses.
Activity plan for Next Week:
– He will continue to work on the Covid 19 responses article
– He will follow with the country representatives for the PQL PIDA Label
– He will work on the UMA Special Economic Zone project sheet
Recommendations:
– Quickly share the experiences of each country to fight against the Covid 19
|
– He sent the invitations by email, concerning the electrical interconnection projects between Tunisia, Libya and Egypt, with the questionnaire developed by Axel, as part of the PQL PIDA Label.
– He worked on the subject Employment and Infrastructure (Section 1 and Section 4), as part of the Covid19 responses.
|
– He will continue to work on the Covid 19 responses article
– He will follow with the country representatives for the PQL PIDA Label
– He will work on the UMA Special Economic Zone project sheet
|
|
– Quickly share the experiences of each country to fight against the Covid 19
|
|
Abdou Rahman Mboob |
April 13, 2020 |
Abdou Rahman Mboob (April 13, 2020 – April 17, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Meeting with AfDB team on the resource mobilisation for the Continental Master Plan (ICTN)
2. PIDA PAP2 North Africa – Training Workshops cancelled
3. COVID 19 Draft paper developed for – Cyber security and Privacy and Data Protection
Activity plan for Next Week:
1. Webinar Q&A on Selection Criteria – PIDA PAP2 Taskforce (21/04/2020) – to attend and participate
2. Webinar – Gender Selection Criteria – ANWIN (23/4/2020) – to attend and participate
3. Review Final document of Cyber security Assessment framework report
4. Review proposed Questionnaires and Calendar of teleconference meeting dates – for ICTN (Master plan study)
Challenges requiring attention:
Short notice given for cancellation of meetings – especially when dealing with a large grouping (PIDA Focal points)
Recommendations:
Enough notice to be given for cancellation of meetings.
|
1. Meeting with AfDB team on the resource mobilisation for the Continental Master Plan (ICTN)
2. PIDA PAP2 North Africa – Training Workshops cancelled
3. COVID 19 Draft paper developed for – Cyber security and Privacy and Data Protection
|
1. Webinar Q&A on Selection Criteria – PIDA PAP2 Taskforce (21/04/2020) – to attend and participate
2. Webinar – Gender Selection Criteria – ANWIN (23/4/2020) – to attend and participate
3. Review Final document of Cyber security Assessment framework report
4. Review proposed Questionnaires and Calendar of teleconference meeting dates – for ICTN (Master plan study)
|
Short notice given for cancellation of meetings – especially when dealing with a large grouping (PIDA Focal points)
|
Enough notice to be given for cancellation of meetings.
|
|
Adama Deen |
April 13, 2020 |
Adama Deen (April 13, 2020 – April 17, 2020) |
Other |
Update from Last Week:
1. EAC pre-market sounding survey of prospective investors is progressing well accoording to CPCS consultants coordinating the online surveys on benhalf of EAC Secretariat and AUDA-NEPAD.
2. Continental High Speed Railway: Advocacy Consultancy (Draft Final Inception Report), will be submitted today for final review and onward transmission to relevant Nepad stakeholders
3. NEPAD COVID-19 Response: the Matrix (i.e., Table) of African governments Stimulus response to COVID-19 pandemic has been updated, looking at selected countries fiscal policy interventions.The Matrix will be finalized this week.
Activity plan for Next Week:
1. Update on EAC project packaging pre-market sounding survey
2. Supervisory oversight on the HSR Advocacy consultancy assignment by Louis
3. Update on NEPAD COVID-19 technical paper write-up
Challenges requiring attention:
Recommendations:
|
1. EAC pre-market sounding survey of prospective investors is progressing well accoording to CPCS consultants coordinating the online surveys on benhalf of EAC Secretariat and AUDA-NEPAD.
