Integration of Electrical Networks between: Inga – Cabinda and Point Noire

Integration of Electrical Networks between: Inga – Cabinda and Point Noire

EN-NEPAD-PIDA-PAP2-Project-Prospectus-Web-1-92_44-44

Project aimed at securing the service to the cities of the Inga-Moanda-Boma-Cabinda-Pointe Noire-Brazzaville-Kinshasa-Inga loop and the ramp of the future backbone of the Corridor Maquela-Do Zombo-Inga-Cabinda-Pointe Noire-Gabon-Equatorial Guinea- Cameroon-Chad. The project objectives are to:
• Increase the energy supply in the region
• Make the availability of electrical energy reliable on the network of the 3 countries
• Contribute to the socio-economic development of these countries
• Promote trade in electricity and regional integratio

Skills

Posted on

September 6, 2023

PIDA VPIC Upgrade Notice

Upgrade Notice
PIDA is currently undergoing system upgrades to serve you better. The new version will be ready on January 31st, 2025.

This will close in 20 seconds

Share This