Masaka – Mwanza Transmission Line Project

Masaka – Mwanza Transmission Line Project

Download Prospectus

The 220kV-400 kV cross-national transmission line project is composed by: (i) overhead power line, for the transmission and distribution of electricity between the cities of Masaka (Uganda) and Mwanza (Tanzania); and (ii) substations for the interconnection of the energy systems for the supply of energy for consumers along the line route. The project objectives are to:
• Enhance electricity trade among East African countries and, particularly, between Tanzania and Uganda, contributing to the establishment of the Eastern Africa Power Pool
• Improve security and reliability of electric power supply in the region
• Foster economic development and regional integration
• Improve operational and technical performance of the interconnected grids.

Skills

Posted on

September 6, 2023

PIDA VPIC Upgrade Notice

Upgrade Notice
PIDA is currently undergoing system upgrades to serve you better. The new version will be ready on January 31st, 2025.

This will close in 20 seconds

Share This