2. Continental High Speed Railway: Advocacy Consultancy (Draft Final Inception Report), will be submitted today for final review and onward transmission to relevant Nepad stakeholders
3. NEPAD COVID-19 Response: the Matrix (i.e., Table) of African governments Stimulus response to COVID-19 pandemic has been updated, looking at selected countries fiscal policy interventions.The Matrix will be finalized this week.
|
1. Update on EAC project packaging pre-market sounding survey
2. Supervisory oversight on the HSR Advocacy consultancy assignment by Louis
3. Update on NEPAD COVID-19 technical paper write-up
|
None
|
None
|
|
Simbini Tichakunda |
April 13, 2020 |
Simbini Tichakunda (April 13, 2020 – April 17, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
1. Reviewed the second draft of the Continental Power Systems Masterplan inception report
2. Held meeting with AfDB to discuss the Resource Mobilisation and stakeholder engagement
3. Reviewed the Supply chains paper.
4. Meeting with AUC and Environmental Sustainability to discuss possibility of a energy COViD-19 response
Activity plan for Next Week:
1. Review COVID 19 response papers
2. Coordinate the work on the continental Power Systems Masterplan Baseline Study.
|
1. Reviewed the second draft of the Continental Power Systems Masterplan inception report
2. Held meeting with AfDB to discuss the Resource Mobilisation and stakeholder engagement
3. Reviewed the Supply chains paper.
4. Meeting with AUC and Environmental Sustainability to discuss possibility of a energy COViD-19 response
|
1. Review COVID 19 response papers
2. Coordinate the work on the continental Power Systems Masterplan Baseline Study.
|
|
|
|
Axel Rusenga |
April 13, 2020 |
Axel Rusenga (April 13, 2020 – April 17, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
-COVID 19 paper-Impact on African infrastructure development
Activity plan for Next Week:
-Consultations with ALG and GIZ and assessment on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
-COVID 19 paper-Impact on African infrastructure development
– contribution questionnaire
|
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
-COVID 19 paper-Impact on African infrastructure development
|
-Consultations with ALG and GIZ and assessment on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
– Project Logframe
-COVID 19 paper-Impact on African infrastructure development
– contribution questionnaire
|
|
|
|
Adama Deen |
April 13, 2020 |
Adama Deen (April 13, 2020 – April 17, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
1. Gave my feedback/ comments on TGC-SEZ – Drfat Grant Cooperation/Agreement to colleagues
2. Recievd Proress Report/ preliminary feedback on the EAC pre-market sounding – Survey launched virtaully 10th April by CPCS consultants. Although progress is being made with regards to sounding prospective private/public investment in the selected projects, significant work still needs to be done, given the current respond rate of 16 respondents out of total of 55 sampled.
Notwitstanding, we plan to meet virtually with other potentail investors this week and next week hopefully.
3. HSR Advocacy Consultancy Supervision: Submitted on behalf of consultant (Louis Napo) – Deliverable no 2., to head of E.I Division, and other relevant actors
Activity plan for Next Week:
1. Follow-up on last week’s activities that are work-in-progress:
1.1 EAC pre-market sounding: DBSA consultation
1.2 ECOWAS pre-market sounding: CPCS/ECOWAS Commission
1.3 HSR Advocacy consultancy: review/comments on consultant’s submission paper: Deliverable no. 3.
2.0 Covid-19 NEPAD Response: Contribution paper: “Government Spending/Stimuli”, and impacts (hope to complete my contribution to this subject matter)
Challenges requiring attention:
Recommendations:
|
1. Gave my feedback/ comments on TGC-SEZ – Drfat Grant Cooperation/Agreement to colleagues
2. Recievd Proress Report/ preliminary feedback on the EAC pre-market sounding – Survey launched virtaully 10th April by CPCS consultants. Although progress is being made with regards to sounding prospective private/public investment in the selected projects, significant work still needs to be done, given the current respond rate of 16 respondents out of total of 55 sampled.
Notwitstanding, we plan to meet virtually with other potentail investors this week and next week hopefully.
3. HSR Advocacy Consultancy Supervision: Submitted on behalf of consultant (Louis Napo) – Deliverable no 2., to head of E.I Division, and other relevant actors
|
1. Follow-up on last week’s activities that are work-in-progress:
1.1 EAC pre-market sounding: DBSA consultation
1.2 ECOWAS pre-market sounding: CPCS/ECOWAS Commission
1.3 HSR Advocacy consultancy: review/comments on consultant’s submission paper: Deliverable no. 3.
2.0 Covid-19 NEPAD Response: Contribution paper: “Government Spending/Stimuli”, and impacts (hope to complete my contribution to this subject matter)
|
none
|
none
|
|
Daphine Muzawazi |
April 13, 2020 |
Daphine Muzawazi (April 13, 2020 – May 4, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Worked through CBN’s draft logo’s sent by GIZ comms expert and provided inputs.
