The project involves conducting the feasibility studies in respect of the design, development, operation and maintenance of a High Voltage Direct Current (HVDC) transmission scheme that will deliver 5,000 MW of electricity to South Africa under the Inga 3 Low Head Project. The HVDC transmission Scheme will traverse Zambia, Zimbabwe and/or Botswana (Transit Countries). The project objectives are to:
• Undertake feasibility studies in respect of the design, development, operation and maintenance of a High Voltage Direct Current (HVDC) transmission scheme from DRC to South Africa, going through Botswana, Zambia and Zimbabwe.