Construction of Central Corridor Standard Gauge Rail (SGR) of the Dar es Salaam – Isaka – Mwanza and Isaka – Kigali/Keza – Gitega – Musongati/Tabora – Kigoma/Uvinza – Musongati – Gitega (with extension to the Eastern DRC) Transport ← Construction of a Bridge over the Oubangui River, Development of Missing Links in the Bangui-Kisangani-Kampala and Kisangani-Bujumbura Road Corridors, and Facilitation of Transport, Trade and Transit along the Two Corridors Construction of Standard Gauge Railway (SGR) from Mtwara/ Mbamaba – Liganga to Mchuchuma →
You must be logged in to post a comment.