Held an additional meeting with GIZ to bainstrom on the CBN communication materials including the proposed logo design.
Continued liaison with Letsema consultants on the stakeholder engagement process including following up with respective ‘no response’ stakeholders regarding the consultancy.
Finalized the draft AUDA-NEPAD in brief paper, EI section and sent through to communications.
Activity plan for Next Week:
Continue liaising with Letsema on the CBN institutional governance structure assignment
Plan for the CBN Technical Validation Workshop with GIZ and Letsema
Challenges requiring attention:
No responses from some of the CBN stakeholders. Need for further follow up from AUDA-NEPAD to engage them eg. SADC, ECCAS, EAC.
|
Worked through CBN’s draft logo’s sent by GIZ comms expert and provided inputs.
Held an additional meeting with GIZ to bainstrom on the CBN communication materials including the proposed logo design.
Continued liaison with Letsema consultants on the stakeholder engagement process including following up with respective ‘no response’ stakeholders regarding the consultancy.
Finalized the draft AUDA-NEPAD in brief paper, EI section and sent through to communications.
|
Continue liaising with Letsema on the CBN institutional governance structure assignment
Plan for the CBN Technical Validation Workshop with GIZ and Letsema
|
No responses from some of the CBN stakeholders. Need for further follow up from AUDA-NEPAD to engage them eg. SADC, ECCAS, EAC.
|
|
|
Ephrem Getahun |
April 6, 2020 |
Ephrem Getahun (April 6, 2020 – April 10, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
Focused on adding features for the PIDA PAP 2 Website. The following features have so far been implemented. Project submission workflow; adding, editing and validating project submissions. Access control with four levels of access; Sectoral Focal Point & PRC (View projects), National Focal Point (Add project and edit own project, REC Focal Point (Edit all projects in the assigned REC), AUC Administrator (Edit all projects and Manage Registered Users). ‘Frequently Asked Questions’ section have been added and populated. Documents download section added and populated.
Attended several one to one and group meetings with EI/GIZ teams as well as with colleagues at AUC/GIZ and consultant (CPCS) on PIDA PAP 2 Process website progress. The bilateral meetings included taking people through VPIC, AID and Job Creation Toolkit.
Reviewed the ToR for enhancement of the Job Creation Toolkit
Activity plan for Next Week:
Adding a webinar section in the PIDA PAP 2 website for use by National PIDA Focal Points and Task Force members.
Start working on the Job Creation Toolkit code with the objective of integrating the benchmark studies (industry ratios) currently underway. The Job Creation Toolkit needs to be integrated with the new industry ratios to allow job estimates be performed for more infrastructure sub-sectors types than the current 9 sub-sectors. This work must be completed by Jun 2020 ready for screening and selection of PIDA PAP 2 pipeline of projects.
|
Focused on adding features for the PIDA PAP 2 Website. The following features have so far been implemented. Project submission workflow; adding, editing and validating project submissions. Access control with four levels of access; Sectoral Focal Point & PRC (View projects), National Focal Point (Add project and edit own project, REC Focal Point (Edit all projects in the assigned REC), AUC Administrator (Edit all projects and Manage Registered Users). ‘Frequently Asked Questions’ section have been added and populated. Documents download section added and populated.
Attended several one to one and group meetings with EI/GIZ teams as well as with colleagues at AUC/GIZ and consultant (CPCS) on PIDA PAP 2 Process website progress. The bilateral meetings included taking people through VPIC, AID and Job Creation Toolkit.
Reviewed the ToR for enhancement of the Job Creation Toolkit
|
Adding a webinar section in the PIDA PAP 2 website for use by National PIDA Focal Points and Task Force members.
Start working on the Job Creation Toolkit code with the objective of integrating the benchmark studies (industry ratios) currently underway. The Job Creation Toolkit needs to be integrated with the new industry ratios to allow job estimates be performed for more infrastructure sub-sectors types than the current 9 sub-sectors. This work must be completed by Jun 2020 ready for screening and selection of PIDA PAP 2 pipeline of projects.
|
|
|
|
Lovasoa Christine Razanamahan |
April 6, 2020 |
Lovasoa Christine Razanamahan (April 6, 2020 – April 10, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
-Documentation review on the working paper 2 in the market and demand analysis of the infrastructure in Africa;
-Online meeting to compile and discuss the comments received on the working paper 2 with task force member in PIDA PAP 2 process;
-Online meeting with SDM expert service pool, to discuss the two projects submitted by the focal person to test the SDM tools;
-draft the concept note on the response to the COVID-19 impact on the infrastructure and financing projects in Africa;
-draft the progress report quarterly II.
Activity plan for Next Week:
-Online meeting preparatory of the UMA regional training in PIDA PAP 2 process;
-Online training on UMA regional training in PIDA PAP 2 process;
-Working on the paper to respond the COVID 19 impacts in employment and financing in infrastructure projects in Africa;
-Follow-up the mail exchange on testing the SDM tools;
-draft the minute of the EI regular meeting.
Challenges requiring attention:
To capture again the activities update for each EI team member during the EI regular meeting.
Recommendations:
-Each EI team member should fill online their activities update only rather than allowing everyone to tell that during the meeting one by one. However, those who have an urgent matter only can express their update.
-The standard agenda items should be changed as follows: 1) Matter rising from the last meeting; 2) Urgent matters based on the current activities; 3) AOB
File attachments:
|
-Documentation review on the working paper 2 in the market and demand analysis of the infrastructure in Africa;
-Online meeting to compile and discuss the comments received on the working paper 2 with task force member in PIDA PAP 2 process;
-Online meeting with SDM expert service pool, to discuss the two projects submitted by the focal person to test the SDM tools;
-draft the concept note on the response to the COVID-19 impact on the infrastructure and financing projects in Africa;
-draft the progress report quarterly II.
|
-Online meeting preparatory of the UMA regional training in PIDA PAP 2 process;
-Online training on UMA regional training in PIDA PAP 2 process;
-Working on the paper to respond the COVID 19 impacts in employment and financing in infrastructure projects in Africa;
-Follow-up the mail exchange on testing the SDM tools;
-draft the minute of the EI regular meeting.
|
To capture again the activities update for each EI team member during the EI regular meeting.
|
-Each EI team member should fill online their activities update only rather than allowing everyone to tell that during the meeting one by one. However, those who have an urgent matter only can express their update.
-The standard agenda items should be changed as follows: 1) Matter rising from the last meeting; 2) Urgent matters based on the current activities; 3) AOB
|
AUDA-NEPAD_EI-Team-Meeting-DRAFT-minutes_09-April-2020.docx |
Younes Touitha |
April 6, 2020 |
Younes Touitha (April 6, 2020 – April 10, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
– Had a task force meeting to review the working paper tools and reviewed the inception report on the continental master plan report and submit it;
– shared the UMA focal points name to AUC (Morocco and Libya);
– Participated, with the Task Force team, in the meeting to prepare for the PIDA PAP2 training in the North region on April 10, 2020.
– reviewed the Arabic version of the PIDA PAP2 training documents.
Activity plan for Next Week:
– He will work on one of the COVID 19 Paper;
– will participate in training by VC from the North region on the PIDA PAP2 process, on April 14 for English-speaking countries;
– will participate in training by VC from the North region on the PIDA PAP2 process, on April 15 for French-speaking countries
Challenges requiring attention:
Presence of focal points at the training meeting of April 14 and 15, 2020.
Recommendations:
Provide reminders for training and ensure, during training, communication and understanding of what is expected from the PIDA PAP2 process.
|
– Had a task force meeting to review the working paper tools and reviewed the inception report on the continental master plan report and submit it;
– shared the UMA focal points name to AUC (Morocco and Libya);
– Participated, with the Task Force team, in the meeting to prepare for the PIDA PAP2 training in the North region on April 10, 2020.
– reviewed the Arabic version of the PIDA PAP2 training documents.
|
– He will work on one of the COVID 19 Paper;
– will participate in training by VC from the North region on the PIDA PAP2 process, on April 14 for English-speaking countries;
– will participate in training by VC from the North region on the PIDA PAP2 process, on April 15 for French-speaking countries
|
Presence of focal points at the training meeting of April 14 and 15, 2020.
|
Provide reminders for training and ensure, during training, communication and understanding of what is expected from the PIDA PAP2 process.
|
|
Daphine Muzawazi |
April 6, 2020 |
Daphine Muzawazi (April 6, 2020 – April 10, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Drafted the concept note on the impact of mitigation measures of COVID19 on SME’s and the economy. Engaged in a weekly call with GIZ and Letsema on CBN to discuss progress on the stakeholder engagements. All stakeholders have been contacted with some responses and interviews set up. AUDA-NEPAD will draft follow up emails on the no responses. AUDA, GIZ and Letsema also agreed to hold bi-weekly meetings to update on the consultancy.
Activity plan for Next Week:
To send out follow up emails to the ‘no response’ list. Continue engagement with GIZ on the CBN comms and corporate branding.
Challenges requiring attention:
12 stakeholders from the proposed list have not responded to the letters and communication from Letsema.
Recommendations:
For EI management to assist in follow up emails to the respective stakeholders.
|
Drafted the concept note on the impact of mitigation measures of COVID19 on SME’s and the economy. Engaged in a weekly call with GIZ and Letsema on CBN to discuss progress on the stakeholder engagements. All stakeholders have been contacted with some responses and interviews set up. AUDA-NEPAD will draft follow up emails on the no responses. AUDA, GIZ and Letsema also agreed to hold bi-weekly meetings to update on the consultancy.
|
To send out follow up emails to the ‘no response’ list. Continue engagement with GIZ on the CBN comms and corporate branding.
|
12 stakeholders from the proposed list have not responded to the letters and communication from Letsema.
|
For EI management to assist in follow up emails to the respective stakeholders.
|
|
Abdou Rahman Mboob |
April 6, 2020 |
Abdou Rahman Mboob (April 6, 2020 – April 10, 2020) |
Availability, Accessibility and Affordability of Communication, Energy, Water & Transportation Services |
Update from Last Week:
1. Attended Task-force review meeting on working paper 2 and North Africa PIDA PAP 2 Training Workshop Prep
2. Review PIDA PAP 2 – Market Demand Study Consultancy Report – working Paper 2; provide comments and list of reference documents to share with consultants (CPCS) as agreed in Task-force review meeting.
3. PIDA PAP 2 – Website launch – Registration done
4. Review revised Draft Final Inception Report – Continental Systems Master Plan – Submitted by EU-TAF Consulting Team
5. Attended a Virtual Meeting with the Egyptian team led by Eng. Ahmed with Tich to review proposed meeting arrangement and updated Agenda for ICTN/CSMP
6. Administrative issues/ matters – undertaken
7. Attended VC Preparatory Meeting for PIDA PAP 2- Task-force workshop training of North Africa (14-15th April 2020) – on Friday 10th April 2020.
Activity plan for Next Week:
1. Attend Task-force training workshop for North Africa – including UMA and English speaking countries that missed their regional training – 14th -15th April 2020.
2. Contribute to COVID 19 paper on Cyber security.
Challenges requiring attention:
Time given to review documents – especially if more than one document is to be reviewed.
Recommendations:
Provide adequate time/dead line especially if more than one paper is to be reviewed to avoid clash.
|
1. Attended Task-force review meeting on working paper 2 and North Africa PIDA PAP 2 Training Workshop Prep
2. Review PIDA PAP 2 – Market Demand Study Consultancy Report – working Paper 2; provide comments and list of reference documents to share with consultants (CPCS) as agreed in Task-force review meeting.
3. PIDA PAP 2 – Website launch – Registration done
4. Review revised Draft Final Inception Report – Continental Systems Master Plan – Submitted by EU-TAF Consulting Team
5. Attended a Virtual Meeting with the Egyptian team led by Eng. Ahmed with Tich to review proposed meeting arrangement and updated Agenda for ICTN/CSMP
6. Administrative issues/ matters – undertaken
7. Attended VC Preparatory Meeting for PIDA PAP 2- Task-force workshop training of North Africa (14-15th April 2020) – on Friday 10th April 2020.
|
1. Attend Task-force training workshop for North Africa – including UMA and English speaking countries that missed their regional training – 14th -15th April 2020.
2. Contribute to COVID 19 paper on Cyber security.
|
Time given to review documents – especially if more than one document is to be reviewed.
|
Provide adequate time/dead line especially if more than one paper is to be reviewed to avoid clash.
|
|
Simbini Tichakunda |
April 6, 2020 |
Simbini Tichakunda (April 6, 2020 – April 10, 2020) |
Enhanced inter and intra-regional trade |
Update from Last Week:
1. Reviewed the continental transmission masterplan inception report.
2. Reviewed the PIDA Market Demand Study Working Paper 2 and provided consolidated comments from the team to the AUC.
3. Participated in the PIDA Market Demand Study Taskforce team to discuss the PIDA Market Demand Working Paper 2.
4. Provided inputs to the Paper on COVID-19 Supply Chain Effects
5. Help meeting with the Egypt team for a preliminary discussion of the Implementation Plan and Egypt’s role as a champion of the Continental Transmission Masterplan.
Activity plan for Next Week:
1. Participate in the UMA PIDA PAP 2 Selection criteria training
2. Coordinate the drafting of COVID-19 papers
3. Circulate the Continental Transmission Masterplan Inception Report to Power Pools, RECs and other Stakeholders.
4. Organise followup meeting with Egypt
|
1. Reviewed the continental transmission masterplan inception report.
2. Reviewed the PIDA Market Demand Study Working Paper 2 and provided consolidated comments from the team to the AUC.
3. Participated in the PIDA Market Demand Study Taskforce team to discuss the PIDA Market Demand Working Paper 2.
4. Provided inputs to the Paper on COVID-19 Supply Chain Effects
5. Help meeting with the Egypt team for a preliminary discussion of the Implementation Plan and Egypt’s role as a champion of the Continental Transmission Masterplan.
|
1. Participate in the UMA PIDA PAP 2 Selection criteria training
2. Coordinate the drafting of COVID-19 papers
3. Circulate the Continental Transmission Masterplan Inception Report to Power Pools, RECs and other Stakeholders.
4. Organise followup meeting with Egypt
|
|
|
|
Vincent Moola |
April 6, 2020 |
Vincent Moola (April 6, 2020 – April 10, 2020) |
Enhanced inter and intra-regional trade |
Update from Last Week:
1. Was able to join the Covid -19 AUDA Team on Pharmaceuticals Manufacturers in Africa.
2. Held a meeting with IOM Regional office in SA on areas of cooperation with AUDA
3. Had worked on SEZ- Gambia on the Agreement, with the focal pint person.
4. Attended the Supply chains webinar with Harvard University
5. held discussions on markets Mapping and prioritization with Head of Division
6. Contibuted to the Covid -19 AUDA Papers specifically on the effects of supply chain and economic impact on the continent.
Activity plan for Next Week:
1. Participating in a meeting with JICA on the OSBP support and other related programs
2. To attend a meeting on the protectionism in the pandemic
3. contributing to various COVID-19 Papers.
4. Improving the mapping and prioritization on the Markets sections of Trade
5. AfCFTA Prioritisation meeting
6. etc
|
1. Was able to join the Covid -19 AUDA Team on Pharmaceuticals Manufacturers in Africa.
2. Held a meeting with IOM Regional office in SA on areas of cooperation with AUDA
3. Had worked on SEZ- Gambia on the Agreement, with the focal pint person.
4. Attended the Supply chains webinar with Harvard University
5. held discussions on markets Mapping and prioritization with Head of Division
6. Contibuted to the Covid -19 AUDA Papers specifically on the effects of supply chain and economic impact on the continent.
|
1. Participating in a meeting with JICA on the OSBP support and other related programs
2. To attend a meeting on the protectionism in the pandemic
3. contributing to various COVID-19 Papers.
4. Improving the mapping and prioritization on the Markets sections of Trade
5. AfCFTA Prioritisation meeting
6. etc
|
|
|
|
Adama Deen |
April 6, 2020 |
Adama Deen (April 6, 2020 – April 10, 2020) |
Other |
Update from Last Week:
1. EAC project packaging consultancy – pre-market sounding launched last week (10 april 2020);
2. Had Virtual meeting with Stakeholders last week Wednesday to review the EAC packaging Workplan activities; and also agreed to extend the duration of the Contract (“on no cost basis”), due to unforeseen delays including COVID-19;
3. Completed the Trans-Gambia Corridor (TGC) – Special Economic ZOne (SEZ) – Project Brief; and Draft Technical Support Grant Agreement, with colleage (Vincent). We need to schedule a meeting with officials of the Ministry of Trade… to discuss the draft Agreement, before being finalised (awaiting feedback from Vincent and Towela);
4. Reviewed Draft Zero (V0) Report (Deliverable no1 for March 2020), submitted by Mr Louis Napo, HSR Consultant;
5. Agreed to contribute to COVID-19 NEPAD response; technical paper: dealing with national governments approach to mitigating the impacts of COVID on African economies.
Activity plan for Next Week:
1. Final review, and submission, of Deliverable no1 for March 2020, by Mr Louis Napo, HSR Consultant;
2. Submission of draft zero on “Government Spending” for COVID-19 NEPAD response.
Challenges requiring attention:
Recommendations:
|
1. EAC project packaging consultancy – pre-market sounding launched last week (10 april 2020);
2. Had Virtual meeting with Stakeholders last week Wednesday to review the EAC packaging Workplan activities; and also agreed to extend the duration of the Contract (“on no cost basis”), due to unforeseen delays including COVID-19;
3. Completed the Trans-Gambia Corridor (TGC) – Special Economic ZOne (SEZ) – Project Brief; and Draft Technical Support Grant Agreement, with colleage (Vincent). We need to schedule a meeting with officials of the Ministry of Trade… to discuss the draft Agreement, before being finalised (awaiting feedback from Vincent and Towela);
4. Reviewed Draft Zero (V0) Report (Deliverable no1 for March 2020), submitted by Mr Louis Napo, HSR Consultant;
5. Agreed to contribute to COVID-19 NEPAD response; technical paper: dealing with national governments approach to mitigating the impacts of COVID on African economies.
|
1. Final review, and submission, of Deliverable no1 for March 2020, by Mr Louis Napo, HSR Consultant;
2. Submission of draft zero on “Government Spending” for COVID-19 NEPAD response.
|
None
|
None
|
|
Axel Rusenga |
April 6, 2020 |
Axel Rusenga (April 6, 2020 – April 10, 2020) |
Increased domestic public and private investments in infrastructure |
Update from Last Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-Progress Reports
-EI Risk Register
-Drafting of PPP outcome discussion
-Coordination of Project Logframe
-COVID 19 paper-Impact on African infrastructure development
Activity plan for Next Week:
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
-Coordination of Project Logframe
-COVID 19 paper-Impact on African infrastructure development
|
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-Progress Reports
-EI Risk Register
-Drafting of PPP outcome discussion
-Coordination of Project Logframe
-COVID 19 paper-Impact on African infrastructure development
|
-Consultations with ALG and GIZ and assessement on projects to be run through the SDM PQL
-Follow up with Focal points
-EI Risk Register
-Coordination of Project Logframe
-COVID 19 paper-Impact on African infrastructure development
|
|
|
|
Daphine Muzawazi |
March 30, 2020 |
Daphine Muzawazi (March 30, 2020 – April 3, 2020) |
Increased private sector engagement in cross-border infrastructure projects |
Update from Last Week:
Held a meeting with CBN interim Chairperson, Mr. Hubert Danso, and he gave his inputs and comments on the ongoing CBN assignment and reports. He suggested the assignment to also focus on the sustainable funding strategy for the CBN. AUDA-NEPAD agreed to sent through some documentation for Mr. Danso’s review and inputs and will facilitate a meeting between the consultants and Hubert next week.
Reviewed and provided updates and inputs to the ‘AUDA-NEPAD in brief’ document, mainly the EI section. Circulated to the units heads for comments. Consolidated, finalized and send to Programme Head.
Activity plan for Next Week:
Sent through documentation to Hubert Danso for review. Facilitate a meeting between Letsema and Hubert. Set up meeting request with NEPAD Business Foundation on collaboration and the CBN assignment.
Provide inputs and updates on the project brief for PSD unit.
|
Held a meeting with CBN interim Chairperson, Mr. Hubert Danso, and he gave his inputs and comments on the ongoing CBN assignment and reports. He suggested the assignment to also focus on the sustainable funding strategy for the CBN. AUDA-NEPAD agreed to sent through some documentation for Mr. Danso’s review and inputs and will facilitate a meeting between the consultants and Hubert next week.
Reviewed and provided updates and inputs to the ‘AUDA-NEPAD in brief’ document, mainly the EI section. Circulated to the units heads for comments. Consolidated, finalized and send to Programme Head.
|
Sent through documentation to Hubert Danso for review. Facilitate a meeting between Letsema and Hubert. Set up meeting request with NEPAD Business Foundation on collaboration and the CBN assignment.
Provide inputs and updates on the project brief for PSD unit.
|
|
|
|